Department of Climate, Energy and the Environment
FOI Requests — 1,589 records (page 2 of 32)
- Received 16 April 2026Decided 21 April 2026TransferredDepartment of Climate, Energy and the Environment
Terms and conditions for the FEPS Scheme (2007). Can you email information about this forestry scheme – which dates back to 2007.
- Received 16 March 2026Decided 14 April 2026RefusedDepartment of Climate, Energy and the Environment
(1) Any Regulation 54 derogation applications, assessments, correspondence, and decisions relating to all survey work, planning, construction, other activities or operation of the proposed Codling Wind Park (“CWP”) off the East Coast of Ireland, including but not limited to MARA application MUL230034 MUL230034 - MARA - Maritime Area Regulatory Authority, including the original and extended areas now proposed: (2) Any application made CWP to NPWS in response to attached request of MARA to CWP of 2 October 2025 as to whether or not CWP were applying for Article 54 Derogation licence. We believe it was filed 21 October 2025.This is confirmed at item 607 of the NPWS October 2025 list of Derogation Applications and in letter of 22 October 2025 from CWP to MARA confirming CWP engagement with NPWS. (3) Any query and other communication between NPWS and CWP about its application for Derogation license of 21 October 2025 which gave rise to the indication at item 607 of the NPWS listing reference that there was a “query with applicant” or otherwise. (4) Any query and other communication between NPWS to CWP about its application for Derogation license of 21 October 2025 which was followed by CWP letter of 21 November 2025 that CWP did not require a Derogation licence. (5) any NPWS guidance or instructions available to or issued to Codling Wind Park and/or MARA specific to MUL230034, including but not limited to NPWS Guidance (1 July 2025) stating that where derogations appear necessary, they should be decided before development consent. (6) any Art 54 Derogation licences applied for by Codling Wind Park under MMO reports or post completion returns received for activities under its previous Foreshore Licence applications including FS007546, FS007045 or planning permission applications or otherwise, including applications and licences granted. (7) We are instructed that NPWS website list of derogation applications has been inaccessible and “under maintenance” since 10 December 2025, preventing the public and indeed MARA checking did Codling Wind Park have a derogation licence application and what became of their application of 21 October 2026. Please furnish details of what became of the CWP derogation application of 21 November 2025 to NPWS and any communications between NPWS and CWP and/or MARA arising from this since 21 November 2025. (8) Any changes to NPWS 2014 marine mammal mitigation guidance (MMO guidance) particularly addressing the standards required to assess disturbance to protected species. (9) Does NPWS assess disturbance to protected species in any applications for Art 54 Derogation Licences for Offshore Wind Farms and if so what methodology or standard does it use.
- Received 16 March 2026Decided 10 April 2026Part-GrantedDepartment of Climate, Energy and the Environment
records of all communications between Minister of State (DCEE) Timmy Dooley TD and Minister of State Noel Grealish TD from January 23rd, 2025, to date regarding the protection of Lough Corrib SAC as a salmonid fishery; the preparation of a Western Lakes Management Plan; the threat of invasive species to the integrity of Lough Corrib SAC and policy discussions/suggestions with respect to inland fisheries.
- Received 9 March 2026Decided 8 April 2026RefusedDepartment of Climate, Energy and the Environment
NLPMS Complete Audit, Litter Management, Industry Programmes, EPR, and Legislative Framework Date range: 1 January 1999 to the present date (NLPMS contracts/methodology); 1 January 2010 to the present date (expenditure, enforcement, campaigns); 1 January 2020 to the present date (policy, upgrades, digital) DCEE has policy responsibility for litter monitoring, the NLPMS (operating since 1999 under contract to Tobin Consulting Engineers), anti-litter infrastructure, the Gum Litter Taskforce, EPR scheme development, environmental education oversight, and implementation of the Circular Economy Act 2022. The NLPMS generates over 5,000 local authority surveys annually. The 2024 results show litter pollution is worsening: unpolluted areas fell from 21.5% to 19.2%. A NLPMS — Contract and Procurement History (1999–Present) B NLPMS — Methodology and Data Capabilities C NLPMS — Surveyor Training and Quality Assurance D NLPMS — Hidden Costs: Local Authority Staff Time E NLPMS — Data Ownership and Access F NLPMS — Independent Review and Evaluation G Local Authority LiYer Management — Expenditure and Enforcement H Local Authority LiYer Management Plans I AnZ-LiYer Awareness Campaigns J FixYourStreet.ie K Industry-Funded Environmental EducaZon Programmes L TidyTowns M Extended Producer Responsibility and Brand-Level Data N Lobbying O ExisZng CiZzen Science and Environmental Monitoring Programmes P State-Funded Digital Pla[orms — Complete Inventor Q Consultant and Contractor Ecosystem R InternaZonal Legal ObligaZons — Environmental Monitoring S Staffing and InsZtuZonal Responsibility Section 13: Multiple bodies (see subsections) Consolidated Requests to Additional State Bodies H Departmental Submissions Received — All Departments
- Received 3 March 2026Decided 7 April 2026RefusedDepartment of Climate, Energy and the Environment
1. Daily and annual water WITHDRAWAL figures for all data centres connected to the Uisce Eireann network in the Greater Dublin Area, Cork, and Limerick for the period 2020 to 2026 inclusive. 2. Daily and annual water EVAPORATION and CONSUMPTION figures (Water Use Efficiency metrics) for the same data centres and period. 3. Thermal discharge data for all data centres discharging cooling water to rivers, estuaries, or coastal waters — including temperature differentials, volume, and discharge coordinates — for 2020 to 2026. 4. All correspondence, assessments, and reports held by your organisation regarding the water use implications of CRU Decision CRU/25/236 (December 2025) — including any risk assessments, sustainability appraisals, or environmental screening carried out prior to that decision. 5. The full terms of any Non-Disclosure Agreements (NDAs) entered into between your organisation and data centre operators that relate to water consumption, thermal discharge, or Water Use Efficiency data. 6. Any Water Use Efficiency (WUE) targets, conditions, or monitoring requirements imposed on data centres as a condition of connection to the national water supply or electricity network — or confirmation that no such conditions exist. 7. Records of any public consultation conducted in relation to CRU Decision CRU/25/236, including details of who was consulted, what information was made available to the public, and whether any Aarhus Convention obligations were assessed prior to the decision…
- Received 19 March 2026Decided 2 April 2026WithdrawnDepartment of Climate, Energy and the Environment
I am seeking records relating to the transposing of the Energy Efficiency Directive. Please provide any communication sent or received by the Department in relation to the transposing of the Energy Efficiency Directive and any delays in accomplishing this since September 2025. This includes any internal or external letters, emails, memos, reports, briefing material, or presentations relating to the above. On 31/03/2026 the request was refined to … The particular aspect I'm looking for is the EU database on energy use by data centres.
- Received 27 March 2026Decided 1 April 2026WithdrawnDepartment of Climate, Energy and the Environment
1. Any Regulation 54 derogation applications, assessments, correspondence, and decisions relating to surveys authorized under or related to MARA Foreshore application MUL230034, particularly made by Codling Wind Farm (hereinafter “CWP”) or its CEO to NPWS or any other party or representative in particular Derogation application made by ………………………… which appeared incorrectly on your website as being from “Cooling”. 2. Any application made CWP to NPWS in response to attached request of MARA to CWP as to whether or not CWP were applying for Article 54 Derogation licence. 3. Any query and other communication between NPWS to CWP about its application for Derogation license of 21 October 2025 which gave rise to the indication at st that there was a “query with applicant”. 4. Any query and other communication between NPWS to CWP about its application for Derogation license of 21 October 2025 which was followed by the attached CWP letter of 21 November 2025 that CWP did not require a Derogation licence. 5. Any NPWS guidance or instructions issued to Codling Wind Park and/or MARA specific to MUL230034; We draw attention to NPWS Guidance (1 July 2025) stating that where derogations appear necessary they should be decided before development consent. 6. Any Art 54 Derogation licences applied for by Codling Wind Park under MMO reports or post- completion returns received for activities under its previous Foreshore Licence applications including FS007546, FS007045 or otherwise, applications and licences granted.
- Received 24 March 2026Decided 27 March 2026Part-GrantedDepartment of Climate, Energy and the Environment
.. records of the full submission received from the Lough Corrib Pike Research & Control Group for the public consultation on the Wild Salmon and Sea Trout Tagging Scheme (Amendment) Regulations 2025 & Conservation Measures for the 2026 Season as referenced in the published Public Consultation Report.
- Received 19 February 2026Decided 26 March 2026GrantedDepartment of Climate, Energy and the Environment
Please forward me a list of and copies of ALL information known to you that pertains to the site selection process, including short listing and criteria and scoring for the state led LNG terminal proposed to be located on Clare side of Shannon Estuary.
- Received 10 February 2026Decided 24 March 2026GrantedDepartment of Climate, Energy and the Environment
Scope and period Please provide records from 1 January 2023 to the date of your decision on this request, including draft and final records, in all forms and media, including emails and attachments, letters, meeting invitations, minutes, notes, aide-memoires, submissions, briefing notes, memoranda, reports, appendices, presentations, spreadsheets, scoring sheets, working papers, GIS files, model inputs/outputs, maps, procurement records, contracts, and correspondence with third parties. A. AIE REQUEST — Environmental Information Please provide all environmental information held by or for the Department of Climate, Energy and the Environment concerning the identification, screening, assessment, comparison, recommendation, and selection of the SGER terminal site in County Clare/Cahiracon and alternatives elsewhere, including the following categories: 1) Site options universe and screening trail - Longlist and shortlist of candidate sites. - Inclusion/exclusion decisions for each site and reasons. - Records of any “gateway” criteria used to eliminate sites. 2) Methodology and criteria - Terms of reference and methodological documents. - Criteria definitions, thresholds, scoring rules, and weighting methodology. - Any amendments to criteria/weightings and records explaining why changes were made. - Sensitivity analysis and robustness testing. 3) Comparative assessment outputs - Multi-criteria analysis outputs, ranking tables, scoring matrices. - Cost-benefit analyses and option appraisal summaries. - Working spreadsheets and model files used to derive rankings. - Environmental constraints mapping/GIS overlays. 4) Risk and receiving-community assessment at site-comparison stage - Hazard identification and consequence-screening records used in site comparison. - Assumptions used for population exposure, land use, vulnerable receptors, emergency response capability, and meteorology. - Records addressing residual risk allocation to nearby/receiving communities. 5) Consultants and external advisers - Procurement records, requests for tender/quotes, award records. - Contracts, scopes of work, deliverables, presentations, and author lists. - Records identifying who prepared each key assessment and recommendation. 6) Recommendation and approval chain - First record recommending Cahiracon (or any preferred site). - All subsequent recommendation records, including revisions. - Minutes/notes/decision papers where recommendations were considered, accepted, modified, or escalated- Correspondence with other public bodies relating to preferred-site rationale. 7) Substantiation of public statements - Records evidencing public statements regarding: (a) number of coastal sites considered, (b) criteria used (technical/environmental/financial/planning), (c) use of multi-criteria and/or cost-benefit methods. 8) Records held “for” the Department of Climate, Energy and the Environment - Any records held by consultants/contractors on behalf of [Authority Name] concerning the above. 9) Search details - A note of record systems searched, date ranges, and business units searched.
- Received 25 February 2026Decided 23 March 2026RefusedDepartment of Climate, Energy and the Environment
I am writing to request access to environmental information relating to the public consultation on National Territory Mapping for Renewable Electricity. Specifically, I request the following: 1. All submissions received, in their entirety, including those submitted by: Individuals Organisations Industry groups NGOs Any other stakeholders 2. Any associated attachments, annexes, or referenced documents included with those submissions. 3. A copy of the consultation closing report, summary report, or any document compiling or analysing the submissions received, if available. If any information is withheld on the basis of exemptions, I request that you: Provide a log of withheld items with reasons for non-disclosure, and Release any non-exempt portions of the submissions.
- Received 20 January 2026Decided 19 March 2026RefusedDepartment of Climate, Energy and the Environment
Copies of all requests for legal advice sent to (i) the Attorney General; and (ii) external lawyers for legal advice on the Scale of Fees Under the Planning and Development Act 2024 and/or costs provisions in the 2024 Act. Copies of all legal advice received, whether requested or not from the AG or external lawyers in relation to the Scale of Fees Under the Planning and Development Act 2024 and/or costs provisions in the 2024 Act. Copies of all requests for legal advice or legal advice received (whether requested or not) relating or referring to the public consultation on the above.
- Received 23 February 2026Decided 13 March 2026RefusedDepartment of Climate, Energy and the Environment
I am writing to formally request specific information Noted below related Wind Energy Development Guidelines (WEDG). Information Requested Report titled 'Spatial Modelling of the Wind Energy Resource in Ireland', prepared by RPS Group Ltd for SEAI.
- Received 16 January 2026Decided 13 March 2026RefusedDepartment of Climate, Energy and the Environment
Under AIE I wish to request electronic copies of all submission to the consultation entitled “Consultation on the regulation of costs payable in matters prescribed on foot of section 294 of the Planning and Development Act 2024 (Scale of Fees)” which closed at 5.30pm on 15 January 2026.
- Received 4 March 2026Decided 6 March 2026WithdrawnDepartment of Climate, Energy and the Environment
my request for inland fisheries to provide TEGOS data and methods that informed the Boyne status to move for C and R so closed so that i can have it verified independently prior to the 5th March deadline Please include The full dataset and metadata used in the Boyne assessment, including all uncertainty and assumptions around the 75% predicted return. Documentation outlining how Blackcastle counters reliability was assessed and incorporated into the modelling. Please include downtime logs, independent calibrations records and any corrections made for high or low flows Details of how climate variation, drought conditions, and low flows are weighted and/or modelled in return estimates. Clarification on if and how structural barriers like Balmoral weir are incorporated into Conservation Limit (CL) modelling how its impact was treated Can this be provided as a matter of urgency with your deadline approaching of the 5th March for the second round and will take a few days for me to get it verified
- Received 30 January 2026Decided 27 February 2026RefusedDepartment of Climate, Energy and the Environment
Please provide us with an electronic copy of: The Land Use Review Phase II Report entitled ‘A Living Land’ presented to the Minister for Agriculture, Food and the Marine, Martin Heydon, to the Minister of State at Housing, Local Government and Heritage, Christopher O'Sullivan, and the Minister for Climate, Energy and the Environment, Darragh O'Brien in May 2025.
- Received 30 January 2026Decided 27 February 2026RefusedDepartment of Climate, Energy and the Environment
The program for government commits to implementing Phase II of the Land Use Review. The stakeholder engagement ended in or around March 2025 and it is understood that a report has now been sent to government and a draft has been sent to the Attorney General. Under AIE we request on behalf of An Taisce copies of the draft Phase II Land Use Review report submitted to the government and a copy of the draft report submitted to the Attorney General if he has been sent a different version.
- Received 27 January 2026Decided 26 February 2026Part-GrantedDepartment of Climate, Energy and the Environment
Scope / time period Please search records from 1 January 2003 to present, or the earliest date for which relevant records are held. This period includes Ireland’s preparation for, and implementation of, the EU Energy Performance of Buildings Directive and subsequent policy evolution. Environmental information requested (non-exhaustive) 1. Any policy papers, briefing notes, submissions to Ministers, impact assessments, or internal guidance held by the Department that discuss: • the scope and objectives of BER or related energy-performance policy, and • whether indoor environmental quality, radon risk, ventilation, moisture/mould, or health impacts were considered. 2. Any correspondence (including emails, letters, or meeting records) between the Department and SEAI, DHLGH, EPA, HSE, NSAI, or EU institutions referencing: • radon or radon risk, • ventilation or airtightness, • indoor air quality, moisture or mould, • or health and wellbeing impacts associated with energy-efficiency or retrofit policy. 3. Any records of interdepartmental groups, committees, consultations, or stakeholder engagements where potential interactions between energy efficiency objectives and human health or indoor environmental quality were discussed. 4. Any documents addressing whether Ireland’s national environmental or public-health context, including its elevated radon risk profile, warranted specific consideration or policy treatment when transposing or implementing EU energy-performance requirements. 5. Any records reflecting consideration of potential trade-offs between climate/energy objectives and indoor environmental quality or health, including whether safeguards or complementary measures were discussed. 6. Any records, memoranda, briefing notes, or correspondence indicating that radon, indoor air quality, ventilation-related health impacts, or moisture/mould were considered to fall outside the scope of energy-performance or BER policy, including any rationale recorded for such exclusion or deferral to other regulatory frameworks. On 28/01/2026 the request was refined to: Timeframe • Records from 2014 to present, corresponding with the publication and implementation of the National Radon Control Strategy (NRCS). Subject focus • Records relating to: • the BER Advisory Report and its revision to include information on radon; • consideration of radon risk within energy performance / BER policy; • any assessment of the interaction between energy efficiency measures, airtightness, ventilation, and radon exposure. Clarification of scope (to avoid ambiguity) For clarity, the request is focused on policy development and consideration, including: • briefing notes, policy papers, submissions, and decision records relating to: • why radon information was incorporated into the BER Advisory Report; • the extent to which radon risk was treated as advisory versus risk-mitigating; • whether ventilation trade-offs associated with energy efficiency measures were considered in that context. I am not seeking: • routine administrative correspondence, • individual dwelling files, • or records duplicated in other departments’ holdings.
- Received 26 January 2026Decided 25 February 2026GrantedDepartment of Climate, Energy and the Environment
A copy of any correspondence with CEPA, the CRU, the EPA, or any electricity generator, as well as any minutes, notes of meetings or phone calls, or other records, wherein there is analysis or discussion of the operation of gas-fired power plants on distillate fuel, dated between July 2024 and January 2026; A copy of any correspondence with CEPA in relation to the inclusion or non-inclusion of gas- fired power plants operating on distillate fuel in their analysis for their 2022 report and their 2025 report on energy security; A copy of any internal documents in relation to the inclusion or non-inclusion of gas-fired power plants operating on distillate fuel in the analysis the Department commissioned from CEPA leading to reports in 2022 and 2025.
- Received 13 February 2026Decided 18 February 2026WithdrawnDepartment of Climate, Energy and the Environment
Under the AIE Regulations can you provide the detailed calculations (including the input factors) for the “Water Balance Test” for the Bettystown Groundwater Body which is showing at poor status https://www.catchments.ie/data/#/waterbody/IE_EA_G_016?_k=p1j9ml I would just like to clarify that I would like to get a break down of the abstractions in the response to include identify of location and amount of abstraction.
- Received 5 January 2026Decided 6 February 2026Part-GrantedDepartment of Climate, Energy and the Environment
…records of all submissions received for the public consultation on the draft 2025 Wild Salmon and Sea Trout Tagging Scheme Regulations held between November 21st and December 20th 2025 inclusive.
- Received 5 January 2026Decided 4 February 2026RefusedDepartment of Climate, Energy and the Environment
This is an AIE request concerning the methodology for projecting GHG emissions. Could you please let me know whether projected emissions from data centres which have a connection agreement are included in projected carbon emissions published by the EPA and against which carbon budgets are measured. Could you also let me know whether the Carbon Budgets have already taken into account these emission, i.e. emissions where there is a contract in place, but the project has yet to commence.
- Received 5 January 2026Decided 3 February 2026Part-GrantedDepartment of Climate, Energy and the Environment
• Briefings provided to the Minister between 01/06/2025 and 30/11/2025 in relation to Ireland's new Strategic Gas Emergency Reserve (SGER) / the Floating Storage and Regasification Unit (FSRU). • Briefings provided to the Minister between 01/06/2025 and 30/11/2025 on the cost of the unit. • Documents produced between 01/06/2025 and 30/11/2025 in relation to the cost-benefit analysis undertaken as part of the decision to pursue the unit. • Minutes of meetings held between 01/06/2025 and 30/11/2025 between the Department and Gas Networks Ireland in which the cost and frequency of use of the strategic gas emergency reserve unit were discussed.
- Received 29 December 2025Decided 26 January 2026Part-GrantedDepartment of Climate, Energy and the Environment
Scope of Records dated from January 1, 2022, to May 1st 2025: All correspondence, minutes of meetings, briefing notes, internal memoranda, and communication records (including emails, WhatsApp messages, and text messages) exchanged between the Department (including the Minister, the Minister of State with responsibility for planning, Dept, special advisers, and officials at Principal Officer grade or above) and the following external entities: • Bord na Móna (including Bord na Móna Powergen Ltd) • Wind Energy Ireland (WEI) This request is specifically limited to records relating to: • The drafting, amendment, or discussion of the Planning and Development Bill 2023/2024. • Proposals regarding Judicial Review procedures, specifically: o Restrictions on "Locus Standi" or standing for Residents' Associations. o Requirements for unincorporated bodies (Section 286 of the Act). o Timelines for seeking leave for Judicial Review. o Legal costs protections or the Aarhus Convention. • Strategic Infrastructure Development (SID) designation criteria.
- Received 22 December 2025Decided 22 January 2026Part-GrantedDepartment of Climate, Energy and the Environment
Copies of any anonymous letters received concerning the conduct of any workers/employees of Inland Fisheries Ireland sent to departmental officials and/or to Denis Maher and/or Philip Nugent. Time period: 1 January 2022-30 June 2022; Any correspondence [including attachments] between departmental officials [including but not limited to Denis Maher or Philip Nugent] and IFI senior management or IFI board members concerning the anonymous letters and/or any [proposed] follow-up action concerning the details in the letters. Time period: 1 January 2022-30 July 2022; Any briefings or correspondence [including attachments] between departmental officials [including but not limited to Denis Maher or Philip Nugent] and either the Secretary General or Minister of State or Minister concerning the anonymous letters and/or any [proposed] follow- up action concerning the details in the letters. Time period: 1 January 2022-30 July 2022; A copy of any correspondence between IFI senior officials or the IFI board and departmental officials concerning the findings of the ACRUX report ………………….. Time period: 1 May 2022-31 December 2022;
- Received 5 January 2026Decided 20 January 2026WithdrawnDepartment of Climate, Energy and the Environment
Under the Access to Information on the Environmental Regulations, I wish to ask for the following records to be released in full: Minutes of meetings of the Unauthorised Peat Enforcement Working Group / Peat Enforcement Working Group; presentations, briefings, and reports prepared for or received from the Unauthorised Peat Enforcement Working Group / Peat Enforcement Working Group;
- Received 15 December 2025Decided 20 January 2026Part-GrantedDepartment of Climate, Energy and the Environment
I request the following records from the period 1 Sept 2025-present concerning the following lobbying returns: https://www.lobbying.ie/return/132399/south-dublin-routing-4-no-2-limited
- Received 19 December 2025Decided 13 January 2026Part-GrantedDepartment of Climate, Energy and the Environment
1. Copy of correspondence between the Minister for the Environment and the chairman of Inland Fisheries Ireland since 01 June 2025 in relation to governance issues at the agency, protected disclosures and the proposal for an external review of the organisation as set out in the Programme for Government
- Received 15 December 2025Decided 8 January 2026Part-GrantedDepartment of Climate, Energy and the Environment
With regard to the Renewable Electricity Support Scheme RESS 1: 2020 and the associated Terms and Conditions Appendix 2 Milestones (attached for your reference) Can you please provide an update on the status of each milestone for each successful applicant.
- Received 5 January 2026Decided 6 January 2026TransferredDepartment of Climate, Energy and the Environment
All records, briefing notes, and correspondence regarding the drone incident at Porterstown in October 2025. I specifically note that a previous FOI request (TRA-FOI-2025-0325) returned 'no records'. I am now seeking any records that may fall under the broader definition of 'Environmental Information' under Article 3(1), which may have been excluded from the standard FOI search.
- Received 1 December 2025Decided 28 December 2025GrantedDepartment of Climate, Energy and the Environment
I am seeking a list of esubmissions submitted to the Minister for Environment, Climate and Communications through the e-submissions channel. I wish for my request to cover the period from 01-11-2025 - 30-11-2025.
- Received 25 November 2025Decided 24 December 2025Part-GrantedDepartment of Climate, Energy and the Environment
I am seeking the release of records relating to the Landfill Remediation Joint Steering Group from 2023 to date. Please provide quarterly agendas, minutes and copies of any reports mentioned in such meetings or presented at the meetings.
- Received 15 December 2025Decided 23 December 2025TransferredDepartment of Climate, Energy and the Environment
A copy of any records held referring or relating to the lobbying activity described in the following entry on the Lobbying Register: https://www.lobbying.ie/return/125324/sslf- progress-ireland
- Received 3 December 2025Decided 23 December 2025GrantedDepartment of Climate, Energy and the Environment
1. Any correspondence since January 1st 2025 between the Minister or Department of Climate, Energy and the Environment (at PO level or above) and the Taoiseach or his Department (at PO level or above) on proposals to curtail Judicial Review actions against housing and infrastructure projects and proposals to cap High Court legal fees in Aarhus Convention cases; and any associated reports. 2. Any correspondence since January 1st 2025 between the Minister or Department of Climate, Energy and the Environment (at PO level or above) and the Minister or Department of Public Expenditure (at PO level or above) on proposals to curtail Judicial Review actions against housing and infrastructure projects and proposals to cap High Court legal fees in Aarhus Convention cases; and any associated reports.
- Received 24 November 2025Decided 22 December 2025Part-GrantedDepartment of Climate, Energy and the Environment
1. Any reports or notes to the Minister from the Department (at PO level or above) on electricity security of supply issues and any associated risks to the completion or housing, foreign direct investment or data-centre projects. 2. Any correspondence since January 1st, 2025, between the Minister or his Department (at PO level or above) and the chairman, board or chief executive of ESB on: electricity security of supply issues; electricity connections for new housing, foreign direct investment or data-centre projects; and the provision of Government funding for investment in ESB Networks infrastructure. Minutes of any meetings between them on the same topics, and any associated reports or notes. 3. Any correspondence since January 1st, 2025, between the Minister or his Department (at PO level or above) and the chairman, board or chief executive of EirGrid on: electricity security of supply issues; electricity connections for new housing, foreign direct investment or data-centre projects; and the provision of Government funding for investment in EirGrid or ESB Networks infrastructure. Minutes of any meetings between them on the same topics, and any associated reports or notes. 4. Any correspondence since January 1st, 2025, between the Minister or his Department (at PO level or above) and the chairman, board or chief executive of IDA Ireland on: electricity security of supply issues; electricity connections for new housing, foreign direct investment or data-centre projects; and the provision of Government funding for investment in EirGrid or ESB Networks infrastructure. Minutes of any meetings between them on the same topics, and any associated reports or notes. This request excludes correspondence to arrange the timing, date and location of any meetings.
- Received 21 November 2025Decided 18 December 2025RefusedDepartment of Climate, Energy and the Environment
Will the department release to me the completed report of Phase 2 of the Land Use Review.
- Received 20 November 2025Decided 18 December 2025Part-GrantedDepartment of Climate, Energy and the Environment
Minutes of meetings of the management board of the Department, during 2025, to date
- Received 20 November 2025Decided 16 December 2025Part-GrantedDepartment of Climate, Energy and the Environment
Any briefing notes or reports concerning energy/electricity/utility costs received by minister Darragh O’Brien from 01/05/2025 to date.
- Received 7 November 2025Decided 16 December 2025Part-GrantedDepartment of Climate, Energy and the Environment
1. any documentation regarding the disposal of material to the Murphy’s Rock site including the source, potential materials, toxins and volume dumped 2. any documentation concerning the treatment of this material during removal and disposal, for example grinding or sorting but not limited to this 3. Any documentation concerning testing or inspections carried out on this dump site - including bore testing, water table testing, river water testing, ecological testing but not limited to this Include ANY testing before dumping, after reporting and after mitigation steps 4. Any documentation concerning mitigation activities carried out 5. Any documentation concerning risk assessments carried out 5. Any documentation with the responsible parties concerning this dumping and subsequent corrective actions 6. Any documentation/ communication with government departments or EU concerning this illegal dumping and dump site 7. Any documentation regarding clean-up activities and decisions on same 8. Any documentation concerning monitoring of the illegal dumping site 9. On Wednesday 17th Dec 2025 Ken O'Flynn TD raised a question (158-160) asking the Minister for Climate Energy and the Environment for further information regarding dumping on this site. Please provide documentation on the following: What steps were taken to rectify the identified issues to the satisfaction of the EU Documentation concerning steps to ensure required site remediation, risk assessment, enforcement and regularisation actions Waste facility Permit issued on this site
- Received 26 November 2025Decided 12 December 2025Part-GrantedDepartment of Climate, Energy and the Environment
All information and correspondence relating to the November 2023 request to increase EirGrid defined Benefit Pensions. I request all internal correspondence and also all external correspondence with any other body or organisation e.g.EirGrid, NewERA, Department of Finance.
- Received 11 November 2025Decided 9 December 2025RefusedDepartment of Climate, Energy and the Environment
All records held by the Department relating to gifts, hospitality, travel expenses, subsidised events, or externally-funded trips received by: -Ministers and Ministers of State assigned to this Department, -Members of the Minister’s private office, and -Senior civil servants (Principal Officer level and above), for the period from 1 January 2024 to Date. This request should include, but not be limited to: -Records or registers of gifts or hospitality offered or received, including invitations to events, receptions, entertainment, or meals; -Records relating to travel or trips (domestic or international) where costs were paid in full or in part by external organisations, including semi-state bodies, lobby groups, private sector entities, or foreign governments; -Details of payment or reimbursement, including who paid, the purpose of the event/travel, total cost, and whether departmental approval was granted; -Any conflict-of-interest declarations or assessments made in connection with such gifts, trips, or events; -Any correspondence or memos between the Department and the Standards in Public Office Commission (SIPO) regarding such matters; and -Any records indicating whether the above gifts, hospitality, or trips were formally declared to the Department, SIPO, or any other relevant oversight body.
- Received 30 October 2025Decided 5 December 2025RefusedDepartment of Climate, Energy and the Environment
- copies of DCEE’s internal adaptation plans or any working-documents that deal with or document challenges arising from climate change for coastal zones, flood risk areas, and heat stress or drought for the next ten years. Clarification received 05/11/2025 I'm only seeking such records where they were prepared by DCEE and are not already in the public domain. If that is plans for the department itself, sectoral adaptation plans or other working documents, I am only seeking those which are held by DCEE and are unpublished. You do not need to worry about what records other departments may hold.
- Received 10 November 2025Decided 3 December 2025Part-GrantedDepartment of Climate, Energy and the Environment
1) Copies of minutes from Minister Darragh O'Brien's meeting with Re-turn CEO Ciaran Foley on May 23, 2025, as well as copies of briefing notes and memos provided to the minister in advance of the meeting 2) Copies of minutes from the meeting between Minister of State Alan Dillon and Re-turn executives in March 2025 3) Copies of complaints from the public received in relation to the Re-turn scheme between May 30, 3025 and the present date 4) Copies of briefing notes, memos, and other records for ministers in the department regarding the deposit return/Re-turn scheme, including all correspondence received from Re- Turn CEO Ciaran Foley
- Received 31 October 2025Decided 1 December 2025Part-GrantedDepartment of Climate, Energy and the Environment
I am seeking the release of records relating to meetings between Liquid Gas Ireland and officials at the Department of Climate, Energy and the Environment from May 1st to date. This should include, but is not limited to, records of any meeting minutes, meeting notes, a list of attendees, briefing material, associated reports, presentations and correspondence shared and/or referenced at the meetings. Please also provide any correspondence (emails, letters, text messages etc) between Liquid Gas Ireland representatives and officials at the Department during the same period.
- Received 19 November 2025Decided 28 November 2025WithdrawnDepartment of Climate, Energy and the Environment
Copy of all ( ARCs ) Granted by the Minister or by his Department or any other relevant authority that can do so with the Minister's approval relating to the SPA 004087 on Lough Foyle since it was first Designated in 2011 to the present date . Also Copy of all Derogation Licences under the European Communities (Birds and Natural Habitats) Regulations granted by The Minister or his Department or any other relevant authority that can do so under the Minister approval from its first Designation till the present date.
- Received 3 November 2025Decided 28 November 2025GrantedDepartment of Climate, Energy and the Environment
I am seeking a list of esubmissions submitted to the Minister for Environment, Climate and Communications through the e-submissions channel. I wish for my request to cover the period from 01-10-2025 - 31-10-2025.
- Received 13 November 2025Decided 27 November 2025TransferredDepartment of Climate, Energy and the Environment
Can you supply information on the Monitoring Reports, provided to the Minister under the above Lease. Section 15.1 (1) Seabed Foundation Level. Initial 6 monthly reports for first two years and annual reports thereafter, as required by the lease. (2) Scour Reports for the foundations of each turbine – 6 monthly for the first two years and annually thereafter. (3) Information on the bird life monitoring on a quarterly basis since inception of the lease. (6) Monitoring of BENTHIC Communities on or adjacent to the turbine foundations, what reports are available for first five years of operation? Section 15.2 Has the monitoring referred to in Clause 15.1 caused any concern to the Minister and has the Minister required any additional monitoring? Section 15.3 (2) Has the Lessee complied with the requirement to furnish annual audited accounts?
- Received 24 November 2025Decided 25 November 2025TransferredDepartment of Climate, Energy and the Environment
Regarding all types of Social Housing rents uncollected by all Local Authorities for years 2022, 2023 and 2024, Supply total amounts per each Local Authority.
- Received 24 October 2025Decided 24 November 2025RefusedDepartment of Climate, Energy and the Environment
I would like to request all documents and letters exchanged between the Department of Climate, Energy and Environment and the European Commission regarding the EU Emissions Trading System, where the Department have put forward their position regarding the cost of compliance. I would like this request to cover the period from June 30, 2024 to the present day. I would like the request to cover all the communication from the Department to the Commission and the from the Commission to the Department. I would like to ensure all letters to and from Minister Darragh O'Brien and the EU Commission regarding the EU Emissions Trading System and the cost of compliance are included in this request.
- Received 4 November 2025Decided 21 November 2025WithdrawnDepartment of Climate, Energy and the Environment
Details of all spending on external press and communications companies in each of the last five years by company and including the specific purpose/recipient of any training provided in tabular form or in such format as they exist.