National Transport Authority (NTA)
FOI Requests — 959 records (page 3 of 20)
- Received 19 August 2025Decided 15 September 2025GrantedNational Transport Authority (NTA)
All records created (or dated) between 1 July 2025 and 15 August 2025, in relation to the changes envisaged to the railway bridge located on the R132 on the Dublin Road in Drogheda, associated with the Active Travel Plan for the R132 route from the entrance to Drogheda Railway Station to Southgate Shopping Centre.
- Received 8 September 2025Decided 12 September 2025Handled outside of FOINational Transport Authority (NTA)
[1.] Details on how the NTA have run their latest WAV Grant applications for taxis, applications for grants were applied for in July on the NTA website and applicants were notified in August if they were successful or not. [2.] The breakdown as to how the grants were awarded, areas grants were awarded, numbers of grants applied for and number of applicants granted or refused.
- Received 14 August 2025Decided 11 September 2025Part-GrantedNational Transport Authority (NTA)
Relating to the 410, 411, and 412 services operated by CityDirect in Galway: 1. On-time performance records for each service instance, from the start of the earliest available CityDirect contract with the NTA to the present date, including scheduled vs. actual departure times, and noting whether the service was late, early, missed, or diverted. 2. Monthly or quarterly performance summary reports produced internally or externally for these routes. 3. Records of penalties, deductions, or enforcement actions applied to CityDirect for breaches of contract over the same period. 4. Current contract amendments or renewals between the NTA and CityDirect for these services. 5. Previous contracts for these services prior to October 2024, including all amendments. 6. Passenger complaints received by the NTA about these services, broken down by category (e.g., late, early, no-show, driver conduct) and month. 7. Monitoring reports (e.g., mystery shopper, GPS compliance checks) carried out for these services.
- Received 19 August 2025Decided 11 September 2025GrantedNational Transport Authority (NTA)
[1.] A copy of all complaints made to the NTA between 1 January 2025 and 30 June 2025, relating to taxi drivers and taxi journeys [2.] A breakdown of the number of complaints, which county each issue took place in, and what action, if any, the NTA took (including the € amounts of fines)
- Received 13 August 2025Decided 10 September 2025RefusedNational Transport Authority (NTA)
The registered owner of a specified taxi roof sign number on the 9th April 2023.
- Received 4 September 2025Decided 10 September 2025TransferredNational Transport Authority (NTA)
1. A copy of the last page of the original LUAS Operations and Maintenance Contract (Contract No. 32851047, June 2019) between: o An tÚdarás Náisiúnta Iompair – National Transport Authority (NTA), o Transport Infrastructure Ireland, and o Transdev Dublin Light Rail Limited, including all signatures and seals of the contracting parties and authorised persons. 2. Any other pages within this contract that bear the seal of one or more of the contracting parties or signatures of one or more authorised persons. 3. Copies of all schedules (Schedule 1 – Schedule 45) attached to the contract.
- Received 5 September 2025Decided 10 September 2025Handled outside of FOINational Transport Authority (NTA)
1. The number of Tesla Model S vehicles currently licensed as taxis (standard SPSV taxis, not hackneys or limousines) in Ireland, broken down by year of licence issue if available. 2. If possible, the same figures for all SPSV categories (taxi, hackney, limousine), but specifically highlighting the number of Model S vehicles licensed as taxis. 3. The reference date for the count (e.g. as of the most recent quarter or year-end).
- Received 22 August 2025Decided 4 September 2025Handled outside of FOINational Transport Authority (NTA)
All documentation held by the National Transport Authority since 1 January 2010 concerning the implementation of bank card and mobile app payment systems for bus and other public transport modes in Ireland.
- Received 3 September 2025Decided 4 September 2025Handled outside of FOINational Transport Authority (NTA)
A copy of the form used by employees to disclose a disability for the purposes of recording disability numbers under Part 5 of the Disability Act 2005
- Received 15 August 2025Decided 3 September 2025Handled outside of FOINational Transport Authority (NTA)
[1.] Official confirmation of the exact time [requester's] application was recorded by the NTA system; [2.] A complete and itemised breakdown of all applications received, including the exact times each was logged; [3.] A clear indication of which applications were deemed successful; [4.] The exact times at which the successful applications were received by the NTA. [5.] A comprehensive review of the process by which applications were reviewed and selected, including full transparency regarding the lottery process used, if any; [6.] The identity or role (not personal details) of the person(s) who adjudicated the lottery; [7.] A report on how many successful applicants accepted their grant, and, for those who did not accept, what procedures are in place to reallocate grants (including whether there exists a waiting list or 'next in line' list, and, if so, [requester's] current position on that list); [8.] A breakdown of grants awarded, separated into new licence holders and existing licence holders.
- Received 15 August 2025Decided 3 September 2025Handled outside of FOINational Transport Authority (NTA)
Information relating to WAV grant applications including the total number of successful WAV Grant applications received and granted between 10:00am and 10:30am on the day in question and who were long standing taxi drivers and who were new drivers and nationalities as well as information relating to technical issues experienced by the requester.
- Received 5 August 2025Decided 2 September 2025GrantedNational Transport Authority (NTA)
All records, documentation, reports, correspondence, etc relating to feasibility studies, appraisals, assessments, or evaluations undertaken to compare or assess the suitability of Bus Rapid Transit (BRT) and Light Rail Transit (LRT) options for the Cork Metropolitan Area.
- Received 6 August 2025Decided 1 September 2025Part-GrantedNational Transport Authority (NTA)
[1.] A copy of the most up-to-date version of the risk register for the organisation; [2.] A copy of the last three internal audits carried out within the organisation; [3.] A copy of the last three audits of the organisation carried out by external auditors at the request of the organisation, a parent State body or any other arm of the Government or State [excluding Annual Report and Financial Statements]; [4.] A copy of the last three audits carried out by the organisation of any groups or other entities sitting below it, supported by it or funded by it; [5.] A copy of the minutes of the last five audit and risk committee (ARC) meetings
- Received 27 August 2025Decided 28 August 2025Handled outside of FOINational Transport Authority (NTA)
The latest BusConnects Programme Board Monthly Report
- Received 15 August 2025Decided 26 August 2025Handled outside of FOINational Transport Authority (NTA)
The exact number of applicants waiting to sit the SPSV exam
- Received 23 July 2025Decided 25 August 2025WithdrawnNational Transport Authority (NTA)
1. A copy of any internal data protection compliance assessment, data protection review, or internal memorandum (including drafts) relating to the decision to publish personal data online as part of the Blanchardstown to City Centre Core Bus Corridor Scheme Compulsory Purchase Order (CPO); 2. Any correspondence, briefing documents, or legal advice referring to the legal basis for online publication of CPO documentation containing personal names and addresses; 3. Records of any balancing test carried out under Article 21 GDPR following objections received from data subjects; 4. Any documentation setting out technical or organisational safeguards referenced in your response dated 23 July 2025.
- Received 29 July 2025Decided 25 August 2025Part-GrantedNational Transport Authority (NTA)
[1.] A copy of the most recent organisational chart for the National Transport Authority (NTA), showing staff structure, including role titles, grades (where applicable), and reporting relationships [2.] As well as a copy of the most recent org chart outlining the different units/Divisions of the NTA and their roles
- Received 5 August 2025Decided 25 August 2025GrantedNational Transport Authority (NTA)
1. How many members of NTA staff are currently serving at: • EO Higher • HEO Higher • AP Higher • PO Higher
- Received 22 August 2025Decided 25 August 2025TransferredNational Transport Authority (NTA)
Any and all information governing the health and safety assessment criteria which govern the selection of school bus routes in rural areas. While this information request governs a specific route in Co. Laois on the post primary route, I seek any and all information about: [1.] the selection of routes, [2.] the safety assessment of routes, including the specific site(s) safety assessment of the above route), [3.] the assessment of pick up and drop off points (outside homes and at collection points for multiple children) , and [4.] how these Bus Eireann/Contractor route and stop choices interact with the NRA/TII rules on safe stopping, access/egress, sightlines and visibility, and the safeguarding duty towards minors as regards road safety.
- Received 5 August 2025Decided 22 August 2025GrantedNational Transport Authority (NTA)
A copy of the following strategy or any presentation, speaking notes arising from it being brought before the NTA board (March '25): '10. Railway Toilet Strategy Mr Corsi provided an overview of the Railway Toilet Strategy for the Northern Line being developed by the NTA.'
- Received 29 July 2025Decided 19 August 2025Handled outside of FOINational Transport Authority (NTA)
1. A monthly breakdown of scheduled vs. actual services operated on Route 45A (Dún Laoghaire to Kilmacanogue), from January 1, 2024 to the present. 2. Any internal correspondence, reports, or performance reviews referring specifically to Route 45A's service reliability or proposed changes under BusConnects, dated January 1, 2024 to the present.
- Received 15 August 2025Decided 19 August 2025TransferredNational Transport Authority (NTA)
[1.] A copy of the current Bus Éireann schools transport policy, specifically the section which dictates how seats are allocated. [2.] The number of tickets/ seats for a bus serving a specified National School in Co Louth and their break down. Ie, concessionary ticket or entitled to ticket and if they had tickets last year or are new applicants. [3.] How many names are on the wait list for a seat on said bus route and how many of these are new or previous applicants.
- Received 18 July 2025Decided 15 August 2025GrantedNational Transport Authority (NTA)
A list of all SPSV drivers licensed to operate in counties comprising Leinster (including Dublin, Meath, Kildare, Wicklow, etc.), with the details: • Driver's full name • Driver's licence number • Associated licence type (taxi/hackney/limousine) • Licence issue and expiry dates
- Received 25 July 2025Decided 12 August 2025WithdrawnNational Transport Authority (NTA)
All correspondence 1st January 2024 to date (i) between the National Transport Authority and Bus Éireann and, (ii) within the NTA regarding the forthcoming cessation of service on longstanding PSO routes 258 (Rylane - Macroom) & 259 (Renanirree - Kilnamartyra - Macroom) (County Cork) with specific reference to the discontinuation of these longstanding routes.
- Received 30 June 2025Decided 11 August 2025Part-GrantedNational Transport Authority (NTA)
Any records, including complaints from members of the public and incident logs detailing specifics of the incident, showing the number of collisions involving a Dublin bus from 01/01/2023 to date, broken down by year.
- Received 12 June 2025Decided 5 August 2025Part-GrantedNational Transport Authority (NTA)
Records created since 1 Jan 2018 with respect to European Rail Passengers' Rights and Obligations, known also as regulations 2007/1371 and 2021/782, this should include complaints/representations received, reponses and communication with railway undertakings.
- Received 4 July 2025Decided 1 August 2025RefusedNational Transport Authority (NTA)
Copies of all invoices and/or a log of all costs associated with the purchase and installation of a bus shelter on Ballybane Road in Galway City in the years 2024 and 2023
- Received 2 July 2025Decided 30 July 2025Part-GrantedNational Transport Authority (NTA)
1. Correspondence between your chair and the relevant minister in the government department under whose aegis you operate during 2024 and 2025 to date 2. Correspondence between your chief executive and the relevant secretary general in the government department under whose aegis you operate during 2024 and 2025 to date
- Received 25 July 2025Decided 28 July 2025Handled outside of FOINational Transport Authority (NTA)
Any available data on the gender breakdown of licensed SPSV drivers in Ireland, ideally broken down by county, for each year between 2020 and 2025 (or the most recent available).
- Received 27 June 2025Decided 25 July 2025Part-GrantedNational Transport Authority (NTA)
[1.] Líon na dticéad a díoladh i stáisiún bus uilig i Chláir. 2019-2025 (san áireamh) i gClár. [2.] Líon na dticéad a díoladh ar líne don stáisiún and seirbhísí imeachta ó stáisiún bus uilig i Chláir. 2019-2025 (san áireamh) i gClár. [3.] Líon iomlán na ngearán ón bpobal faoi sheirbhísí ar stáisiún & seirbhise bus uilig i Chláir. 2019-2025 (san áireamh) i gClár. [4.] Catagóir iomlán na slándála agus na sábháilteachta gearán ón bpobal faoi sheirbhísí ar stáisiún bus uilig i Chláir. 2019-2025 (san áireamh) i gClár. [5.] Líon iomlán na seirbhísí moillithe ó sheirbhísí ar stáisiún bus uilig i Chláir. 2019-2025 (san áireamh) i gClár. [6.] Na 5 phríomhchataigóir gearán ón bpobal faoi sheirbhísí ar stáisiún bus uilig i Chláir. 2019-2025 (san áireamh) i gClár. [Translation: [1.] The number of tickets sold at all bus stations in Clare. 2019-2025 (inclusive) in Clare. [2.] The number of tickets sold online for the stations and departure services from all bus stations in Clare. 2019-2025 (inclusive) in Clare. [3.] The total number of complaints from the public about services at all stations and on all bus services in Clare. 2019-2025 (inclusive) in Clare. [4.] All categories of security and safety complaints from the public about services at all bus stations in Clare. 2019-2025 (inclusive) in Clare. [5.] The total number of delayed services from services at all bus stations in Clare. 2019-2025 (inclusive) in Clare. [6.] The 5 main categories of complaints from the public about services at all bus stations in Clare. 2019-2025 (inclusive) in Clare. ]
- Received 30 June 2025Decided 25 July 2025Handled outside of FOINational Transport Authority (NTA)
Any reviews, reports, or briefing materials produced from 01/01/2020 to date concerning USB charging ports on Dublin buses.
- Received 7 July 2025Decided 24 July 2025GrantedNational Transport Authority (NTA)
All records created (or dated) between 17 May 2025 and 30 June 2025, in relation to the changes envisaged to the railway bridge located on the R132 on the Dublin Road in Drogheda, associated with the Active Travel Plan for the R132 route from the entrance to Drogheda Railway Station to Southgate Shopping Centre.
- Received 27 June 2025Decided 22 July 2025Handled outside of FOINational Transport Authority (NTA)
Item 10 from the March NTA board meeting: Railway Toilet Strategy
- Received 27 May 2025Decided 16 July 2025Part-GrantedNational Transport Authority (NTA)
All records relating to the application or amendment application by ComfortDelGro Irish Citylink Limited t/a Citylink for a licence to service Ennis, Limerick & Dublin Airport, and all records, information, documentation and communications relating to the decision taken by the NTA to grant a licence to ComfortDelGro Irish Citylink Limited (as set out in the licence from the NTA to ComfortDelGro Irish Citylink Limited dated 29 April 2025). Any information and communications relating to the departure times and stopping places offered to ComfortDelGro Irish Citylink Limited should be included.
- Received 27 June 2025Decided 16 July 2025Handled outside of FOINational Transport Authority (NTA)
Item 8 from the April NTA board meeting: Cork Fares Policy
- Received 2 July 2025Decided 16 July 2025RefusedNational Transport Authority (NTA)
A copy of any research, submissions, memos or other such overview/discussion documents prepared by NTA with regard to fare 'dodging' on transport services in Ireland.
- Received 17 June 2025Decided 15 July 2025GrantedNational Transport Authority (NTA)
[1.] Service level agreement or any agreement in place between NTA and County Councils for the delivery of Active travel scheme and safe routes to school scheme [2.] The national average delivery time of all Active travel schemes and safe routes to school schemes from Ministerial Announcements of projects to full completion. [3.] The national average, excluding county Dublin projects delivery time of all Active travel schemes and safe routes to school schemes from Ministerial Announcements of projects to full completion. [4.] The delivery time of all Active travel schemes and safe routes to school schemes from Ministerial Announcements of projects to full completion for County Offaly.
- Received 10 July 2025Decided 14 July 2025RefusedNational Transport Authority (NTA)
Records relating to a Road Haulage Operator Licence formerly held by or associated with a specified individual
- Received 11 June 2025Decided 9 July 2025Part-GrantedNational Transport Authority (NTA)
All complaints related to Cork bus routes 201, 202, 203, 205, 206, 207, 208, 209, 213, 214, 215, 220 and 225 bus routes from the period 1st May 2024 to 1st June 2025, or the latest data available.
- Received 12 June 2025Decided 2 July 2025Handled outside of FOINational Transport Authority (NTA)
[1.] Data held by the NTA regarding E1 journey times from Bray to Loughlinstown hospital at peak times between 7am and 9am and between 4pm and 7pm Monday to Friday. [2.] The analysis of journey times through Shankill village which was used to justify the Bus Connects proposals on the now defunct routes
- Received 27 June 2025Decided 2 July 2025TransferredNational Transport Authority (NTA)
[1.] Líon na dticéad a díoladh i stáisiún traenach Inis agus stáisiún traenach Sixemilebridge. 2019-2025 (san áireamh) i gClár. [2.] Líon na dticéad a díoladh ar líne don stáisiún imeachta ó stáisiún traenach Inis/stáisiún traenach Sixemilebridge. 2019-2025 (san áireamh) i gClár. [3.] Líon iomlán na ngearán ón bpobal faoi sheirbhísí ar stáisiún traenach Inis agus stáisiún traenach Sixemilebridge. 2019-2025 (san áireamh) i gClár. [4.] Catagóir iomlán na slándála agus na sábháilteachta gearán ón bpobal faoi sheirbhísí ar stáisiún traenach Inis agus stáisiún traenach Sixemilebridge. 2019-2025 (san áireamh) i gClár. [5.] Líon iomlán na seirbhísí moillithe ó sheirbhísí ar stáisiún traenach Inis agus traenacha Sixemilebridge 2019-2025 (san áireamh) i gClár. [6.] Na 5 phríomhchataigóir gearán ón bpobal faoi sheirbhísí ar stáisiún traenach Inis agus stáisiún traenach Sixemilebridge. 2019-2025 (san áireamh) i gClár. [Translation: [1.] The number of tickets sold at Ennis train station and Sixmilebridge train station. 2019-2025 (inclusive) in Clare. [2.] The number of tickets sold online for departures from Ennis train station / Sixmilebridge train station. 2019-2025 (inclusive) in Clare. [3.] The total number of complaints from the public about services at Ennis train station and Sixmilebridge train station. 2019-2025 (inclusive) in Clare. [4.] All categories of security and safety complaints from the public about services at Ennis train station and Sixmilebridge train station. 2019-2025 (inclusive) in Clare. [5.] The total number of delayed services from services at Ennis train station and on Sixmilebridge trains 2019-2025 (inclusive) in Clare. [6.] The 5 main categories of complaints from the public about services at Ennis train station and Sixmilebridge train station. 2019-2025 (inclusive) in Clare. ]
- Received 3 June 2025Decided 1 July 2025GrantedNational Transport Authority (NTA)
1. A copy of the TFI Locallink Driver Induction Booklet 2. A copy of a standard Locallink Contract for Bus Services
- Received 28 May 2025Decided 26 June 2025RefusedNational Transport Authority (NTA)
1. Any correspondence or other communication between (a) Mr Hugh Creegan and (b) Mr Fred Barry of the National Transport Authority and any person, office or department in Transport Infrastructure Ireland (the National Roads Authority) on the following two subjects: • N6 Galway City Ring Road • Galway Transport Strategy 2. Any internal (intra-NTA) correspondence or other communication between Mr Creegan and Mr Barry on the following two subjects: • N6 Galway City Ring Road • Galway Transport Strategy With regard to Mr Creegan, the relevant time period is 1st January 2014 to 31st December 2019. With regard to Mr Barry the relevant period is from the date of his appointment in 2017 to 31st December 2019.
- Received 26 May 2025Decided 24 June 2025GrantedNational Transport Authority (NTA)
1. Details of the ICT budget and planned ICT projects or initiatives for the current financial year (2025/26). 2. Documentation outlining planned ICT procurements for FY 2025/26, including (but not limited to) hardware, software, ICT maintenance agreements, and related services.
- Received 21 May 2025Decided 19 June 2025RefusedNational Transport Authority (NTA)
Information regarding complaints about Public Transport in County Meath for 2024 and so far in 2025.
- Received 23 May 2025Decided 19 June 2025GrantedNational Transport Authority (NTA)
All records created (or dated) between 1 April 2025 and 16 May 2025, in relation to the changes envisaged to the railway bridge located on the R132 on the Dublin Road in Drogheda, associated with the Active Travel Plan for the R132 route from the entrance to Drogheda Railway Station to Southgate Shopping Centre.
- Received 21 May 2025Decided 17 June 2025Part-GrantedNational Transport Authority (NTA)
A copy, preferably in WAV or MP3 filetypes of the special announcements used on-board Bus Éireann (e.g 'There will be a short delay to get the bus back on time' or 'Please do not distract the driver while the bus is in motion, stay behind the white line)
- Received 21 May 2025Decided 17 June 2025GrantedNational Transport Authority (NTA)
The current Dublin Bus fleet lists. If available, I would appreciate receiving details including fleet numbers, vehicle types, registration plates, and any relevant allocation or depot information.
- Received 6 June 2025Decided 17 June 2025GrantedNational Transport Authority (NTA)
Request for Tenders for Provision and Delivery of Branded Uniforms: https://ted.europa.eu/en/notice/-/detail/363615-2025 The details we require are: [1.] Could you please provide a copy of the service/product specification given to all bidders for when this contract was last advertised? [2.] Suppliers who applied for inclusion on each framework/contract and were successful & not successful at the PQQ & ITT stages [3.] Start date & duration of framework/contract? [4.] What is the contractual performance KPI's for this contract? [5.] Actual spend on this contract/framework (and any sub lots), from the start of the contract to the current date [6.] Is there an extension clause in the framework(s)/contract(s) and, if so, the duration of the extension? [7.] Has a decision been made yet on whether the framework(s)/contract(s) are being either extended or renewed? [8.] Who is the senior officer (outside of procurement) responsible for this contract? [9.] Please provide the evaluation criteria and associated weightings used to assess bids at each stage [10.] If multiple suppliers are on the framework, please provide a breakdown of spend by supplier. [11.] What formal review processes are in place for contract performance and how frequently are these conducted?
- Received 19 May 2025Decided 16 June 2025RefusedNational Transport Authority (NTA)
The underlying statistics supporting the decision to ban escooters from public transport in Ireland due to alleged spontaneous combustion of the batteries. The statistics should show how frequently the alleged spontaneous combustion of escooter batteries occured on public transport, specifically in Ireland, to prompt such a ban.