Commission for Regulation of Utilities (CRU)
FOI Requests — 328 records (page 7 of 7)
Download
- Received 12 August 2026Decided —OngoingCommission for Regulation of Utilities (CRU)
or otherwise expected to connect to the electricity system. 3. Records showing the total existing electricity demand attributable to data centres and the additional electricity demand represented by proposed, pending, approved or contracted data-centre developments. 4. CRU projections for electricity consumption by data centres for each year from 2026 to 2035, including the projected percentage of total national electricity demand attributable to data centres. 5. Records showing the number of additional data centres, or additional data-centre electricity connections, assumed within the CRU's electricity-demand projections to 2030 and 2035. 6. Records concerning the amount of additional electricity-system capacity considered available for new data-centre development, including any geographical limitations or constraints. 7. Records showing the geographical distribution of anticipated future data-centre demand, including projected demand within the Greater Dublin Area and outside the Greater Dublin Area. 8. Reports, briefing notes, assessments or modelling concerning the impact of existing and proposed data centres on: security of electricity supply; electricity prices or costs to consumers; transmission and distribution infrastructure requirements; renewable electricity requirements; national carbon budgets or emissions targets; generation and electricity storage requirements; and required investment in the electricity grid. 9. Records showing the amount of new electricity generation and/or storage capacity expected to be required to support anticipated data-centre growth.
- Received 12 January 2018Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Request information on an incident in relation to gas safety
- Received 9 August 2023Decided —WithdrawnCommission for Regulation of Utilities (CRU)
windfarm in Meelick Co. Clare. Please advise in the first instance if any such communication is necessary, and in the second instance if any has taken place, in any format i.e. virtual or actual meetings, emails, and phone conversations. If there has been communication in any format, may I have copies of same (in electronic form) as soon as possible please.
- Received 19 June 2020Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting a copy of the newspaper notice posted in the Irish examiner newspaper, referenced in a proposed decision letter of 19 June 2020, and which was provided to CRU by Energia.
- Received 8 July 2021Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Request copies of all the documents listed in Eirgrid's TSO Certification Document List document
- Received 12 August 2026Decided —OngoingCommission for Regulation of Utilities (CRU)
10. Records concerning the CRU's assessment of whether there should be a national or regional limit, target or ceiling on the number, capacity or electricity demand of data centres in Ireland. 11. Records concerning the development of a State-led approach to data-centre spatial planning, development targets and plan-led infrastructure development, including correspondence or engagement with Government Departments, EirGrid, ESB Networks or other State bodies on this matter. 12. Records showing whether the CRU has assessed the infrastructure or electricity-system implications of data- centre developments which have received or are seeking planning permission but which do not yet have a contracted electricity connection. I am primarily seeking aggregate statistical, policy and infrastructure-planning information and do not require commercially confidential information relating to individual data- centre operators.
- Received 11 December 2023Decided —TransferredCommission for Regulation of Utilities (CRU)
Requesting: 1) information on how much electricity was generated at the Carrigadrohid Dam, near Macroom, Co. Cork, last year. 2) information on how many days the dam was in use and operational in 2022.
- Received 12 January 2018Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting the following information: 1)Has the CRU or any electrical company preformed tests of any kind on the smart meters to be installed under the National smart meter roll out plan? 2)If there has been where can I access the information on these tests and any results and the type of tests? 3)Are these new meters mandatory? 4)In your statement about the roll-out of these new meters it was said that these meters will lead to savings for customers. How was this asserted? Was there a test done and if so where are these results to be viewed?
- Received 27 January 2023Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting any emails, notes, memos, briefings and/or records in relation to a meeting held between Bord Gais Energy, Karen Trent and Jim Gannon on September 5, 2022
- Received 25 February 2025Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting the following records: 1) A register of all vacant properties owned by your organisation. Including detail on the physical condition of each property, how long each property has been vacant, the reasoning for why each property is vacant, and the monetary value of each property. 2) A register of all undeveloped land owned by your organisation. Including detail on the physical condition of each plot of land, how long each plot has been vacant, the reasoning for why each plot is vacant, and the monetary value of each plot.
- Received 5 May 2021Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting records relating to complaints to the CRU from Irish Water customers.
- Received 4 February 2026Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Can you please provide a copy of any statement of assurance which would be signed by employees at assistant principal level which relates to risk management, and or risk registers and or management of budget expenditure.
- Received 5 May 2022Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting information relating to large energy users including data centres seeking a derogation from the duel fuel obligation for supply of energy.
- Received 24 August 2026Decided —OngoingCommission for Regulation of Utilities (CRU)
2) Terms of reference, reports, or any other documentation produced by Mason, Hayes and Curran on behalf of the CRU. I am interested in the period between January 1, 2025 to the present day.
- Received 3 November 2025Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting: a copy of any admin or summary docs on contingency planning for: long blackout events, major gas supply cuts, or ESB/Irish Water cyberattacks.
- Received 26 August 2026Decided —OngoingCommission for Regulation of Utilities (CRU)
6) All records concerning regulatory measures, incentives, penalties or other protections available to CRU in relation to cost overruns, delays or contractor performance on the Celtic Interconnector; 7) All records comparing the regulatory treatment or cost-control arrangements applying to the Celtic Interconnector with those applying to Greenlink and MaresConnect.
- Received 26 August 2026Decided —OngoingCommission for Regulation of Utilities (CRU)
Under the Freedom of Information Act 2014, I am seeking records held by the Commission for Regulation of Utilities relating to the Celtic Interconnector for the period 1 December 2025 to the present date. Please provide: 1) All correspondence between CRU and EirGrid, RTE, Celtic Interconnector DAC/CIDAC, the Department of Climate, Energy and the Environment and the French regulator CRE concerning changes to the expected completion, commissioning or energisation date of the Celtic Interconnector since June 2025; 2) All notifications, correspondence or reports received by CRU concerning the revised programme provided by Nexans in December 2025 and/or January 2026, including any resulting change to the expected completion date.; 3) All records concerning increases in the estimated cost of the Celtic Interconnector, including revised project cost estimates, P70 or P90 estimates, contingency, contractor claims and additional expenditure arising from delay; 4) All internal CRU assessments, briefing notes, meeting records or correspondence concerning whether additional Celtic Interconnector expenditure is eiciently incurred and/or recoverable from Irish electricity customers; 5) All records concerning CRU’s assessment of whether EirGrid complied with the requirement under the Cross-Border Cost Allocation decision to report changes in project costs or timing “without delay”;
- Received 24 August 2026Decided —OngoingCommission for Regulation of Utilities (CRU)
Under the FOI Act 2014, I am requesting access 1) Emails and other communications (eg WhatsApp, physical correspondence) between Commissioners Fergal Mulligan, Jim Gannon and Tanya Harrington and the law firm Mason, Hayes and Curran;
- Received 11 July 2023Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting copies of any records held referring or relating to the undercharging of the technology company Meta by the ESB.
- Received 17 February 2022Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting access to all records, containing the information, which relate to the designation of Mulreavy Wind Farm (GU 401930) as "Outturn Unavailable" for settlement purposes under the Code, from 23:00 on 7 December 2021, and specifically (but not limited to):
- Received —Decided —WithdrawnCommission for Regulation of Utilities (CRU)
- Received 9 August 2023Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting information under FOI about any communication between the CRU and Ballycar Green Energy https://ballycargreenenergy.ie/
- Received 1 September 2023Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting: 1) a representative sample of fifty (suitably anonymised) written or emailed complaints received by the CRU for Quarter 2 of this year about electricity or gas supply; 2) a record of how many complaints were received by CRU in Q2 of this year with a breakdown according to category of complaint (overcharging, getting cut off, customer service etc), and also format of complaint (phone, email, letter etc).
- Received 29 May 2026Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Under the Freedom of Information Act 2014, I request copies of the following records to cover the period 1 July 2025 – present: -A full breakdown of any tax and/or social insurance contribution settlements with Revenue due to misclassified employees following on from the Supreme Court’s decision in the Karshan case; - Any internal assessments, briefing, or reports on past, current or future tax liabilities arising from the Karshan case and/or Revenue guidance following the supreme court case.
- Received —Decided —OngoingCommission for Regulation of Utilities (CRU)
- Received 12 August 2026Decided —OngoingCommission for Regulation of Utilities (CRU)
Under the Freedom of Information Act 2014, I wish to request records held by the CRU concerning the current and future development of data centres in Ireland and their anticipated impact on electricity demand and grid capacity. For the period 1 January 2020 to the date of this request, please provide, where held: 1. Records showing the number of data centres currently operational and connected to the electricity system in Ireland. 2. Records showing the number of additional data centres currently known to the CRU which are: proposed; seeking an electricity connection; approved for connection; contracted but not yet operational;
- Received 15 July 2025Decided —WithdrawnCommission for Regulation of Utilities (CRU)
Requesting access to the following information: 1) Historical electricity unit rates (€/kWh), excluding VAT, for standard residential customers (DG1 & DG2) for all electricity suppliers operating in Ireland in this period. 2) If possible, please provide this information annually for the past seven years (2018- 2025), or the nearest available reporting period. 3) If available, please also include a summary of charges added to DG1 & DG2 bills for this same period, as a result of the following charges: DUoS charges, Imperfections charges, Capacity Charges, Market Operator Charges, Difference payment socialisation, and Residual error volume.
- Received 10 February 2025Decided —WithdrawnCommission for Regulation of Utilities (CRU)
. 2 - OWNERSHIP AND OPERATION OF KEY GENERATION AND STORAGE ASSETS: I am requesting access to CRU’s data on the ownership and operation of key generation and storage assets in the Republic of Ireland. I would specifically like access to data on: a) The name of the operators and owners of key generation and storage assets, including but not limited to those listed on the ENTSO-E transparency platform (see annex 1 for requested units). b) Data on which markets and power exchanges these assets have been registered on to. Where accessible, this should include. c) The type of market (i.e. balancing market, day-ahead, intraday). d) The name of the market operator of the market the asset is registered to (i.e. Nord Pool, SEMOpx, EirGrid). 3 - CRU MARKET INVESTIGATIONS: I am requesting access to data on CRU’s investigations into potential market manipulation, abuse, or collusion in the day-ahead, intraday, or ancillary service energy markets involving trading algorithms. This should include: