- Received 1 May 2026Decided 28 May 2026Part-GrantedCommission for Regulation of Utilities (CRU)
Under the Freedom of Information Act 2014, I am requesting access to all records held by the CRU and Safe Electric (as the Safety Supervisory Body) relating to Weston Mechanical and Electrical Services Limited (Company No: 583381) for the period from 1st January 2025 to 1st May 2026. Specifically, I am seeking: - Copies of all inspection and audit reports completed by Safe Electric inspectors for this contractor. - Records of any non-conformance notices or safety notices issued to the firm. - Details of any formal complaints or disciplinary proceedings recorded by Safe Electric regarding their work. - Copies of any correspondence between the CRU/Safe Electric and Weston Mechanical and Electrical regarding regulatory compliance or safety standards. I would prefer to receive these records in electronic format via email. If any part of this request is refused, please specify which exemption under the Act is being applied and provide details on the appeals process.
- Received 30 March 2026Decided 22 May 2026Part-GrantedCommission for Regulation of Utilities (CRU)
Requesting the following records: 1) Any audits signed off on by the board or audit committee since 1 January 2026-present; 2) A copy of any briefings, investigations, assessments, analysis or reports [excluding audits] requested by or commissioned by the Secretary General / Chief Executive or the Board or Minister(s) which were finalised/completed since 1 February 2026 (and have not been publicly released)
- Received 15 April 2026Decided 14 May 2026Part-GrantedCommission for Regulation of Utilities (CRU)
Requesting the following under the Freedom of Information Act 2014: All expense submissions and copies of receipts for expenses lodged by the chairperson from April 1, 2024, to April 1, 2026.
- Received 13 April 2026Decided 6 May 2026RefusedCommission for Regulation of Utilities (CRU)
Requesting under the FOI Act 2014 for access to records held by the CRU relating to generator connections for biomass and bioenergy projects. I request the following: 1. Any records, reports, or data held by the CRU showing the status of generator connection offers issued to biomass, biogas, anaerobic digestion, or bioenergy projects through the Gate process (Gates 1-3) or subsequent Enduring Connection Policy (ECP) batches, including: Project/generator name; Connection reference; Capacity (MW); Technology type; Processing batch (Gate number or ECP batch); Current status of the connection offer (accepted / expired / surrendered / connected). 2. Any policy papers, decision papers, or internal analysis regarding the treatment of stalled or lapsed biomass/bioenergy generator connection offers, including any consideration of "use it or lose it" provisions as they apply to biomass generators. 3. Any records showing the number and aggregate capacity of biomass/bioenergy connection offers that have expired or been surrendered since 2012.
- Received 24 February 2026Decided 1 April 2026Part-GrantedCommission for Regulation of Utilities (CRU)
Please forward copies of documents submitted for accreditation by Comparison Websites. 1) Bonkers.ie; 2) Switcher.ie; 3) Powertoswitch.ie; 4) Energyswitch.ie. Documents can be redacted if necessary.
- Received 24 February 2026Decided 1 April 2026Part-GrantedCommission for Regulation of Utilities (CRU)
Reason is to look for a template to relate to and understand the business models of these types of services. Additional Q added: Regarding, Bonkers.ie, Switcher.ie etc, Is there any reason relating to CRU accreditation that has stopped them building out a comparison tool using the HDF file? Ie Similar to Kilowatt.ie or Energy Pal? It seems strange that they have not done so and wondering if accreditation with CRU has anything to do with it.
- Received 27 February 2026Decided 26 March 2026Part-GrantedCommission for Regulation of Utilities (CRU)
We are requesting all existing records held by the CRU that relate to energy complaints classified as related to “switching” for the year 2024, as referenced in Section 5.3, Table 3 of the CRU Customer Care Team Annual Report 2024 (page 28). Personal identifiers may be redacted, and I am happy to receive the records in multiple files or in whatever format is most convenient. Specifically, I request: 1) All existing complaints closed in 2024 which were categorised as "Switching (e.g. delays, incorrect switching)" as per Section 5.3, Table 3 of the Customer Care Team Annual Report. Summaries are acceptable if full texts cannot be provided. 2) The outcome of each complaint (e.g., investigated, closed, referred, resolved).
- Received 3 March 2026Decided 25 March 2026GrantedCommission for Regulation of Utilities (CRU)
Under the FOI Act 2014, I am seeking the following: a copy of any correspondence between the CRU and its parent department with regard to the following report: Arrears and NPA Disconnections December 2025 Update.
- Received 3 March 2026Decided 24 March 2026Part-GrantedCommission for Regulation of Utilities (CRU)
Please find below a request under the Freedom of Information Act 2014 for: 1) Correspondence with the Department of Energy regarding the analysis referred to by Deputy Jennifer Whitmore in this PQ: https://www.oireachtas.ie/en/debates/ /question/2026-02-24/169/#pq_169. 2) Correspondence with energy companies or groups acting on their behalf on the same matter. 3) From Feb 01 2025 to date.
- Received 22 January 2026Decided 11 March 2026Part-GrantedCommission for Regulation of Utilities (CRU)
Seeking documents relating to the CRU's Price Review Six public consultation held last year. Please provide the 44 responses that were received to the consultation.
- Received 10 February 2026Decided 10 March 2026Part-GrantedCommission for Regulation of Utilities (CRU)
Requesting: all non-environmental governance and administrative records related held by or for the CRU concerning the identification, screening, assessment, comparison, recommendation, and selection of the SGER terminal site in County Clare/Cahiracon and alternatives elsewhere, including the following categories: 1) Site options universe and screening trail: longlist and shortlist of candidate sites; Inclusion/exclusion decisions for each site and reasons; Records of any “gateway” criteria used to eliminate sites. 2) Methodology and criteria: Terms of reference and methodological documents; Criteria definitions, thresholds, scoring rules, and weighting methodology; Any amendments to criteria/weightings and records explaining why changes were made; Sensitivity analysis and robustness testing. 3) Comparative assessment outputs: Multi-criteria analysis outputs, ranking tables, scoring matrices; Cost-benefit analyses and option appraisal summaries; Working spreadsheets and model files used to derive rankings; Environmental constraints mapping/GIS overlays. 4) Risk and receiving-community assessment at site-comparison stage: Hazard identification and consequence- screening records used in site comparison; Assumptions used for population exposure, land use, vulnerable receptors, emergency response capability, and meteorology; Records addressing residual risk allocation to nearby/receiving communities.
- Received 10 February 2026Decided 10 March 2026Part-GrantedCommission for Regulation of Utilities (CRU)
5) Consultants and external advisers: Procurement records, requests for tender/quotes, award records; Contracts, scopes of work, deliverables, presentations, and author lists; Records identifying who prepared each key assessment and recommendation. 6) Recommendation and approval chain: First record recommending Cahiracon (or any preferred site); All subsequent recommendation records, including revisions; Minutes/notes/decision papers where recommendations were considered, accepted, modified, or escalated; Correspondence with other public bodies relating to preferred-site rationale. 7) Substantiation of public statements: Records evidencing public statements regarding: (a) number of coastal sites considered, (b) criteria used (technical/environmental/financial/planning), (c) use of multi-criteria and/or cost-benefit methods. 8) Records held “for” the authority: Any records held by consultants/contractors on behalf of the Commission for Regulation of Utilities concerning the above. 9) Search details: A note of record systems searched, date ranges, and business units searched. Additional CRU regulatory interface request: Please include all records where SGER site- selection assumptions were considered in regulatory and network planning contexts, including correspondence, submissions, and briefing material exchanged with the Department of Climate, Energy and the Environment and Gas Networks Ireland.
- Received 20 January 2026Decided 23 February 2026RefusedCommission for Regulation of Utilities (CRU)
Táim ag lorg na sonraí síos de réir an tAcht thuas: líon iomlán na ngearán a rinneadh chuig do chomhlacht ó dhaoine a bhí ag rochtain seirbhísí poiblí i gContae an Chláir ó 2023-2025; líon na ngearán a réitíodh i mbliain an ghearáin; líon na ngearán a bhí gan réiteach ag deireadh gach bliana; catagóir ghinearálta an ghearáin; líon na ngearán a rinneadh i nGaeilge nó i mBéarla; líon na ngearán inar fuair an ball den phobal toradh sásúil don tréimhse chéanna.
- Received 19 January 2026Decided 20 February 2026GrantedCommission for Regulation of Utilities (CRU)
Requesting: A copy of any briefings, reports and minutes prepared for any Quarterly Liaison Meetings in 2025 with the department under which this organisation sits.
- Received 9 January 2026Decided 9 February 2026RefusedCommission for Regulation of Utilities (CRU)
Requesting: information held by CRU in connection with any grid connection proposals, applications, technical assessments or system planning engagements relating to the following development: Developer: Shelbourne Solar Limited or EDF Energy or related company; Location: County Wexford (including the townlands of Dunmain, Garryduff, Ballykeerogemore, Ballykeerogebeg, Knockea, Killesk, Dunmain, Whitechurch, Killesk); Proposal: Solar PV generation and Battery Energy Storage System (BESS) together with associated substation and grid connection; Connection level (as publicly referenced): 110kV or 220kV with either via tail feed to the Great Island Power Station or a Loop In – Loop Out substation to either the Great Island to Kellis 220kV line or the Great Island to Lodgewood/Arklow 220kV line running through the proposed development site. For clarity, this request includes the following: Where the Developer is Shelbourne Solar Limited or EDF Energy or related company. For clarity, this request includes the following: Where the Developer is Shelbourne Solar Limited or EDF Energy or related company. The request also includes any communications with any agents of the Developer e.g. planning consultants or engineers; A 110kV or 220kV connection to any electricity infrastructure in the area – this is not to be limited to the final option which has been considered but should include all options which have been assessed even if these have been subsequently dismissed by either the Developer or electricity infrastructure provider;
- Received 9 January 2026Decided 9 February 2026RefusedCommission for Regulation of Utilities (CRU)
Any similar proposal in the proposed location in recent years in southwest Wexford in the townslands referred to above; Any information as outlined below in relation to communication or otherwise with the Developer and CRU or between CRU and Eirgrid or other utility companies in relation to the proposed development. As a concerned local resident and local landowner joining the proposed development, I am seeking access to the above for the following items at a minimum:1) Records confirming whether any application, pre- application notification, system study, meeting, calls or any engagement or correspondence relating to this project was received, initiated, processed or considered by CRU. This may be by the Developer or any other related entity over the past number of years in the proposed location. 2) Dates of receipt, registration, assessment, type of engagement, internal routing and final decision-making in relation to any such engagement. 3) Copies of any versions of: Overall project maps, diagrams, summaries and layouts; substation layout drawings and options considered; cable route corridor maps and options and analysis of routes; route option studies and conclusions (if any) and communication of same; bay availability or capacity options available for any 110kv or 220kV substation or circuits whether this be initial review, assessment, suitability report, studies, reserving or allocation. This should include but not limited to direct connection to Great Island (110kV or 220kV) or connection via Great Island/Kellis line or the connection via Great Island/Lodgewood/Arklow 220kV.
- Received 9 January 2026Decided 9 February 2026RefusedCommission for Regulation of Utilities (CRU)
If other options were considered and were subsequently dismissed, this information should also be provided; voltage selection/options: any documentation prepared whether it be internal communications or detailed reports or correspondence with the Developer or an agent; environmental or financial constraint mapping; analysis of future proofing of the proposed infrastructure for further expansion in particular in light of proposed upgrades to the aforementioned 220kV infrastructure: a) analysis / studies of potential linkages with other planned projects in the wider area, b) Any other technical materials relating to the project that has been received by CRU or provided to the Developer or has been created internally by CRU; Internal procedural checklists, workflow records, logs or standard operating procedures applied to this project; Any registers, databases, indices or tracking systems showing the movement or handling of records relating to the project; Metadata relating to the creation, modification or circulation of records (including document titles, dates, authorship fields and internal reference numbers, where held); Lists of third-party consultations or referrals undertaken by CRU in relation to this project (without seeking personal contact details); High-level system planning or overall network impact summaries insofar as they relate to the existence, feasibility or environmental footprint of the project. CLARIFICATION: A. I am okay with the request being based on the 2 aforementioned companies, Shelbourne Solar Limited and EDF Energy; B. Time Period, apologies for the subjectivity. This should apply from 1.1.2022 to 9.1.2026.
- Received 14 January 2026Decided 29 January 2026RefusedCommission for Regulation of Utilities (CRU)
Request: Tobin Consulting Engineers, are in the process of resubmitting an application to develop Lissinagroagh Wind Farm on behalf of FuturEnergy. The company stated that, following the preliminary design of the Lissinagroagh Wind Farm Project, layout and turbine locations, it is proposed that the project team will commence consultation initially with a list of bodies, in order to allow sufficient time for receipt of meaningful feedback. Commission for Regulation of Utilities is listed as one of these bodies. Under the Freedom of Information Acts, I request: 1) A copy of this request; 2) A copy of the submission the Commission for Regulation of Utilities submitted for inclusion in this Environmental Impact Assessment Report.
- Received 5 December 2025Decided 12 January 2026GrantedCommission for Regulation of Utilities (CRU)
I would like to make a request under the Freedom of Information Act 2014. According to a Parliamentary Question reply, the minister for Climate Energy and the Environment said: "officials from my Department correspond with CRU on an ongoing basis to track developments in retail and wholesale energy markets, including the effect of Government supports on arrears levels, among other indicators. The CRU releases market monitoring data monthly to my Department." I would like to request correspondence between the CRU and the department in relation to the monthly market monitoring data.
- Received 3 December 2025Decided 2 January 2026Part-GrantedCommission for Regulation of Utilities (CRU)
All internal memoranda, risk assessments, model calculations or impact assessments prepared by CRU staff (or commissioned externally) since January 2024 relating to the August 2025 ‘Additional Customer Protection Measures for Household Electricity & Gas Customers 2025/26. I am also requesting worksheets, spreadsheets or summary tables showing projected impacts on arrears levels, disconnections, supplier obligations, and social vulnerability.
- Received 20 November 2025Decided 17 December 2025RefusedCommission for Regulation of Utilities (CRU)
Requesting access to records held by the CRU, including any records obtained from or held on behalf of Safe Electric / RECI, relating to the courses/qualifications and practical experience actually accepted for registration under the Safe Electric scheme. This request is confined to the last five years, i.e. for registrations decided from 20th November 2020 to the date of this request. For the avoidance of doubt, I am not seeking copies of the Safe Electric “Criteria Document” or the “Application for Registration Procedure”, which I understand are already publicly available, except insofar as they may be attached to or embedded within other records falling within the scope below. I am seeking records that reflect what has been accepted in practice for successful applicants.
- Received 17 November 2025Decided 11 December 2025RefusedCommission for Regulation of Utilities (CRU)
Requesting a copy of the CRU Licensing and Levy Management audit (circa Nov 2024)
- Received 3 November 2025Decided 8 December 2025RefusedCommission for Regulation of Utilities (CRU)
Requesting for each full calendar year from 2022 to the most recent year available: The total number of customer complaints about Uisce Éireann escalated to the CRU. Outcomes of those escalations, recorded as: Upheld; Part-upheld; Not upheld; Withdrawn / resolved prior to decision. Any annual summary reports or statistical tables already produced relating to CRU oversight of Uisce Éireann’s complaint-handling performance (for example, annual performance dashboards or KPI summary reports).
- Received 28 October 2025Decided 20 November 2025RefusedCommission for Regulation of Utilities (CRU)
Requesting access to records held by the CRU, including any records obtained from or held on behalf of Safe Electric / RECI, relating to qualifications currently accepted for registration under the Safe Electric scheme. Specifically, I request the following information, for each qualification, course, or award currently accepted by Safe Electric for registration: 1.Current acceptance status – confirmation that the course or qualification is currently recognised for registration purposes. If this is not available please confirm the most recent acceptance date of the course. 2) Practical experience requirements - a) Indicate whether the course itself fully satisfies any practical experience requirements for registration. b) Where additional practical experience beyond the course is required, please provide: i) Description of the experience applicants are expected to have completed. ii) Minimum duration or scope (e.g. months, hours, or number of projects). iii) . Format of evidence requested (e.g. logbook, employer reference, portfolio, or in-course assessment).
- Received 28 October 2025Decided 20 November 2025RefusedCommission for Regulation of Utilities (CRU)
If the course alone is sufficient and no further experience or proof was required please indicate this. 3) Other regulatory or procedural conditions that could affect registration eligibility (e.g. legal, insurance, or internal procedural requirements). 4) Other regulatory or procedural conditions that could affect registration eligibility (e.g. legal, insurance, or internal procedural requirements).
- Received 20 October 2025Decided 13 November 2025Part-GrantedCommission for Regulation of Utilities (CRU)
Requesting: 1) A copy of the most up-to-date tracker for the implementation of recommendations from audits; 2) A list of all audits carried out in the last two years to include the month and year of the audit and the overall assurance rating.
- Received 14 October 2025Decided 11 November 2025RefusedCommission for Regulation of Utilities (CRU)
Requesting a copy of correspondence between the Commission for the Regulation of Utilities and the Minister/Secretary General of the Department of Climate, Energy and the Environment regarding staffing levels and budget allocations since 01 January 2025
- Received 10 October 2025Decided 7 November 2025RefusedCommission for Regulation of Utilities (CRU)
I would like to request records under the freedom of information act. At the JOC, the CRU was asked – "Has the CR U ever done any analysis on the impact of data centre demand on prices": https://www.oireachtas. ie/en/debates/debate /joint_ committee_on_climate_ environment_and_energy/ 2025-09-24/speech/218/. I would like to request any records of research or analysis which explored this topic and records which relate to that topic (e.g. emails, briefing notes, etc.).
- Received 1 September 2025Decided 31 October 2025RefusedCommission for Regulation of Utilities (CRU)
Under the provisions of the FOI Act 2014, I wish to request access to records held by the CRU concerning electricity pricing, tariffs, and network charge arrangements for data centres operating in Ireland. Specifically, I request: 1) Copies of all records relating to the electricity tariffs, network charges, discounts, rebates, or special arrangements provided to data centres from 1 January 2015 to the present. 2) Any agreements, contracts, or correspondence between the CRU and electricity suppliers concerning preferential pricing or reduced network charges for data centres. 3) Internal CRU documentation, briefing papers, or reports relating to the decision to adjust household network charges while proposing reductions for large energy users, including data centres.
- Received 1 September 2025Decided 31 October 2025RefusedCommission for Regulation of Utilities (CRU)
This request includes, but is not limited to: Tariff schedules; Network charge structures; Policy proposals and regulatory submissions; Correspondence (letters, emails, meeting notes) with data centre operators or representative groups.
- Received 1 September 2025Decided 26 September 2025Part-GrantedCommission for Regulation of Utilities (CRU)
I am writing to request access to records held by your organisation under the FOI Act, 2014. In accordance with section 12 of the FOI Act 2014, I wish to request access to the following records/details: 1) Any internal briefings prepared for the department of energy/minister for energy in 2025 on the security of supply programme progress and any challenges it is facing. 2) The most recent list of gas power supply project timelines under the security of supply programme. 3) The most up to date estimated cost and duration of the TEG programme.
- Received 27 August 2025Decided 23 September 2025Part-GrantedCommission for Regulation of Utilities (CRU)
EP UK Investments (EPUKI) is writing to request information under FOI Act 2014 in respect of the Services Agreement referred to in the Information Paper CRU2023124 published on 17 October 2023, titled "Security of Electricity Supply - Retention of Moneypoint Units (MP1, MP2 &MP3).
- Received 27 August 2025Decided 23 September 2025Part-GrantedCommission for Regulation of Utilities (CRU)
This request is made following the CRU's decision dated 26 June 2025 (Ref: FOI 21/25), and the subsequent internal review request submitted on 25 July 2025. EPUKI remains concerned about the lack of transparency surrounding the Services Agreement and its implications for market completion, public expenditure, and regulatory oversight. The information requested: Please provide a copy of the EirGrid memo of 19 December 2022. referenced in Record 5 of the CRU's schedule of records in its decision of 26 June 2025. EPUKI has not been able to locate in the disclosed materials the memo mentioned and notes that Record 5 associates the memo with the exercise of the CRU's direction to EirGrid to enter into the Services Agreement. EPUKI therefore asks that this and any other relevant records to its request be located and assessed for disclosure. EPUKI also asks for any further information from its request of 29 May 2025 that the CRU considers should be provided in better serving the public interest in section 36(3) FOIAM, where section 36(1)(b) has been relied on in the CRU's decision to refuse or partly grant information. EPUKI further requests that the CRU assess whether further information can be granted on the application of section 18 for each record identified. Otherwise, adequate justification should be provided where the application of section 36(1)(b)
- Received 27 August 2025Decided 23 September 2025Part-GrantedCommission for Regulation of Utilities (CRU)
is still considered to result in on further grant or part-grant of information. EPUKI further requests copies of any records held - including documents, meeting minutes, emails and other correspondence that set out or otherwise indicate the reasons that CRU considers a requirement of exceptional circumstance applies in balancing the public interest under section 36(3) in relation to information identified in its request of 29 May 2025. If any part of this request is likely to be refused under FOIA 2014, EPUKI would appreciate release of any records that can be disclosed and for CRU to provide reasons for any redactions or refusals in accordance with Section 13 of FOIA 2014.
- Received 1 September 2025Decided 22 September 2025RefusedCommission for Regulation of Utilities (CRU)
Under FOI Act 2014, I am requesting access to any records held by the CRU relating to the proposed Bellville solar plant and battery energy storage system (BESS), specifically: Any correspondence, emails, or communications with Power Capital Renewable Energy Limited (PCRE) concerning the Bellville solar plant and BESS. Any maps, plans, proposals, or documents submitted by PCRE relating to this project. Any internal CRU notes, memos, or records regarding pre-application discussions or consultations with PCRE. Any other records, documents, or information that CRU may hold relating to this project or PCRE’s engagement with CRU. Please include all relevant records from January 2023 to the present.
- Received 29 July 2025Decided 16 September 2025Part-GrantedCommission for Regulation of Utilities (CRU)
“Further to the background and particulars as outlined above and pursuant to section 12 of the Freedom of Information Act 2014 (as amended) (the “FOI Act”), we request the release of the following records: 1) All documentation submitted by GNI
- Received 29 July 2025Decided 16 September 2025Part-GrantedCommission for Regulation of Utilities (CRU)
(including in response to any interrogatories) or produced internally by the CRU, that mentions Aurora/Aurora Telecom and was considered or used to inform the PC4 consultation (and analysis therein) published on 16 June 2017 (CER/17/127) by the Commission – “CER Consultation Paper October 2017 to September 2022 Distribution Revenues for GNI”. 2) All correspondence between the CRU and GNI/Ervia during the 24 month period 2022-2024 (full calendar years) that covered issues relating to the activities of the Aurora Telecom division within GNI.”
- Received 30 July 2025Decided 12 September 2025RefusedCommission for Regulation of Utilities (CRU)
My request is as follows. 1) What are the principal documents and datasets held by the CRU which either inform or reflect the concern about the potential exercise of market power in the balancing market. 2) Please provide full copies of each of the documents and datasets. 3) Please provide copies of correspondence between the CRU and the UR relating to concerns about the potential exercise of market power in the balancing market that was generated between 01/01/2025 and 03/03/2025.
- Received 3 July 2025Decided 1 September 2025RefusedCommission for Regulation of Utilities (CRU)
Please provide copies of the following information held that were created or received by
- Received —Decided 1 September 2025RefusedCommission for Regulation of Utilities (CRU)
- Received 5 August 2025Decided 1 September 2025RefusedCommission for Regulation of Utilities (CRU)
Requesting a copy of any submissions, memos, briefings, reports, or other such research papers prepared by CRU with regard to the use of private wires by data centres in Ireland. This request to cover the period from 1 Jan 2024 to date.
- Received 19 June 2025Decided 15 July 2025Part-GrantedCommission for Regulation of Utilities (CRU)
I would like records related to the report on energy arrears for march 2025
- Received 16 June 2025Decided 1 July 2025RefusedCommission for Regulation of Utilities (CRU)
I like to access the ''Freedom of Information'' request on Irish Water Limited that you may have. Commission for Regulation of Utilities, CRU, signed off on the Irish Water Limited plan for a Water PipeLine, 110 miles long. From Parteen Weir, Limerick to Peamount in Dublin. The Water Pipe Line would cost 2 Billion Euro +.which CRU said is Value for Money. The WATER when it reaches Dublin and is Pump into the Water Main Pipes in Dublin at LEAST 50% of the WATER will be lost after being Pump 110 miles. Dublin Water Mains are Antiquity, Corroded and LEAKAGE RATE is at 50%. How is this Value for Money ? The 2 Billion Euro + INVESTED IN REPLACING THE WATER MAINS IN THE DUBLIN AREA WOULD SAVE AT LEAST THE SAME AMOUNT OF WATER THAT BE PUMP FROM PARTEEN WEIR. Have CRU read Emma Kennedy ''The Kennedy Analysis'' on the Parteen Weir to Pemount PipeLine.? Her Logic, Reasoning is that the Pipeline is a ''FOLLY''. The Amount of Water Losted every Day could be Saved if the Water Main Pipes in Dublin Were REPLACED. ? And will have to be REPLACED.? Irish Water Predictions are not Correct. Water NOT LOSSED by Replacing the Water Main Pipes would be held in our Reservoirs and Water Treatment Plants. The Water Main Pipes in Dublin have to be REPLACED sooner rather than Later. Capital Investment in the Infrastructure ( Replacing Water Main Pipes) of 2 Billion + would be VALUE for MONEY.
- Received 16 June 2025Decided 1 July 2025RefusedCommission for Regulation of Utilities (CRU)
Not the ''FOLLY'' of the 110 mile Pipeline.? Irish Water Limited for the Dublin Area has to produce 2 DAYS of Clean, Treated Water, for ONE DAY of Treated Domestic Water to reach the TAPS in the Dublin Area. Statement of Fact ? What is the Thinking, Reasoning, Logic of CRU that the Water Pipe Line would be VALUE for Money. Dublin does NOT have a WATER SHORTAGE : Dublin has ECONOMIC WATER SCARCITY. Economic Water Scarcity is when : The Water Infrastructure, Technology Poor Management, Governance is INADEQUATE. In Ireland we have Economic Water Scarcity. High Leakage Rates, Brown Water coming out of Taps, Boiled Water Notices, Water Pressure Reduced, ETC. PHYSICAL WATER SCARCITY:Physical Water Scarcity is when there is not Enough Water in the AREA for the People or the Environment. Ireland has abundance of Rain Water. Do CRU believe that Irish Water Limited gets VALUE for Money when it advertises on TV,Radio, Newspapers and hour long TV Programme ? to tell the Irish People what a great job they (Irish Water Limited) are doing.??? Do the Regulator (CRU) believe that Irish Water Limited Replacing 4.5% of Water Main Pipes in 10 years (2014-2024). Good Management ? Good Governance ? European Water Companies Replace 3% of Water Main Pipes a Year. Would the Regulator, CRU, Priorities Replacing Water Main Pipes over TV, Radio, Newspapers Advertising.??
- Received 16 June 2025Decided 1 July 2025RefusedCommission for Regulation of Utilities (CRU)
Irish Water Limited has Not Trained one Person in Water Treatment Management or Waste Water Management. Irish Water Limited OUTSOURCING all its work to Private Companies since 2014. Outsourcing is Not Value for Money yet CRU write off on Irish Water Limited Accounts as VALUE FOR MONEY ? Has the CRU undertaken a Study of ? A. The Cost and TimeLine of Parteen Weir to Peamount Water Pipeline. The Amount of Water it would Deliver.? B.The Annual Maintenance Cost of the Water Pipeline from Parteen Weir to Peamount Dublin.? C. What Percent amount of Water Pumped from Parteen Weir to Peamount would be Lost in transit.? D. The Cost,Timeline of Replacing the Antiquated Water Main Pipes in Dublin City. E. The Amount of Water it would Deliver (Save) with the Replaced Water Main Pipes ? F. The Cost in Euro, of Treated Water Loss by Leakage in the Republic of Ireland.? Could a copy of this Freedom of Information Letter also be forwarded to the Board of CRU. For the Views, Comments Please.?
- Received 29 May 2025Decided 26 June 2025Part-GrantedCommission for Regulation of Utilities (CRU)
Please provide copies of the following information held that were created or received by CRU between 28 September 2021 and 29 May 2025: 1) A copy of the Services Agreement entered into between EirGrid and ESB on or around 14 August 2023 as referenced in Information Paper CRU2023124. 2) All correspondence, including email and letter exchanges, documents, meeting notes, and internal memos relating to the negotiation, drafting, review and approval of the Services Agreement, between: i) CRU and EirGrid; ii) CRU and ESB; iii) EirGrid and ESB (insofar as held by CRU); and iv) Any of the above-named bodies or Department of the Environment, Climate and Communications, and the European Commission (insofar as held by CRU). 3) Any value-for-money analysis or impact statements in relation to the Services Agreement relating to the impact of running the Moneypoint Units via testing or dispatch on the Capacity Market and the Balancing Market.
- Received 23 May 2025Decided 20 June 2025Part-GrantedCommission for Regulation of Utilities (CRU)
Please provide any records held - including documents, meeting minutes, emails and other correspondence - created or received by CRU between 1 January 2025 and 14 May 2025 in connection with setting the timetable for the T-4 2029/2030 Capacity Auction that is significantly later relative to previous auctions.
- Received 21 May 2025Decided 18 June 2025RefusedCommission for Regulation of Utilities (CRU)
Requesting the following records:1) A copy of the most up- to-date version of the risk register for the organisation; 2) A copy of the last three internal audits initiated within the organisation; 3) A copy of the last three audits carried out at the request of a parent State body or any other arm of the Government or State.
- Received 13 May 2025Decided 10 June 2025GrantedCommission for Regulation of Utilities (CRU)
Requesting 1) Correspondence between your chair and the relevant minister in the government department under whose aegis you operate, 2. Correspondence between your chief executive and the relevant secretary general in the government department under whose aegis you operate, 3. During 2024 and 2025 to date
- Received 22 April 2025Decided 4 June 2025RefusedCommission for Regulation of Utilities (CRU)
Please could you provide me with access to any and all records (to include “written or printed material in any form (including in any electronic device or in machine readable form” etc.) , kept by the CRU, under the Freedom of Information Act, which provide details of the following: 1) The number of Safe Electric Cert 3s which were submitted to Safe Electric for solar installations between 1 November 2024 and 1 April 2025. 3) The number of books of Safe Electric Cert 3s which were sold in 2024.