National Transport Authority (NTA)
FOI Requests — 959 records (page 5 of 20)
- Received 10 February 2025Decided 10 March 2025GrantedNational Transport Authority (NTA)
[1.] All documents from the Public Service Obligation determination which lead to the withdrawal of local link service 1426, these should include but not limited to report conducted and conclusion with valid reason for withdrawal. [2.] Records of the NTA and Local Links protocol for withdrawing a public transport service. [3.] Records of public notice issued notifying passengers of the withdrawal of service 1426 Stranorlar to St Johnston. [4.] Records of Notice to [a specified person] advising of the withdrawal of service 1426
- Received 10 February 2025Decided 10 March 2025Part-GrantedNational Transport Authority (NTA)
[a.] Records from the NTA in relation to their interpretation of EU-UK TCA title ii Transport of passengers by road. [b.] Records from NTA which identify their efforts to prove a definitive answer to authorisation of Multiple Authorisation to a single service under the EU-UK TCA. [c.] Record of all Authorisations (include validity dates) issued since 01/01/2020 by the NTA under the EU-UK TCA title ii Transport of Passengers by Road. [d.] Record of all Authorisation withdrawn under EU-UK TCA title ii Transport of passengers by road.
- Received 7 February 2025Decided 7 March 2025Part-GrantedNational Transport Authority (NTA)
All records created (or dated) between 1 February 2024 and 31 January 2025, in relation to the changes envisaged to the railway bridge located on the R132 on the Dublin Road in Drogheda, associated with the Active Travel Plan in preparation by Louth County Council for the R132 route from the entrance to Drogheda Railway Station to Southgate Shopping Centre. The records to include: (i) All notes made (electronic and handwritten), by officials of the NTA who attended meetings with Louth County Council in relation to plans for the above. (ii) All papers prepared by the NTA or circulated by any party, at meetings with Louth County Council in relation to plans for the above. (iii) All agendas prepared for any of the above meetings. (iv) All correspondence (electronic and handwritten, including SMS and WhatsApp messages) transmitted between NTA officials and Louth County Council or its representatives in relation to the proposals.
- Received 6 January 2025Decided 28 February 2025GrantedNational Transport Authority (NTA)
Records of all complaints in 2024 on the following services: [1.] Bus Route 22 Dublin to Ballina [2.] Bus Route 23 Dublin to Sligo [3.] Bus Route 425 Galway to Longford [4.] Bus Route 469 Sligo to Longford [5.] Bus Route 466 Athlone to Cavan
- Received 30 January 2025Decided 28 February 2025RefusedNational Transport Authority (NTA)
[1.] a copy of records containing any report, briefing paper or analysis on the 2025 budget announcement to extend the Free Travel Pass to companions of anyone over 70 and its impact on PSO revenue [2.] any communications on the issue within the NTA or with external stakeholders
- Received 27 January 2025Decided 25 February 2025GrantedNational Transport Authority (NTA)
1) The percentage of bus journey fares that were paid by cash, journey fares covered by free travel pass issued by Department of Social Protection percentage of journey fares covered by leap card and the percentage of journey fares that were covered by CIE staff travel pass or equivalent for each Dublin Bus route in 2024 in tabular form.
- Received 21 January 2025Decided 19 February 2025GrantedNational Transport Authority (NTA)
The total expenditure (euro) per project code for all projects within 2024 under the Active Travel Investment Grants: Offaly Allocations
- Received 21 January 2025Decided 19 February 2025GrantedNational Transport Authority (NTA)
Copies of all complaints made to NTA or any its agents, including taxi and SPSV operators, that reference 'disabled', 'disability' or 'wheelchair', including decisions/resolutions from 1 January 2023 to 31 December 2024.
- Received 23 January 2025Decided 18 February 2025RefusedNational Transport Authority (NTA)
Records concerning the closing off by Bus Eireann of public access to parking by the public at the Ballina Co Mayo, Bus Eireann Depot
- Received 17 February 2025Decided 17 February 2025Handled outside of FOINational Transport Authority (NTA)
The latest BusConnects Programme Board Monthly Report
- Received 13 December 2024Decided 14 February 2025Part-GrantedNational Transport Authority (NTA)
[1.] Records and information relating to the withdrawal of all job offers at the NTA from 1 January 2023 to 6 December 2024. [2.] Records relating to the decision to create and subsequently withdraw the Senior Data Protection Administrator role and any other records relating to this role from 1 January 2023 to 6 December 2024. [3.] Records relating to any other restructuring exercises within the organisation from 1 January 2023 to 6 December 2024. [4.] A copy of the disability accommodations process referenced in emails by the Diversity and Inclusion Manager at the NTA.
- Received 23 January 2025Decided 14 February 2025RefusedNational Transport Authority (NTA)
The number and type of vehicles operated by the National Transport Authority (including those operated by Bus Éireann), which have recently been decommissioned/replaced or are due to be decommissioned/replaced in the near future.
- Received 16 January 2025Decided 13 February 2025GrantedNational Transport Authority (NTA)
[1.] Information as to why the funding for the Part 8 Ratoath Pedestrian and Cycling Scheme [File number 5139451] was withdrawn [2.] Money spent on planning, design, etc. since the project was announced
- Received 16 January 2025Decided 13 February 2025GrantedNational Transport Authority (NTA)
The number of cancellations, late and early buses from 1st July to the latest available date for all Cork City buses under the PSO by route
- Received 14 January 2025Decided 12 February 2025Part-GrantedNational Transport Authority (NTA)
Records relating to taxi complaint outcomes between 01 January 2013 and 20 November 2024.
- Received 14 January 2025Decided 12 February 2025GrantedNational Transport Authority (NTA)
The models of the double decker buses used on the Templeogue Road and Fortfield Road corridors and the capacity of each bus (e.g. number of seated and standing places) The bus numbers are: 15, 49, 54A, 65, 65B.
- Received 14 January 2025Decided 12 February 2025RefusedNational Transport Authority (NTA)
Q1 - whether any buses on the corridor are unable to take passengers as they are full - in AM peak. Q2 - the average load factor per bus when it reaches the Templeogue / Fortfield Road area in peak - citybound direction in AM. Or if this exact data is not available, the most suitable available data ref this question. Q3 - please confirm if AM peak buses are unable to take passengers on board in Terenure / Rathgar / Kimmage areas in AM peak as they are full. Or if this exact data is not available, the most suitable available data ref this question. Q4 - the number of bus cancellations on these routes in AM peak during the last 6 weeks.
- Received 14 January 2025Decided 12 February 2025Part-GrantedNational Transport Authority (NTA)
[1.] any internal emails or similar correspondence among staff at the NTA since 1 October last regarding the 11 bus or the E spine of BusConnects, including records about a decision to delay the end of the 11 bus or introduce the E spine. [2.] any internal reports or briefings by the NTA regarding same since 1 October last.
- Received 15 January 2025Decided 12 February 2025Part-GrantedNational Transport Authority (NTA)
Any correspondence between the NTA and Fingal County Council about the 'bus stop enhancement programme' and projects under that funding stream from 1 January to 31 December 2024
- Received 14 January 2025Decided 11 February 2025Part-GrantedNational Transport Authority (NTA)
Correspondence between the developer and NTA in relation to a proposed development in Terenure, Dublin.
- Received 6 December 2024Decided 7 February 2025Part-GrantedNational Transport Authority (NTA)
1. A list setting out all NTA expenditure on external consultants in the years 2020-2024, the name of the consultancy in each case and the year in which the costs were incurred 2. A list setting out the purpose of the expenditure in each case 3. A list setting out the title of each consultancy report prepared in each case 4. A list setting out the number of printed pages in each consultancy report
- Received 8 January 2025Decided 6 February 2025Part-GrantedNational Transport Authority (NTA)
Copies of all information and records held by the NTA regarding Application for a public bus passenger service licence NTA Ref. 1074-17-02 Doolin Park & Ride – Cliffs of Moher
- Received 3 January 2025Decided 31 January 2025GrantedNational Transport Authority (NTA)
A copy of the Emerging Risk Radar report (referred to in board meeting of Oct '24).
- Received 29 January 2025Decided 30 January 2025Handled outside of FOINational Transport Authority (NTA)
[1.] There has been no exceptions made regarding the age of SPSV's that fall outside of the extended regulations which allowed the final operation date of vehicles that would have reached their final operational date between the 13th MARCH 2020 AND 31ST December 2024 [2.] There has been no exceptions of final operation dates made by the NTA under any circumstance for any SPSV that does not fall within exceptions stated in your email below including any cars that are were registered in 2015
- Received 8 January 2025Decided 28 January 2025Handled outside of FOINational Transport Authority (NTA)
[1.] The number of complaints made about buses in Waterford in 2023 and 2024. [2.] Where possible, the location of the service. [3.] And, where possible, the nature of the complaint. [4.] Where possible, the outcome of each complaint.
- Received 8 January 2025Decided 28 January 2025Handled outside of FOINational Transport Authority (NTA)
[1.] The number of complaints the NTA received about unlicensed taxi drivers in Waterford in 2024. [2.] The number of inspections carried out by or on behalf of the NTA of taxi licenses in Waterford. [3.] The number of convictions that were sought and the number obtained as a result of a complaint or inspection.
- Received 18 December 2024Decided 22 January 2025Part-GrantedNational Transport Authority (NTA)
In relation to 67 of the Road Safety Action Plan, that runs from 2021-2024 [1.] Establish if a Working Group has meet since September 2024. [2.] Copy of Working Group minutes
- Received 27 December 2024Decided 22 January 2025RefusedNational Transport Authority (NTA)
The latest available financial accounts for each of the Transport Coordination Units (TCUs) operating under the remit of the National Transport Authority.
- Received 10 January 2025Decided 22 January 2025WithdrawnNational Transport Authority (NTA)
All correspondence 2020 to date between the National Transport Authority and Bus Éireann regarding the ticket offices at Cavan and Monaghan Bus Stations and the Travel Centres/ticket offices at Waterford Bus Station, Athlone Bus Station and Cork (Parnell Place) Bus Station with specific reference to the closure/ reduction of these facilities.
- Received 13 January 2025Decided 22 January 2025Handled outside of FOINational Transport Authority (NTA)
Details of taxi complaints, including location of incidents and date of incidents in Ireland from the time period January 1st 2024 to December 31st 2024
- Received 3 January 2025Decided 21 January 2025Handled outside of FOINational Transport Authority (NTA)
Full details of taxi complaints, including a breakdown of such complaints and the location of such incidents, in County Kerry from the time period Monday, January 1st 2024 to Tuesday, December 31st 2024, with days inclusive.
- Received 16 January 2025Decided 20 January 2025WithdrawnNational Transport Authority (NTA)
Information regarding the 2025 Active Travel funding allocations, with specific reference to the allocations for Newbridge and the wider Kildare Local Electoral Area (LEA)
- Received 15 November 2024Decided 16 January 2025Part-GrantedNational Transport Authority (NTA)
1. Any and all internal communication relating to the potential delay, and decision to delay phase 6a of BusConnects from Dec 8th 2. Any and all Communication with service operators, including any references to the readiness to implement phase 6a on December 8 3. Any and all communications from Councillors or TDs relating to retention of the number 11 bus route. 4. Any and all communication from organised groups requesting delays to Phase 6a, or the retention of the number 11 bus route.
- Received 16 December 2024Decided 16 January 2025RefusedNational Transport Authority (NTA)
Correspondence and other records from the past 12 months on the rollout of cameras to detect drivers who fail to stop at red traffic lights.
- Received 9 December 2024Decided 13 January 2025RefusedNational Transport Authority (NTA)
Aon staidéar nó samhltu atá agaibh maidir le táillí dinimiciúil nó le táillí buaice agus seachbhuaice (dynamic or on and off peak pricing sa Bhéarla) ar traenacha, ar LUAS nó ar bhusanna. Ag lorg aon rud a dhéantar idir an 27ú Meitheamh 2020 agus an inniu [09/12/2024] [Translation: any study or modelling you have regarding dynamic or on and off peak pricing on trains, on the LUAS or on buses. Looking for anything between 27 June 2020 and today [09/12/2024 - date of request]]
- Received 6 January 2025Decided 13 January 2025TransferredNational Transport Authority (NTA)
Information on all current and all previous temporary speed restrictions operating on the Luas network in Dublin, including all available detail of the duration of the restriction and the reason(s) for the restriction.
- Received 25 November 2024Decided 23 December 2024Part-GrantedNational Transport Authority (NTA)
1) The locations within Dublin where NTA have funded the construction of a bus shelter in timeframe of 1st April 2024 to 22 November 2024 inclusive. With regards to Q1 I'm only looking for where the construction of the bus shelter has been completed or is ongoing at present; if ongoing at present please indicate when these works will be completed in tabular form. To be assistance only include locations where the bus shelter is on local authority owned grounds 2) A list of locations in Dublin where the NTA have agreed to fund the construction of a new bus shelter and planning permission have been approved if needed as of 25 November 2024 but the work of this projects will commence between 2 December 2024 and end March 2025. To be further assistance what I'm are seeking eg NTA have agreed to install a bus shelter at X location in Dublin and planning permission has been approved and this work will commence on Monday 6 January 2025 etc
- Received 20 November 2024Decided 19 December 2024RefusedNational Transport Authority (NTA)
Records (including correspondence, financial statements, minutes and memos) between the NTA and Dublin Bus in relation to the battery-electric bus fleet, to include (but not limited to) any costs involved and/or any issues encountered (including charging, recovery required and/or extra time needed at the base) from November 2023 to present.
- Received 18 November 2024Decided 17 December 2024RefusedNational Transport Authority (NTA)
All correspondence between the NTA and the Minister for Transport concerning the 'Cork Luas' or Cork's proposed light rail system
- Received 18 November 2024Decided 17 December 2024GrantedNational Transport Authority (NTA)
Any information you have on any increase or decrease in bus, taxi and luas journey times since the closure to private traffic of routes from Bachelors Walk to Eden Quay and from Burgh Quay towards Aston Quay along the River Liffey from 25 August 2024
- Received 19 November 2024Decided 17 December 2024RefusedNational Transport Authority (NTA)
Having regard to the NTA's decision to cease the operation of the bus stops at both Mountjoy Square & InisFallen Parade [Route 103 to Ratoath]: 1. The Business Case on which the cessation decision was taken , including the cost-benefit evaluation undertaken. 2. In the context of the social obligations of the NTA , the evaluation of the social costs resulting from the cessation decision, with particular reference to its adverse impact on the passenger demographic which used the two bus stops in question , notably the elderly & young persons/ teenagers. 3. The risk assessment undertaken in relation to the decision, including records regarding consultation with the local Garda at Fitzgibbon Street & Store Street in relation to the risks inherent for those using the two stops in question now having to walk to Beresford Place &/or Broadstone & Phibsborough Shopping Centre, in particular during times of darkness.
- Received 18 November 2024Decided 16 December 2024Part-GrantedNational Transport Authority (NTA)
Any documentation including reports/briefing materials/presentations or communications received from 01/01/2024 to date by the National Transport Authority (NTA) chief executive concerning contactless payments on public transport.
- Received 28 November 2024Decided 16 December 2024Part-GrantedNational Transport Authority (NTA)
A copy of the following presentation (Sept 2024 board meeting refers): Presentation by Billy Gilpin of Irish Rail to the September 2024 Board meeting regarding Irish Rails response to planned and unplanned disruptions
- Received 10 December 2024Decided 16 December 2024Handled outside of FOINational Transport Authority (NTA)
“[Regarding the Public Consultation on Proposed Small Public Service Vehicle (Contingency Measure – Vehicle Supply) (Maximum Permissible Age) Regulations in October 2022] The submissions made to the SPSV contingency measure Vehicle Supply”
- Received 20 November 2024Decided 13 December 2024GrantedNational Transport Authority (NTA)
1. Copies of all complaints made about taxi drivers operating in Cork for Q1 of 2024 2. Number of complaints in total
- Received 25 November 2024Decided 13 December 2024Handled outside of FOINational Transport Authority (NTA)
1. How many cycle lanes are currently in Dublin? 2. How many cycle lanes are projected to be built in Dublin in the coming years? 3. Statistics on how many people are using Dublin cycle lanes
- Received 11 November 2024Decided 11 December 2024Part-GrantedNational Transport Authority (NTA)
Reports on numbers of anti-social behaviour incidents on Dublin Bus services from 2019, from 2023 and the newest report available (where possible including what kind of anti-social behaviour, time of the day and bus line number.)
- Received 13 November 2024Decided 9 December 2024GrantedNational Transport Authority (NTA)
All records and correspondence created/modified since 1 Jan 2020, held by the NTA with respect to the interior layout, colour scheme, seat covering design, hand rail colour and livery of the DART+ new fleet
- Received 7 November 2024Decided 5 December 2024RefusedNational Transport Authority (NTA)
Communications between the National Transport Authority, Bus Eireann and the National Bus and Rail Union in regard of the 303 bus service in Limerick in the calendar year 2024, and the decision to suspend bus services in O'Malley Park and Southill.
- Received 2 December 2024Decided 5 December 2024GrantedNational Transport Authority (NTA)
The most up to date versions of the on board passenger announcements used on Dublin Bus and Bus Eireann