Construction of a wind farm by PWWP at Corrinshigo and Raragh, Kingscourt, Co. Cavan per Cavan 09/270. It was heard that an application was made to declare exempt the cables from the wind farm to the ESB Networks substation at Kilnalun, a distance of over 3 miles. An Bord Pleanála reference RL3375