On Schedule

Many of these actions have annual outputs, with elements due to date successfully delivered.

No.ActionProposed OutputSMP DeadlineProgress
02Continue awareness campaigns with the aim of promoting inclusivity, courtesy and respect for all when travelling on public transport.Annual Campaigns.2025 Q42022 saw an Anti-racism campaign, Support for Pride in June, and a campaign to support people with hidden disabilities. 2023 saw campaigns supporting users with disabilities, staff respect and anti-racism. A wheelchair priority campaign also ran. 2024 saw a “Transport for Ireland is Transport for you, transport for everyone” campaign emphasizing that every passenger, regardless of their differences, is part of the broader community that makes up Ireland’s public transport network For 2025 the NTA has embedded a range of diversity and inclusion communications campaigns in its annual marketing plan. This includes the ‘Please offer me a seat’ campaign and supporting users with disabilities with the JAM card.
03Continue to protect and renew rail infrastructure through the Infrastructure Manager Multi-Annual Contract (IMMAC).2024 Existing IMMAC reviewed. 2025 IMMAC 2025-2029 agreed.2025 Q4Due to change of Government at end of 2024 IMMAC rolled over and contract extended to cover 2025. IMMAC 2026-2030 on schedule to be approved by Government in 2025.
19Deliver additional cycling infrastructure projects in the five cities. (Complements CAP action 233, RSS action 5) *To ensure consistency with CAP action 233 and RSS action 5, reporting on this action covers all active travel infrastructure, not solely cycling.400 km GDA Network completed or under construction. 200 km Regional Cities Network completed or under construction.2025 Q4Around 1,000 active travel schemes are in design or implementation across the country. Since 2020, approximately 900 km of new or upgraded active travel infrastructure has been delivered, including an estimated 150 km in 2024. To date, 388km of the GDA Network and 327km of the Regional Cities Network are completed or under construction. A total of €322 million was drawn down for active travel projects in 2024.
No.ActionProposed OutputSMP DeadlineProgress
48Promote the principle of ‘Access for All’ across sustainable mobility services through:2022 Customer service officers provided on all inter-city trains. 2025 Eight additional railway stations equipped with footbridge and lifts to allow all platform access. All bus stations equipped with wheelchair accessible bus bay. Wheelchair accessible stops for lift equipped coaches provided in additional 50 towns. 100 additional low floor vehicles for regional/ inter- city coach services introduced. Roll-out of new National Journey Planner commenced. Changing Places toilets installed at three additional transport hubs.2025 Q4120 customer service officers have now been recruited by Irish Rail. Two rail stations were completed in 2022, one station in 2023 and Banteer was completed with opening in July 2024. The construction of footbridge, lifts and internal accessibility works was commenced in Rathmore in June 2024. Construction works for the installation of lifts and footbridges in Maynooth, Athy and Rathdrum commenced in Q3 2024 and is still ongoing. In total, four rail stations are complete and four are in construction. There are 25 bus and train stations that require wheelchair accessible bus bays. Of these, 21 stations are completed and 4 are in the design phase. Of the original 43 towns targeted for wheelchair-accessible stops for high-floor coaches, 25 towns are complete, 7 are now served by low-floor coaches, and discussions are ongoing for the remainder. An additional 21 accessible bus stops have also been installed at other popular locations. The NTA recently completed a survey in towns with a population of greater than 1,000 people to identify where more bus stops should be installed to cater for coaches with the wheelchair lift. The NTA is working with local authorities on progressing the nearly 100 newly identified towns. 103 double deck low floor coaches were ordered and put into service by the end of 2023. 25 additional low floor double deck coaches have been put into service in 2024, exceeding the output required. New Journey planner has been rolled out. Changing Places toilets in place at Heuston Station, Connolly Station and, the most recently opened, Colbert Station in Limerick in March 2024.
No.ActionProposed OutputSMP DeadlineProgress
76Ensure that the statutory reviews of the Regional Spatial and Economic Strategies include an analysis of land use development potential based on accessibility to each region’s proposed core public transport network.Review of RSES for the Eastern and Midland Region commenced.2025 Q4Following the commencement of Part 3 of the Planning and Development Act 2024, as amended, the review of all RSESs will commence in accordance with the planning legislation. In this respect, it is anticipated that the review of the EMRA RSES, as well as the RSESs for the Southern Region and Northern and Western Region, will commence in late 2025/early 2026.
77Prepare and commence implementation of local transport plans for regional growth centres and key towns having regard to the Area Based Transport Assessment Guidance Note.Local transport plans for regional growth centres and key towns completed.2025 Q4The NTA are currently working with the relevant local authorities to progress Local Transport Plans in the five Regional Growth Centres with three completed, one at draft stage and the final one commenced. Additionally, LTPs or transport studies are underway for 24 of the Key Towns, with nine completed and six progressed to draft stage. A number of plans are underway for other settlements across the country.