National Cycle Network Plan

Network Development

Development of the NCN corridors was based on an iterative process, summarised in Figure 4.1 and outlined in detail in this section.

Figure 4.1: Summary of Network Development Process

Figure 4.1: Summary of Network Development Process

Key assumptions that were central to defining the network were as follows:

Nodes are the towns, settlements or other key destinations which represent a start, end or layover point on the NCN. Three types of nodes were defined, as follows:

Primary node – Consisting of cities and / or large towns with a population of over 20,000 ─ people (towns with over 10,000 were also considered in areas which were more sparsely populated). These represent an NCN start or end point.

Secondary node – Consisting of medium sized towns with a population of between 10,000 ─ and 20,000 people (plus a selection of smaller towns in sparsely populated areas with populations of between 5,000 and 10,000). Major tourist attractions located outside urban areas were also included, and / or Major transport hubs. These represent an NCN start or end point.

Other nodes – Consisting of small towns and settlements, strategic destinations (e.g. transport ─ hubs, centres of education, centres of employment, leisure destinations, and tourist destinations).

Some exceptions to these classifications were made in areas that are remote and do not have the population threshold, to ensure an even and national spread of coverage.

Connections were defined as initial ‘straight line’ links between nodes. Following more detailed assessment of the opportunities presented by each link, a corridor between nodes was defined. Corridors are proposed only at an indicative level and provide a broad alignment within which there may be several potential routes. An options assessment exercise will be required to test the

National Cycle Network Plan

potential routes within a corridor against a series of criteria to define the preferred route. This options assessment exercise does not form part of the current project and will be undertaken as part of the roll out of the NCN.

An overview of each step in defining the NCN is presented in the following sections.

Step 1 – Define Destinations

Using the criteria outlined above, the key destinations for the NCN were identified, as outlined in Table 4.1 and Table 4.2.

Table 4.1: Primary NCN Nodes

Primary NCNBasis for inclusion
Nodes
ArmaghNI connection point close to border (may depend on NI greenway strategy)
Athlone>20,000 population
Balbriggan>20,000 population
Ballina>10,000 but less than 20,000 population but largest town in a sparsely populated region
Bray>20,000 population
Carlow>20,000 population
Castlebar>10,000 but less than 20,000 population but largest town in a sparsely populated region
Cavan>10,000 but less than 20,000 population but largest town in a sparsely populated region
Celbridge>20,000 population
Cork>20,000 population
DerryNI connection point close to border (may depend on NI greenway strategy)
Drogheda>20,000 population
Dublin>20,000 population
Dundalk>20,000 population
Ennis>20,000 population
EnniskillenNI connection point close to border (may depend on NI greenway strategy)
Galway>20,000 population
Kilkenny>20,000 population
Primary NCNBasis for inclusion
Nodes
Letterkenny>10,000 but less than 20,000 population but largest town in a sparsely populated region
Limerick>20,000 population
Longford>10,000 but less than 20,000 population but largest town in a sparsely populated region
Mullingar>20,000 population
Naas>20,000 population
Navan>20,000 population
Newbridge>20,000 population
NewryNI connection point close to border (may depend on NI greenway strategy)
OmaghNI connection point close to border (may depend on NI greenway strategy)
Portlaoise>20,000 population
Sligo>10,000 but less than 20,000 population but largest town in a sparsely populated region
StrabaneNI connection point close to border (may depend on NI greenway strategy)
Swords>20,000 population
Tralee>20,000 population
Waterford>20,000 population
Wexford>20,000 population
Wicklow>10,000 but less than 20,000 population but largest town in a sparsely populated region

National Cycle Network Plan

Table 4.2: Secondary NCN Nodes

SecondaryBasis for inclusion
Nodes
Arklow>10,000 population
Ashbourne>10,000 population
Athlone stationRail transport hub
Balbriggan stationRail transport hub
Ballina StationRail transport hub
Bettystown>10,000 population
Carlow stationRail transport hub
Carrigaline>10,000 population
Castlebar stationRail transport hub
Ceannt Station GalwayRail transport hub
Clonmel>10,000 population
Cobh>10,000 population
Connolly StationRail transport hub
Cork AirportTransport hub
Dublin AirportTransport hub
Dublin PortFacilitates passenger ferries / cruise ships
Dun Laoghaire HarbourFacilitates passenger ferries / cruise ships
Ennis stationRail transport hub
Enniscorthy>10,000 population
Galway HarbourFacilitates passenger ferries / cruise ships
Greystones>10,000 population
Heuston StationRail transport hub
Kent Station CorkRail transport hub
Killarney>10,000 population
Leixlip>10,000 population
Longford StationRail transport hub
MacBride Station DroghedaRail transport hub
MacDiarmada Station SligoRail transport hub
SecondaryBasis for inclusion
Nodes
MacDonagh Station KilkennyRail transport hub
Malahide>10,000 population
Mallow>10,000 population
Maynooth>10,000 population
Middleton>10,000 population
Monaghan>5000 but less than 10,000 population but largest town in the region
Mullingar stationRail transport hub
Sallins & Naas stationRail transport hub
Newbridge stationRail transport hub
O Hanrahan Station WexfordRail transport hub
Plunkett Station WaterfordRail transport hub
Port of CorkFacilitates passenger ferries / cruise ships
Port of WaterfordFacilitates passenger ferries / cruise ships
Portlaoise StationRail transport hub
Roscommon>5,000 but less than 10,000 population but largest town in the region
Rosslare EuroportFacilitates passenger ferries / cruise ships
Shannon AirportTransport hub
Skerries>10,000 population
Thurles>5,000 but less than 10,000 population but largest town in a sparsely populated region
Tramore>10,000 population
Tullamore>10,000 population
Westport StationRail transport hub
Wicklow stationRail transport hub

National Cycle Network Plan

Step 2 – Identify Connections

Connections between nodes were established and links connecting the Primary and Secondary Nodes were developed. These connected primary nodes to adjacent primary and secondary nodes, as well as secondary nodes to adjacent primary nodes (either directly or via another secondary node).

Figure 4.2: NCN Nodes and Links

Figure 4.2: NCN Nodes and Links

National Cycle Network Plan

Step 3 – Stakeholder Workshop: Destinations & Links

Workshops were held with key stakeholders to discuss and agree the nodes included in the NCN, as well as the proposed links between nodes. Stakeholders included the Department of Transport, the NTA, the CCMA, Fáilte Ireland, Sport Ireland, Cyclist.ie.

The discussions primarily revolved around defining primary and secondary nodes, and the density of the resulting cycle network. Initially, a population threshold of 10,000 or more was proposed for settlements, but it was deemed insufficient to provide comprehensive coverage. After engaging with stakeholders, it was unanimously agreed to lower the threshold to settlements with a population greater than 5,000 people. Additionally, transportation hubs such as train stations, airports, and ferry / cruise ship ports were identified as key nodes. Smaller settlements and other significant destinations like educational centers, recreational spots, and tourist attractions were classified as other nodes. This approach was agreed as it would lead to a suitably dense national network.

Step 4 – Identify Corridors

Once the NCN primary and secondary nodes were determined, the Links from Stage 2 were refined to develop corridors and corridor options connecting primary and secondary nodes. The purpose of this stage was to refine these links and to develop a series of corridor options. Corridor options were indicative alternatives of how to connect the primary and secondary nodes and aim to provide connections to other nodes (e.g., smaller settlements) where appropriate. An example of the corridor development approach is illustrated in Figure 4.3.

The identification of corridor options factored in multiple data sets using the NCN GIS dashboard developed for this purpose and targeted the use of existing or planned cycling (and other linear) infrastructure whenever possible.

Corridors connect:

Primary nodes (●) and Secondary nodes (●) ─

Corridors aim to incorporate:

Tertiary nodes, i.e., smaller settlements (●), centres of education, centres of employment, ─ leisure destinations, and tourist destinations

Existing cycle networks / infrastructure (–,–,–) ─

Planned cycle networks / infrastructure (–,–) ─

─ Other existing or natural resources, e.g., disused railways (—)

Figure 4.3: Example of Corridor Development -- NCN GIS dashboard (left), proposed NCN corridor options (right)

Figure 4.3: Example of Corridor Development — NCN GIS dashboard (left), proposed NCN corridor options (right)

Figure 4.3: Example of Corridor Development -- NCN GIS dashboard (left), proposed NCN corridor options (right)

Figure 4.3: Example of Corridor Development — NCN GIS dashboard (left), proposed NCN corridor options (right)

National Cycle Network Plan

Where more than one potential corridor alignment existed for a given linkage between two nodes, possible corridor options were assessed as outlined in Step 5 to identify the best performing option for inclusion in the NCN. Identified corridors were approximately 4km wide and did not include any design information.

Step 5 – Corridor Options Assessment

Where multiple options for NCN corridors had been identified, the performance of each option was determined by consideration against a range of assessment criteria as described below. The assessment of corridor options against these criteria was informed by a series of specific data sets as summarised in Table 4.3. Full details of the assessment approach, results and a list of the preferred corridor options are provided in Appendix E.

Table 4.3: Assessment Framework Summary Table

NCN Plan ObjectivesNCN AssessmentData Set
Criteria
Increase the number of cycle trips by improving the provision of safe and attractive cycling infrastructure. Connect to strategic destinations outside of urban areas as appropriate (including centres of education, centres of employment, and leisure destinations).Commuter TripsDatabase of smaller settlements between the 1,000 and 5,000 population (Other Nodes)
School TripsData base of Primary and Secondary Schools - Developed by AECOM
Leisure TripsData base of leisure facilities – including sports clubs and off-road trails - Developed by AECOM
Promote the design of cycling infrastructure that meets safety requirements. Promote the design of cycling infrastructure that provides a safe and secure environment for all users.Potential Safety ImpactsNational Transport Models Road Network showing flows in the form of AADT, posted speed limits and average speeds.
Integrate with existing and proposed cycling infrastructure (including greenways, safe routes to schools, the EuroVelo network, Interreg projects), as appropriate Incorporate existing greenways, disused railways, canals, bypassed national roads, regional and local roads, long distance trails, as appropriate. Propose corridors to maximise the number of users. Future-proof cycle route capacity, taking account of population growth and additional demand from modal shift. Connect to strategic destinations outside of urban areas as appropriate (including centres of education, centres of employment, and leisure destinations).Integration with Existing Cycle InfrastructureDatabase of existing cycle infrastructure – including greenways, Blueway’s and Eurovelo routes – developed by AECOM
Integration with Planned Cycle InfrastructureDatabase of proposed cycle infrastructure – including greenways, Blueway’s and Eurovelo routes – developed by AECOM
Integration with Existing InfrastructureDatabase of disused railways developed by AECOM
Integration with transport modesDatabase of train stations - Developed by AECOM
Integration with Tourist AttractionsFáilte Ireland database of tourist attractions with visitor numbers <200k total visitors in 2019.
Scenery and Route AttractivenessESRI Basemap

National Cycle Network Plan

NCN Plan ObjectivesNCN AssessmentData Set
Criteria
Enhance local environments and biodiversity where possible (e.g., pollinator plans, green corridors). Support the development of cycling and walking culture in Ireland.Impact on sensitive areasDatabase of Special Protection Areas, Special Areas of Conservations and Proposed National Heritage Areas / National Heritage Areas and architectural conservation areas – Developed by AECOM.
Connect to strategic destinations outside of urban areas (including transport hubs and tourist destinations), as appropriate.Social InclusionPobal deprivation index - Developed by AECOM
Integration with Smaller SettlementsDatabase of smaller settlements between the 1,000 and 5,000 population (Other Nodes)
GradientESRI Contour Maps

Strategic Environmental Assessment (SEA) and Appropriate Assessment (AA) were integral to the option selection process.

SEA is a systematic process for evaluating the environmental consequences of proposed plans or programmes to ensure environmental issues are fully integrated and addressed at the earliest appropriate stage of decision making, with a view to promoting sustainable development. The assessment identified and evaluated the likely significant effects of each potential corridor option on an established baseline. The results of this assessment, contained in the SEA Environmental Report (Appendix G), was integral to the identification of the preferred corridor options.

An AA is an assessment of the potential adverse effects of a plan or project (in combination with other plans or projects) on the Natura 2000 network of European sites, i.e. Special Areas of Conservation (SACs) and Special Protection Areas (SPAs). Appropriate Assessment was integral to corridor assessment because likely significant effects cannot be dismissed alone, except for corridors 11 (Westport to Castlebar), 26 (Newcastle West to Tralee / Limerick), 57 (Newbridge to Naas) and 68 (Naas to Dublin), which could be screened out of AA because there are no European sites within the 4km corridors. The AA concluded that the flexible nature of the proposed NCN corridors provides the ability for all final cycle routes to be designed in such a way as to minimise and potentially avoid impacts rendering them non-significant, so long as the mitigation measures and development process outlined in the NIS, and summarised in Section 7.6, are employed.

The Appropriate Assessment is provided as part of the Natura Impact Statement in Appendix I.

Step 6 – Stakeholder Workshop

Having successfully completed Step 5, a comprehensive network of individual corridors between NCN Nodes was identified. The proposed corridors were those that best served the needs of the local community , having the potential to provide for the highest number of cycling trips and aligning with the objectives of the NCN Plan.

The next step in the NCN development process was to hold a series of workshops to discuss the network and allow stakeholders raise any potential issues. Stakeholders included the Department of Transport, the NTA, the CCMA, Fáilte Ireland, Sport Ireland, Cycling Ireland, Cyclist.ie.

The discussions focused on the process used to develop the corridors and a review of the resulting network. The issue of network coverage on the west coast was again highlighted but reviewing the proposed NCN in the context of other existing and planned cycle infrastructure (i.e., EuroVelo routes and greenways) it was agreed that the coverage and density of the corridor options presented achieved the project objectives and provided the intended core network.

National Cycle Network Plan

Step 7 – Public Consultation

The emerging NCN network was presented for public consultation to solicit the public’s views and opinions on the identified nodes and corridors and gain valuable feedback. Many of the stakeholders involved in previous workshops also submitted detailed feedback on the proposed NCN.

Some of the main points raised by submissions received during the public consultation in relation to the proposed network included:

Expanding the network to include additional greenways and rural settlements.

Incorporating (and upgrading) existing (and proposed) cycle infrastructure where possible.

Integrating with local cycle networks and connect town centres.

Feedback from public consultation was incorporated during finalisation of the NCN Plan and is included in Appendix C of this report.

Figure from page 43

Figure from page 43

Feedback on NCN Propo