7.6 Environmental Assessment
7.6Environmental Assessment
All future NCN projects will be subject to the planning and environmental processes before advancing to construction. In this regard, specific points identified in the SEA / AA for inclusion in the NCN Plan are outlined below.
Where corridors are advanced to route selection, they must undergo a robust route selection process that will include environmental assessment. This should be informed by appropriate expertise and include measures to protect existing biodiversity features and to promote biodiversity enhancement.
Development of the NCN routes will adhere to all required environmental assessments at the design and implementation stages and will also consider the specific measures included in its AA for each of the NCN corridors. No project that has an adverse effect on the integrity of a European site will be progressed.
Initiatives bought forward under each of the corridors will require scrutiny, so should undertake a project level Appropriate Assessment (AA) screening to determine whether the initiative / route will have an adverse effect on the integrity of European sites either alone or in combination with other plans and projects.
No projects or plans giving rise to significant cumulative, direct, indirect, or secondary impacts on Natura 2000 sites arising from their size or scale, land take, proximity, resource requirements, emissions (disposal to land, water or air), transportation requirements, duration of construction, operation, decommissioning or from any other effects shall be permitted on the basis of this plan (either individually or in combination with other plans or projects) and each project or plan brought forward under the NCN Plan should be subject to appropriate assessment screening.
Each project will be required to produce a Construction Environment Management Plan (CEMP) in accordance with all relevant legislation, serving the purpose of compliance.
The risks to the safeguarding and integrity of the qualifying interests and conservation objectives of the Natura 2000 network during the planning and design stage of any future NCN projects have been addressed by the inclusion of mitigation measures that will prioritise the avoidance of impacts in the first place and mitigate impacts where these cannot be avoided. In addition, all lower-level plans and projects arising through the implementation of the NCN Plan will themselves be subject to Appropriate Assessment (AA) when further details of design and location are known.
In determining the final route alignment, new construction within 200m of European sites will be avoided insofar as possible. Existing roads and bridges will be used where feasible, and no new lighting will be introduced unless it does not affect site integrity. Detailed design requirements will be considered for potential impact on recreational access and pressure on European sites. Noise and air quality assessment will be required if new construction is necessary, and potential loss of habitat for SPA birds will be considered. Wintering bird surveys may be required, and micro-design adjustments will be made to ensure no adverse effects on European sites before works are consented.

Figure from page 63
Pages 62–63 · View in original PDF