70 [approximately 110kph]

*Separation strip should be at least 0.5m alongside kerbside parking and 1.5m where wheelchair access is required.

Regional Design Manuals

Many regional or local authorities publish their own design standards for application on cycle infrastructure under their authority. A frequently cited and referenced manual is that produced by Transport for London (TfL), the London Cycling Design Standards (LCDS)6 published in 2019.

The LCDS details guiding principles and detailed design requirements. It does not carry a legal obligation, but ‘any decision to depart from its advice should be accompanied by a reasoned justification for doing so’ (Transport for London, 2019). It specifies six core design outcomes, similar to those of the Cycle Infrastructure Design manual: Safety, Directness, Comfort, Coherence, Attractiveness and Adaptability.

It also specifies 20 guiding principles (also like those of the Cycle Infrastructure Design manual):

1.Cycling is now mass transport and must be treated as such.

2.Facilities must be designed for larger numbers of users.

3.Cycles must be treated as vehicles, not as pedestrians.

6https://bicycleinfrastructuremanuals.com/manuals1/London%20Cycling%20Design%20Standards%202016_UK%20London.pd f

National Cycle Network Plan - Appendices

4.Cyclists need space separated from volume motor traffic.

5.Where full segregation is not possible, semi-segregation may be the answer.

6.Separation can also be achieved by using lower-traffic streets.

7.Where integration with other road users is necessary, differences of speed, volume and vehicle type should be minimised.

8.Cyclist interventions need not be attempted on every road.

9.Routes must flow.

10.Routes must be intuitively understandable by all users.

11.Provision must be consistent and routes must be planned as a network.

12.Routes and schemes must take account of how users actually behave. If they do not, they will be ignored.

13.Many of the standard tools currently used to manage cyclists’ interactions with others do not work.

14.Changes in road space can influence modal choice.

15.Trials can help achieve change.

16.Avoid over-complication and the ‘materials trap’.

17.But do not be afraid of capital infrastructure.

18.All designers of cycle schemes must experience the roads on a cycle.

19.As important as building a route itself is maintaining it properly afterwards.

20.Know when to break these principles.

Given that the context of the report is specific to London, its focus is primarily on cycle infrastructure in an urban setting and providing guidance on assessing the Cycling Level of Service (CLoS). A CLoS assessment matrix and a junction assessment tool are provided. Detailed guidance and criteria are provided for cycle lanes and tracks, junctions and crossings, signs and markings, construction and cycle parking some of which are included here.

National Cycle Network Plan - Appendices

Figure from page 107

Figure from page 107

Figure B.13 : Traffic Calming Techniques (extract from LCDS)

Figure from page 107

Figure from page 107

Figure B.14 : Cycle Calming Techniques (extract from LCDS)

National Cycle Network Plan - Appendices

National Cycle Network Design Principles

Sustrans have published design principles for the National Cycle Network, however, they are relatively high level and do not provide specific criteria other than ‘be designed in accordance with current best practice design guidance’ (Sustrans, n.d.). Nine design principles are listed:

  1. Be traffic-free or a quiet-way.

  2. Be wide enough to comfortably accommodate all users.

  3. Be designed to minimise maintenance.

  4. Be signed clearly and consistently.

  5. Have a smooth surface that is well drained.

  6. Be fully accessible to all legitimate users.

  7. Feel like a safe place to be.

  8. Enable all users to crossroads safely and step-free.

  9. Be attractive and interesting.

Sustrans does provide guidance on design for two specific link types: low traffic neighbourhoods as well as traffic-free routes and greenways.

The Introductory Design Guide to low traffic neighbourhoods does not include criteria or any geometric guidelines, but rather details the design approach and desired outcomes. It highlights the need for significant community engagement in the design process (Sustrans, n.d.).

The Traffic-free Routes and Greenways Design Guide is more detailed and does provide geometric design recommendations; in particular for widths, horizontal separation from carriageway, horizontal and vertical alignment, and visibility (Sustrans, n.d.).

Accessibility

Although the design and implementation of cycling infrastructure is addressed by local authorities, Sustrans have published guidelines to promote safe and accessible cycling infrastructure which can be accessed online7. One of these is the self-published Cycling for Everyone Report that takes inspiration from the Equality ACT 2010 placing ‘a duty upon the public sector to protect people from discrimination in wider society’ (Sustrans, 2020).

To make cycling more accessible for all people and different cycle types, Sustrans recommends several actions that can be taken to design new and adjust existing cycle infrastructure. Firstly, removing or adjusting barriers on existing cycle infrastructure including gates, access barriers, and steps should be a priority. This includes widening existing routes and designing routes to provide adequate turning space for all cycles. Another action includes ensuring inclusive cycle design infrastructures are set and followed. Sustrans advocate for inclusive design standards developed as part of a wider set of cycling infrastructure standards. This includes improving the consistency of routes (colour, signage, surface materials, etc.) and giving priority to cyclists and pedestrians at junctions. Sustrans recommends introducing continuing professional development (CPD) training for engineers on inclusive cycling including experiential training where transport professionals meet a whole range of users to other perspectives and try-out adoptive cycles. Finally, Sustrans recommends prioritising cycling infrastructure where public transport is poor.

7 Walking and cycling infrastructure design guidance - Sustrans.org.uk, https://www.sustrans.org.uk/forprofessionals/infrastructure/walking-and-cycling-infrastructure-design-guidance

National Cycle Network Plan - Appendices

Lessons Learnt

Fragmented Standards

Allowing each authority to determine their own set of design standards provides the opportunity for quick iteration and flexibility at the local level but has also resulted in a significant duplication of effort with design standards appearing to be very similar. It also means that standards for cross-boundary projects (such as the National Cycle Network) are harder to implement consistently.

Design and Summary Principles

The Design Principles of the Cycle Infrastructure Design Manual provide a purpose or desired outcome while the Summary Principles (or Guiding Principles of the London Cycling Design Standards) provide suggestions on how the outcomes might be achieved. Both are important to include as guidance to designers / planners as part of the design process.

National Cycle Network Plan - Appendices

Netherlands

The Netherlands was selected as an example of ‘best in class’ for both cycle culture, the quality of cycle infrastructure and providing international leadership in cycle design standards. The Netherlands is widely regarded as the world’s most successful cycle nation with over 35,000km of segregated cycle lanes (Dutch Cycling Embassy, 2021). Over one quarter (28%) of all journeys are made by cycling, covering over 17.6 billion kilometres per annum. Cycling in the Netherlands is also considered to be very safe, with less than one fatality per 100 million kilometres cycled.

The L-F Routes in the Netherlands make up the Nederlands Fietsnetwerk (national cycle routes). They are long distance cycling routes that form a network in the Netherlands and Flanders region in Belgium (Holland Cycling Routes, 2022). As of January 2021, they consist of over 3,300km and are generally intended for recreational multi-day cycle tours or cycling holidays. Most L-F routes are signposted in two directions, letters ‘a’ and ‘b’ being used for either direction.

Figure from page 110

Figure from page 110

Figure B.15 : The Dutch Cycle Network (L-F Routes shown in red and local / regional routes shown in green)

Utrecht is an example of a cycle-friendly city in the Netherlands where over 125,000 cyclists travel into the city each day for work (47% of total commuters) (Gemeente Utrecht, 2019). These come from many of Utrecht’s suburbs such as Hoeten, which alone includes 129km of cycle paths (ITDP Europe, 2019). The link from Hoeten to Utrecht (10 kilometres) is entirely segregated, allowing commuters to travel to work safely and efficiently. Many Dutch towns and cities (including Utrecht) have a ‘soft’ green core that is only accessible to cyclists and pedestrians. Therefore, drivers who want to navigate the town may have to take a lengthy detour via a ring road while cyclists can pass directly through the town centre.

Cycling routes in rural areas are similar to those in the city: Cycle paths (segregated cycling infrastructure) are built where possible and cycle lanes (non-segregated) are also available to use. Highways and “provincial roads” (main roads where the province is responsible for maintenance), are usually fitted with segregated cycle paths.

National Cycle Network Plan - Appendices

As previously mentioned, 35,000km of the country’s cycling infrastructure has been physically segregated from motor traffic (CROW, 2012). On roads and streets where the speed limit is low, cycles share the road with motorists. The surface quality of these cycle paths tends to be good, and the routing is generally direct with gentle turns making it possible to cycle at consistent speeds for considerable distances.

Cycle Policies

The Netherlands has a history of research on effective policies for promoting cycling tracing back to the 1970s. In the Netherlands (like many European countries) cycle usage increased until the 1950s when car ownership became more accessible. In 1975 theFietserbond (Dutch Cyclists’ Union) came into existence in response to the oil crisis in 1973 and the high number of road accidents involving young children at the same time. By the 1990s the central government had initiated many projects outlined in theMasterplan Fiets (Cycle Masterplan). New concepts such as shared-spaces, cycle-streets, and cycle-highways were introduced in this plan and implemented in cities and towns throughout the Netherlands.

CROW is the center for cycle policy for the Dutch Government. The objective of CROW is to develop, disseminate, and exchange practical knowledge to create cycling policy (About CROW, n.d.). The Design Manual for Bicycle Traffic (DMBT) produced by CROW has been influential in creating cycle policies in the Netherlands. Many countries in Europe have taken inspiration from the DMBT to create their own cycle policies. It is perceived to be the gold standard in bicycle design infrastructure manuals (Liu, 2021).

Cycling is heavily encouraged by the national government. Mileage of up to €0.19 per kilometer can be granted and claimed tax-free (government.nl, 2020). This works in much the same way that someone driving their own car for business purposes can claim back a fixed sum related to the distance travelled.

The Dutch invest €487 million annually (as of 2010) in new cycling schemes, cycling research projects, and cycling infrastructure (A View from the Cycle Path, 2010). National government grants account for 40% of the investment in cycle infrastructure, with regional governments providing the rest.

The Design Manual for Cycle Traffic (CROW)

CROW is a non-profit organisation that specialises in road and highway design within the Netherlands and provides support on regulations at a national level (CROW, 2021). The group advises the Directorate- General for Public Works and Water Management (DGPWWM) (formerly Minster of Transport and Water Management), which conducts a role as the practical execution of public works and water management. The DGPWWM is committed to improving quality of life, access and mobility in a clean, safe and sustainable environment. The Design Manual for Cycle Traffic (DMBT) contains all relevant aspects for creating and maintaining effective cycling infrastructure. The manual is a set of guidelines, considered best practice. Nearly all cycle laws in the Netherlands relate back to this document.

The DMBT encourages designers to heed four recommendations at each stage of the design process:

Put yourself in the shoes of the cyclist as future user of the design, also taking into account vulnerable groups of cyclists, such as children and the elderly.

Ensure that facilities fulfil the policy objectives so that they support the policy.

Devote attention to the (spatial planning) integration of cycle facilities in the surrounding area.

See to it that the function, design and use of infrastructure are in equilibrium.

It also documents its fundamental principles and outlines five main requirements that cycle-friendly infrastructure must satisfy:

  1. Cohesion – The cycle infrastructure forms a cohesive whole and link all origins and destinations that cyclists may have.

National Cycle Network Plan - Appendices

  1. Directness – The cycle infrastructure always offers the cyclist as direct a route as possible (detours kept to a minimum).

  2. Safety – The cycle infrastructure guarantees the road safety and health (minimum exposure to harmful substances) of cyclists and other road users.

  3. Comfort – The cycle infrastructure ensures that cyclists experience minimal nuisance (vibrations, extra exertion due to height differences, trouble from other traffic) and delay (stops).

  4. Attractiveness – The cycle infrastructure has been designed and fitted in with its surroundings in such a way that it is appealing or attractive.

The DMBT also includes specific requirements for various cycle infrastructure types. When deciding between implementing cycle lanes and cycle paths it is necessary to consider the safety, exposure to emissions, and available space. CROW takes inspiration from research conducted in the 1980s that concluded that 50% fewer accidents involving injury occurred on segregated cycling infrastructure in comparison with cycle lanes. Exposure to air pollution is a valid reason for choosing a cycle path over a cycle lane, particularly if the cycle path is several meters away from the main road. If less than 11.80m is available for cyclists and motor-vehicles on a dual-carriageway then it would not be possible to implement two one-way cycle lanes correctly.

Dutch law only references one type of cycle lane (on-road cycling infrastructure), separated from the main road with either a broken / dashed line or continuous white line. Where the cycle lane is separated by a broken line motorists may use the cycle lane if absolutely necessary. This means motorists can enter the cycle lane to overtake another vehicle, make way for on-coming traffic, reach a parking bay, or drive down a side street. Driving on a cycle lane where there is a continuous white line is prohibited. In this case, lanes for motor traffic must be wide enough to make it possible for motorists to stay in their own lanes. A cycle lane is only legally a cycle lane when there are bike symbols on the lane. The recommended cycle width is based on the fundamental principle that two cyclists should be able to cycle abreast, either for companionship or for the purposes of overtaking. There should be a minimum gap of 0.5m between cycle lanes and the main road.

Where there is enough space, larger roads are fitted with a parallel fietspad (cycle track / path). These cycle tracks are separated from motorist and pedestrians by a physical means for example by a paved or unpaved verge, a raised curve or another barrier. The minimum width for cycle tracks is 2m, although, they may narrow to 1.5m at certain intersections. Standard widths are generally 2.5m for one-way tracks and 4m for bi-directional cycle tracks. Mopeds are obliged to use cycle tracks when their maximum speed is no more than 25km/h (these are distinguishable with a yellow licence plate).

Some cycle tracks do not follow or run alongside a road and exist to support cyclists with a more direct route to common destinations such as town centres. This complete separation of modes is called the ‘unravelling / unbundling of modes’ and is an important feature of Dutch urban design and traffic management. A lot of roads for motorised traffic have been diverted to go around residential areas especially in the last 10 to 20 years in the Netherlands (Bicycle Dutch, 2012). Municipalities used the opportunity these diversions gave them, to downgrade the original routes to make them fast routes for cyclists. Because traffic is unbundled there are fewer places where different types of traffic have to react, leading to a reduced need for crossings and adding to the overall level of safety.

‘Grey roads’ are a type of cycle lane also included in the Design Manual for Bicycle Traffic. These types of cycling infrastructure are more suited in built-up areas that are too narrow for cycle paths and accommodate a considerable amount of motor-traffic (unspecified). They are essentially cycle lanes without the space for a 0.5m separator between the main road and the cycle lane. Grey roads are generally not recommended as in many situations motor vehicles will have to veer onto the cycle lane due to an oncoming bus or lorry, and cyclists may have to use the driving lane to overtake slower cycles such as cargo bikes.

Fietssnelwegen (cycle highways) andFietsroute+ (intercity routes) have extra features making them more suited to long distance commutes and intercity cycling, such as level and straight stretches,

National Cycle Network Plan - Appendices

absence of traffic lights, level crossings with motorised traffic, and superior pavement quality. These routes are clearly signposted making them easily distinguishable from other cycleways. Cycling interest groups and national and local governments advocate these routes as being a solution for the further reduction of vehicular congestion as cyclists can achieve higher average speeds and maintain them. CROW recommends that cycle highways consist of bi-direction cycle tracks, with the minimum of each uni-directional way being at least 2m wide.

Fietsstraats (cycle streets) are roads where cycles are the primary and preferred choice of transport and where cars and motorised vehicles are allowed as ‘guests’ (Bicycle Dutch, 2022). There are 4 types of fietsstraat, but they are all required to have a speed limit of 30km/h or less and are usually coloured the same red asphalt as cycle paths. These streets generally exist in areas where low-road traffic is expected. Fietsstraats are generally recommended where the volume of cycles is expected to be more than motor vehicles. According to CROW, a road section should only be deemed a fietsstraat if at least 1,000 cycles pass through it in a 24-hour period. On bicycle streets, motor vehicles should be limited to 500 units per 24-hour period.

A summary of the standards of the different cycling infrastructures is given in Table B58.

The CROW design manual also recommends that the ratio of the volume of motor vehicles to the volume of bicycles (both per hour) is considered when designing a road. Figure B16 suggests whether to segregate cycle traffic from motor vehicles, either a cycle highway or cycle path / track, or mix traffic, either through a cycle lane (‘spacious profile’) or bicycle street, based on the volumes of cycle traffic and motor traffic per hour. A ‘tight profile’ is where a motor vehicle must stay behind a cycle when faced with oncoming traffic and usually takes the form of a bicycle street.

Figure from page 113

Figure from page 113

Figure B.16 : Suggested Solutions for Profile Choice when Mixing Motorised Traffic and Bicycle Traffic (CROW)

8 CROW – Design Manual for Bicycle Traffic

Table B.5 : Recommended Standards for Varying Types of Cycling Infrastructure (CROW)

Cycle Route TypeSegregated from main road?DirectionMarkings / BarriersDesirable minimum width (m)AbsoluteSpeed Limit for motoristsVehicles permitted
minimum at
constraints
(m)
Cycle LaneNo1-wayBroken white line2.3m1.5mUnspecifiedCycles, motorists only if necessary
No1-wayContinuous white line2.3m1.5mUnspecifiedCycles only
Cycle Path/TrackYes1-wayPaved / unpaved verge or raised curve2.5m1.5mN/ACycles, mopeds <25km/h
Yes2-wayPaved / unpaved verge or raised curve4.0m3.0mN/ACycles, mopeds <25km/h
Cycle HighwayYes (doesn’t follow a road)2-wayUnspecified2.5m2.0mN/ACycles only
Bicycle StreetsNo1-wayUsually, a broken white line and coloured red2.9m1.5m30km/hCycles, motor- vehicles

Limiting access to urban cores to pedestrians and cyclists provides an additional incentive to make trips via cycle – as well as separating modes. While this may only be feasible in larger urban centres in Ireland, the idea of providing direct connections to cyclists rather than tracking more circuitous routes built for cars could be applied in many urban and suburban areas. In particular, town bypasses could provide opportunities to allow cyclists a more direct route into town centres when approaching from an interurban route (e.g., the NCN) rather than following new bypass roads that route around the town centre.

The explicit focus of designing from a cyclist’s point of view – including vulnerable groups of cyclists – highlights that the ultimate goal is to have more people using the infrastructure and making trips by cycle. It is important not to lose this perspective at any stage of the design process.

Appendix C

Public and Stakeholder Feedback

National Cycle Network Plan - Appendices

C.1 Written Submissions

Thirty-seven written submissions were received from interested parties and individuals. These submissions are documented in Table C.1. The main recommendations are summarised below – based on the same categories used to analyse the online feedback survey (Corridor Selection, Safety and Amenities and Accessibility).

Table C.1 : Written Submissions Received during Public Consultation

Organisation / Individual
Bolt IrelandEast Mayo Greenway GroupLimerick City and County CouncilSteven Matthews, TD
Cara Sport Inclusion IrelandEirGridLimerick branch of the Green PartySustrans Northern Ireland
Cavan County CouncilSmugglers Cycling ClubLongford County CouncilTIER Mobility UK & Ireland
Celbridge Cycling CampaignISCYcle Project Team, University of LimerickDonegal County CouncilTipperary County Council
Connemara Greenway Action GroupGalway Cycling CampaignMid West National Road Design OfficeWaterways Ireland
Cork Transport and Mobility ForumGalway Cycling SolutionsNavan Cycling InitiativeWexford Bicycle User Group
Cyclist.ieIrish Central Border Area Network (ICBAN)Retail Grocery Dairy & Allied Trades Association (RGDATA)Wheels of Athenry
Denis Naughten, TDGalway City CouncilSligo Cycling CampaignMeath County Council
James AtkinsonFáilte IrelandDublin Port CompanyLaois County Council
Sport Ireland

C.2 Corridor Selection

Many of the submissions included recommendations to extend the network to additional settlements or key destinations. Most of these did not meet the criteria for inclusion on the NCN or were deemed better served by alternative cycle network infrastructure (e.g., greenway, county cycle network). See Appendix E for a detailed analysis of recommendations received regarding the corridor selection.

C.3 Safety

Ten of the written submissions expressed safety concerns over the infrastructure requirements of the NCN plan. The majority of these comments regarded the need for segregated cycle lanes. Many submissions argued that high traffic volume and speed on adjacent roads would create unsafe environments for cyclists if using unsegregated cycle infrastructure, potentially leading to a reduced usage of the NCN. Additionally, to ensure safe access to the NCN throughout the day and across different seasons, a number of submissions mentioned the importance of adequate lighting along the route. These submissions also stressed that a lack of lighting may prevent certain demographic groups, such as women and children, from comfortably cycling during darker periods of the day / year. Other submissions highlighted a lack of safe cycle infrastructure in rural areas and cyclist safety at major roundabouts.

National Cycle Network Plan - Appendices

C.4 Amenities and Accessibility

Eleven of the written submissions expressed concerns regarding the accessibility of the planned NCN. A majority of these responses stressed the importance of seamless experiences through intersections for cyclists. Other submissions expressed concerns over accessibility to the NCN for disabled individuals. Specific concerns regarded the inability for adapted cycles to pass through “kissing gates” and the adapted cycle parking requirements. Additionally, a few submissions highlighted the need to connect cyclists to town centres and schools among other points of interest and stressed the need for these connections to facilitate daily commuting trips.

C.5 Stakeholder Workshops

A series of 1-on-1 meetings or workshops were held with engaged parties at various stages of the project. Initially these focused on raising awareness of the project, receiving feedback on project objectives, and obtaining data regrading existing and planned cycle infrastructure. During Stage 3 of the plan development, it involved a discussion on key destinations and network corridors. Participation in these workshops was high and the various stakeholders were positive regarding the proposals. They provided feedback and guidance on how to proceed with the analysis and insights on areas or issues to be considered when developing the network.

C.6 Public Survey Feedback

The respondents to the survey cycled more frequently compared to a nationally representative sample9

(as might be expected based on engagement with and promotion by cycle advocacy groups).

Figure from page 117

Figure from page 117

100%

58; 6%9; 1%148; 11%
225; 16%
274; 27%
228; 23%486; 36%
432; 43%
329; 24%
179; 13%

N = 1,001

80%

60%

40%

20%

0%

Nationally representative sample

Figure C.1 : Cycle Trip Frequency

The vast majority of respondents agreed that they would like to cycle more than they do now and that the provision of safe, connected and inviting cycle infrastructure would encourage them to do so.

9 As capture via market research, see Appendix D

National Cycle Network Plan - Appendices

Figure from page 118

Figure from page 118

100%

4% 1% 5%
5%
12%
89%
78%

80%

60%

40%

20%

0%

“I would like to cycle more than I do

“The provision of safe, connected and

now”.

inviting cycle infrastructure would encourage me and others to cycle

Figure C.2 : Desire to Cycle More and the NCN Plan Vision

Most respondents agreed that the proposed NCN succeeds in achieving the Plan’s objectives.

National Cycle Network Plan – Appendices

Figure from page 119

Figure from page 119

100%

Figure from page 119

Figure from page 119

80%

60%

40%

20%

0%

“The NCN will

“The NCN supports the development of

increase the number of cycle

connects cities

trips.”

cycling and walking culture in

Ireland.”

Figure C.3 : Proposed NCN and Plan Objectives

National Cycle Network Plan – Appendices

On the survey’s question concerning potential reasons to use the proposed network, 81% of respondents indicated their intention to use the NCN for recreational cycling followed by exercise with 66%. Utility trips to shops or friends and commuting to work / college were third and fourth respectively – see Figure C4.

Figure from page 120

Figure from page 120

Do you see yourself using the proposed National Cycle Network for any of the

following trip types?

81%

66% 63%

50% 46%

23%

10% 5%

Figure C.4 : Potential Future Use of NCN

While only 130 respondents (10%) selected the option of “I do not see myself using the proposed NCN” in the set of closed questions, 216 respondents (16%) provided a detailed response as to why they would or could not use it. Access to the NCN based on the respondent’s home location was the primary reason highlighted (46%). Safety related concerns were the second most popular answer, due to a perceived lack of segregated cycleways in many of the proposed corridors. Figure C.5 presents these responses.

Figure from page 120

Figure from page 120

4% 8% 3%

8%

46%

18%

13%

Figure C.5 : “If you do not see yourself using the proposed National Cycle Network – Why not?”

Question 8 requested feedback specifically on the SEA Environmental Report – these responses are incorporated in the SEA process. Question 7 of the feedback survey was available for respondents to provide a comment / submission regarding any element of the NCN.

The 889 responses to Question 7 (65% of all submissions) were categorised to better understand respondents’ feedback regarding the proposed NCN. As presented in the figure below, 39% of the comments concerned corridor selection, while 25% of comments related to safety and 18% related to

National Cycle Network Plan – Appendices

both accessibility and the implementation of the NCN Plan. These categories are examined in more detail below.

Figure from page 121

Figure from page 121

18%

39%

Figure C.6 : Categorisation of ‘Open’ Text Submissions

Corridor Selection

343 submissions included a reference to corridor selection. These submissions mainly included requests to extend the network to additional settlements or key destinations. The other two subcategories were related to recommending a new node or changing the alignment of a proposed route – see Figure C7. Appendix E provides a detailed analysis of recommendations received regarding the corridor selection.

Figure from page 121

Figure from page 121

10%

15%

69%

Figure C.7 : Corridor Selection Sub-Categories

Safety

224 submissions referenced safety issues. Segregation of cycle infrastructure was the main concern of these submissions - highlighting the preference for physically separating NCN routes from vehicular traffic to provide a safe cycle environment for everyone. The importance of educating cyclists and car drivers was also highlighted. High speeds and volumes of adjacent traffic were two factors identified as impacting cyclists’ safety.

National Cycle Network Plan – Appendices

Figure from page 122

Figure from page 122

4% 11%

54%

Figure C.8 : Safety Sub-Categories

Amenities and Accessibility

163 submissions reference amenities and accessibility issues. These included providing easy access to towns and key destinations, continuous routes at junctions and roundabouts (noting that there is not adequate current infrastructure along junctions for cyclists and drivers to safely travel), as well as access for people with disabilities and general access to cycles. These are presented in the figure below.

Figure from page 122

Figure from page 122

7% 5%

44%

19%

Figure C.9 : Amenities and Accessibility Sub-Categories

Implementation

159 submissions referenced the implementation of the NCN. 47% of these discussed incorporating and / or improving existing cycle and other linear infrastructure. Implementation timeline was raised by 26% of these submission and prioritisation of implementation by 19%. 8% discussed the involvement of different entities in the implementation of the NCN. These are presented in the figure below.

National Cycle Network Plan – Appendices

Figure from page 123

Figure from page 123

8%

19%

47%

Figure C.10 : Implementation Sub-Categories

C.7 Feedback on Proposed Corridors

Feedback received from the public consultation was analysed, as summarised below, and taken into consideration before a review and finalisation of the NCN.

National Cycle Network Plan – Appendices

Table C.2 : Proposed Changes on the NCN from Public Consultation

ReferenceCorridorCorridor NameNo. ofRationaleResponseWritten Submissions
IDSubmissions
1NAAthenry to Sligo125Conversion of the Western Railway Corridor from Athenry to Sligo into a dedicated cycle path would incorporate Athenry, a town with a current population of over 5,000, into the NCN and provide a more direct link to Sligo. The proposed NCN corridors overlap with the Western Railway Corridor at two sections: from Tuam to Claremorris and from Tubbercurry to Sligo. Many submissions voiced opinions in favour of extending the NCN along the remainder of the rail corridor south from Tuam to Athenry and north from Claremorris to Tubbercurry. The proposed advantage of using this corridor is that the right of way is already owned. Opposition to using the Western Railway Corridor as part of the NCN was also voiced in a smaller number of submissions, stating that it would prevent any future reopening of the railway for passenger / freight services.Inclusion of Athenry a valid concern for NCN – should be reconsidered as part of Galway-Athlone corridor option. Direct connection between Sligo and Athenry not a feasible link in and of itself – dependent on potential for greenway along Western Railway Corridor. Use of Western Railway Corridor not determined under NCN Plan, development of greenway using the facility could be determined under separate greenway project. Minor refinement to Galway- Athlone corridor to include Athenry – no adjustments required along proposed Galway-Sligo corridors.Wheels of Athenry (promotes inclusion of Athenry in network and highlights potential development of Western Railway Corridor for rail use) East Mayo Greenway Group (promotes converting the railway into cycle infrastructure, focusing on Charlestown to Claremorris) Galway Cycling Campaign (advocates for inclusion of Athenry on the NCN)
2NALee to Sea Greenway – Inniscarra Dam to30Incorporation of this proposed greenway which is within 2km of 157,000 people, serves almost 50,000 students and staff andMost of the proposed greenway falls under proposed NCN corridors around Cork City – with exception ofCork Transport and Mobility Forum, TIER Mobility UK & Ireland

National Cycle Network Plan – Appendices

ReferenceCorridorCorridor NameNo. ofRationaleResponseWritten Submissions
IDSubmissions
Crosshaven through Cork Citytertiary education centres and will connect business centres with recreational areasexisting infrastructure between Carrigaline and Crosshaven – no adjustment required to proposed NCN.
3NABandon to Bantry15Incorporates proposed greenway along existing abandoned railway to attract tourists and provide commuting option in West CorkProposed greenway assessed and advanced separately to NCN. Proposed greenway does not connect with any towns >5k population – and thus does not meet the core NCN requirement - no adjustment required to proposed NCN.
4NACarlow to Enniscorthy10Connects Bunclody and 60,000 residents along this coast to midlands corridor with the NCN, will encourage both tourism and daily commuting trips along the routeBunclody population <2k (2016 census), no other towns >1k along proposed route – no adjustment required to proposed NCN.
5NACahir to Cashel7Inclusion of a proposed greenway will provide a connection between tourist areas and will connect Cashel, a town of over 4,000 peopleProposed greenway assessed and advanced separately to NCN. Cashel <5k population (2016 census) and tourist destinations determined to not be NCN nodes in and of themselves – no adjustment required to proposed NCN.

National Cycle Network Plan – Appendices

ReferenceCorridorCorridor NameNo. ofRationaleResponseWritten Submissions
IDSubmissions
612AGalway to Castlebar6Cycle paths along this corridor without existing cycle infrastructure will encourage a modal shift for commuters in towns surrounding Galway with this alternate corridor option.NCN Corridor 12B performed better than 12A in Corridor Assessment, especially regarding connecting settlements, schools and sports facilities – no adjustment required to proposed NCN.Galway Cycling Campaign
7NAWestport to Leenane5Attractive for leisure cyclists, can make use of existing infrastructure to provide coastal accessLeenane population <1k (2016 census), tourist offering better suited to potential greenway network – no adjustment required to proposed NCN.Galway Cycling Campaign
8NARosslare to Waterford4Redesignating the current railway into a greenway by removing the rail infrastructure would provide a more direct connection through the southern areas of County Wexford. Opposition to the removal of the railway was also voiced.Potential use of existing rail corridor pending Irish Rail strategic review – no adjustment required to proposed NCN.
9NANaas to Carlow4NCN cycleway through this corridor would connect smaller towns (like Brannockstown and Grangecon) with insufficient public transport access to larger population centres.Both towns listed <1k population (2016 census) – no adjustment required to proposed NCN.
10NAClonmel to Thurles3Existing railways can be repurposed into a tourist connection between large population centres in County Tipperary through underserved midlands region.NCN connects secondary nodes to primary nodes (or to secondary nodes if that is the most appropriate link to the primary node). Suggested linkTipperary County Council

National Cycle Network Plan – Appendices

ReferenceCorridorCorridor NameNo. ofRationaleResponseWritten Submissions
IDSubmissions
better suited to county cycle network – no adjustment required to proposed NCN.
11NABelleek, Rossnowlagh and Bundoran with Ballyshannon3Proposed cycleways to connect County Donegal to Northern Ireland via local amenities to increase tourist and leisure activity in the region that aligns with NI Strategic Greenways proposal.NI Strategic Greenway will be integrated with the NCN – Sligo-Donegal corridor could be adjusted in future based on progress of suggested greenway; no adjustment required to proposed NCN at present.
12NAGreat Western Greenway2Inclusion of the Great Western Greenway will increase access to western parts of the country for tourists and residents alike, emphasising Irelands focus on environmental sustainability.Great Western Greenway already established and functioning successfully. No settlement >5k (2016 census) west of Westport along the greenway – no adjustment required to proposed NCN.
13NABuncrana to Inishowen2Incorporation of this proposed greenway would increase access to beginning of Wild Atlantic Way cycle route in an area underserved by public transport.Proposed greenway provides connection, no settlement >5k (2016 census) north of Buncrana – no adjustment required to proposed NCN.
14NATralee to Dingle2Current cycleway development lacks segregation and is therefore unsafe for cyclists.Tourist destination better suited to greenway solution – no adjustment required to proposed NCN.

National Cycle Network Plan – Appendices

ReferenceCorridorCorridor NameNo. ofRationaleResponseWritten Submissions
IDSubmissions
15NAAthenry to Loughrea2Existing railway corridor between these two population centres can be leveraged to create this connection for leisure and commuting trips. The proposed route would travel north from Loughrea on the existing rail corridor and then west to Athenry.Minor refinement required to Galway-Athlone corridor to include Athenry.
16NAMiddleton to Whitegate2Cycleway along the harbour would connect various existing cycleways, increasing accessibility in County Cork for tourist and leisure cyclists.Tourist destination better suited to greenway solution – no adjustment required to proposed NCN.
17NADublin to Blessington2Increases access to iconic cycle route, Wicklow Way, allowing for tourists and commuters a comfortable journey along a corridor currently without segregated cycleways.Blessington-Naas corridor included in proposed NCN which then connects onto Dublin. Direct Dublin- Blessington connection via Dodder Greenway included in proposed GDA network – no adjustment required to proposed NCN.
1856ATullamore to Portaloise2Proposed revision to provide more direct link between Portlaoise and Tullamore via Mountmellick increasing connectivity between rural regions and providing commuter access to cyclists in MountmellickNCN corridor 56B incorporates secondary nodes of Portarlington town and train station so is preferred route – no adjustment to proposed NCN.
19NATrim to Kilcock2Proposed revision to provide more direct link between Trim and Kilcock adding cycle infrastructure onto anTrim connected to Royal Canal Greenway via Ballynakill. Proposed GDA network

National Cycle Network Plan – Appendices

ReferenceCorridorCorridor NameNo. ofRationaleResponseWritten Submissions
IDSubmissions
already heavily used cycle corridor and increasing access to the Royal Canal Greenway in Kilcock.provides link from Trim to Kilcock – no adjustment required to proposed NCN.
20NAFarranfore to Caherciveen2Farranfore, a transportation hub, lacks connection to growing midsized towns in County Kerry.Proposed greenway covers rural connection – no adjustment required to proposed NCN.
21NAGalway to Spiddal2No details provided; suggested expansion of network.No settlement >5k (2016 census), better suited to county cycle network – no adjustment required to proposed NCN.Galway Cycling Campaign
22NAWexford to New Ross2Suggested as a contingency route for County Wexford if other routes are not feasible. Proposed to run alongside the N25.Proposed Wexford-New Ross corridor aligns with other regional corridors and reduces potential parallel / duplicate sections – no adjustment required to proposed NCN.Wexford Bicycle User Group, Cyclist.ie
23NANavan to Clonee2Proposed additional corridor connecting Navan more directly with Dublin via Clonee (rather than via Swords). No details provided; suggested expansion of network.Proposed GDA cycle network provides suggested link – no adjustment required to proposed NCN.Meath County Council, Navan Cycling Initiative
24NACarrickmacross to Longford1Network south of border deemed to be light, suggestion of increasing density by connecting Carrickmacross to Longford.Additional East / West route would connect Bailieborough (2.7k) and Ballyjamesduff (2.7k). Very long connection of secondary node to non- adjacent primary node – no

National Cycle Network Plan – Appendices

ReferenceCorridorCorridor NameNo. ofRationaleResponseWritten Submissions
IDSubmissions
adjustment required to proposed NCN.
25NABallybofey to Glenties1Access to central County Donegal can be increased by developing cycle path along this corridor’s abandoned railway.No settlements >1k (2016 census) connected – no adjustment required to proposed NCN.
2685ALongford to Cavan1Proposed revision to provide more direct link between Longford and Cavan by choosing this alternative corridor option, providing access to inland rural towns.While NCN corridor 85A is the most direct connection between the two nodes, it performed the poorest amongst the three options – no adjustment required to proposed NCN.
27NABoyle to Ballaghaderreen1No details provided; suggested expansion of network.Boyle is included on the Longford-Sligo corridor. Ballaghaderreen is settlement of approximately 2k (2016 census) with no other settlements >1k between it and Boyle – no adjustment required to proposed NCN.
28NAWaterford to Kerry via Mallow and Fermoy1No details provided; suggested expansion of network to include a planned greenway and extension west from Mallow.Proposed greenway connects Dungarven to Mallow (via Fermoy). All suggested connections are between secondary nodes. No primary node included – no adjustment required to proposed NCN.

National Cycle Network Plan – Appendices

ReferenceCorridorCorridor NameNo. ofRationaleResponseWritten Submissions
IDSubmissions
29NACarnew to Gorey1Provide safe cycle access to busy commuter corridor.Carnew town of approximately 1k (2016 census), connection to Gorey better aligned to county network – no adjustment required to proposed NCN.
3050AEnniscorthy to Wexford1Route option A on this corridor can use the existing Macmine rail line and wide shoulders on N11 for fully segregated cycleway.NCN corridor 50A scored well in the Options Assessment, but corridor 50B aligns with other corridors and reduces potential parallel / duplicate sections – no adjustment required to proposed NCN.Wexford Bicycle User Group
31NARoscrea to Birr1Connection between the heritage site of Birr and Roscrea would facilitate active transport and access to larger cities for residents along this corridor.Birr settlement of approximately 4.4k (2016 census), Roscrea included on NCN as a secondary node. Connection within 20km trip distance, but better aligned to county network – no adjustment required to proposed NCN.
3283BDrogheda to Dundalk1No details provided; suggested revision of network to alternative corridor option.NCN corridor 83B performed well in the Options Assessment, but the selected corridor 83C aligns with a GDA cycle network proposed coastal greenway project – no adjustment required to proposed NCN.

National Cycle Network Plan – Appendices

ReferenceCorridorCorridor NameNo. ofRationaleResponseWritten Submissions
IDSubmissions
3373BDublin to Naas1Existing roadway in poor condition resulting in cycle tire punctures.NCN corridor 73B performed well in the Options Assessment, but the selected corridor 73B aligns with the planned Grand Canal Greenway project. A parallel corridor via the Dodder Greenway is included in proposed GDA network – no adjustment required to proposed NCN.
34NAWicklow to Rathdrum1Cycleways along this corridor would increase interconnectivity between NCN and regional rail network through connection with Rathdrum train station on Connolly-Rosslare line.Rathdrum settlement of approximately 1.6k (2016 census), Wicklow included on NCN as a secondary node. Connection within 20km trip distance, but better aligned to county network – no adjustment required to proposed NCN.
35NAWicklow to Roundwood1Connections within Wicklow can increase cycle accessibility for tourists to various attractions.Roundwood settlement of <1k (2016 census), Wicklow included on NCN as a secondary node. Connection within 20km trip distance, but better aligned to county network – no adjustment required to proposed NCN.

National Cycle Network Plan – Appendices

ReferenceCorridorCorridor NameNo. ofRationaleResponseWritten Submissions
IDSubmissions
36NAWicklow to Laragh1Connections within Wicklow can increase cycle accessibility for tourists to various attractions.Laragh settlement of <1k (2016 census), Wicklow included on NCN as a secondary node. Connection within 20km trip distance, but better aligned to county network – no adjustment required to proposed NCN.
3713ACastlebar to Longford1Existing railway corridor can be leveraged to include Swinford into the NCN by choosing this alternative corridor option.NCN corridor 13B scored better than 13A in the Options Assessment, particularly regarding settlements. It also aligns better with other proposed corridors reducing duplicate infrastructure – no adjustment required to proposed NCN.
38NAIntegration with Liffey Tolka Project1Incorporation of these planned cycleways along Dublin Port will create more widespread access to the larger NCN network for cyclists in this area of the city and vice versa.Dublin Port included as secondary node on NCN. Integration with planned Tolka Project could be included as part of Connolly-Dublin Port corridor, but NCN would not incorporate entire route of proposed Liffey Tolka Project.Dublin Port Company

Appendix D

Market Research Findings

National Cycle Network Plan – Appendices

Findings and Insights from Response to Nationally Representative Survey

Question /FindingsInsights
Theme
Who Cycles? Those who cycle more are generally more confident cyclists  Those aged 55+ are over-represented in non- cyclists and those aged 35-44 are over- represented in Enthusiastic Cyclists  Female representation decreases with trip frequency  ABC1 socio-economic group10 is over- represented in Enthusiastic Cyclists  Those living in larger settlements tend to cycle more frequently  E-cycle ownership increases with frequency of trips, although Enthusiastic Cyclists are less likely than Daily Cyclists to own e-cycle (38% compared to 43%)  E-cycle owners tend to cycle more frequently, than non-motorised cycle owners  While the vast majority of respondents would like to cycle more (80%), desire to cycle aligns more with current cycling confidence level There is a large cohort of the population currently not cycling who want to cycle (approximately 20% of the general population)  The more confident a person is on a cycle, the more they want to cycle and the more frequently they cycle – increasing general cycling confidence should increase both the number of active cyclists and cycle trips  Campaigns to increase cycling may need to target differing needs of segments; women, those aged 55+ and more rural residents are all less likely to cycle
Where do they Cycle? While lower in rural areas, the majority of people own or have access to a cycle  Large town and small town residents show the highest desire to own / access a cycle  Respondents less likely to commute by cycle than take a trip by cycle for visiting, recreation or exercise  Most cyclists make trips of <5km, except for recreational (non-family) and exercise trips which are on average longer (54% and 53% respectively)  E-cycles increase the percentage of cyclists making 5-20km commuting trips, but not those making >20km trips. Cycle access / ownership programs might be beneficially targeted at rural and small town residents  More people cycle for recreational purposes than commuting purposes, although commuting trips may represent a large proportion of total trips  Longer distance trips (>10km) should cater more towards recreational and exercise use / preferences  Significant increase in >20km commutes potentially limited with increased adoption of e- cycles
Infrastructure Preferences Safety is the top factor influencing a person’s decision to make a trip by cycle  Enthusiastic Cyclists rank safety and security lower, but adjacent traffic volume and speed higher than other groups as well as the need to transport people / items  Women rank safety and security higher than men, but this decreases with age – “None of Even those with no confidence cycling in general feel some level of confidence, on average, on a greenway or cycleway  Providing safe segregated cycle infrastructure should increase general cycling confidence and be the

10 CSO classification to represent ‘Professional workers’

National Cycle Network Plan – Appendices

Question /FindingsInsights
Theme
the above” is top ranked in 55+ age group11. Men consistently rank safety and security as top factor, but similar to women “None of the above” also increases with age.  Segregated cycle infrastructure (greenways and cycle tracks) is preferred for >60% of respondents across all trip types. Regional / local roads and grey ways score highest for exercise use (7%).  The more frequently you cycle, the more confident a cyclist you are  Cycling confidence is impacted by infrastructure; average confidence on greenways and cycle tracks increases even for those with no confidence  Women are less confident cyclists than men across all age groups and appear to lose confidence with agepreferred option for most cyclists across all trip types  Safety should be the top priority for infrastructure design  Ingrained behaviour / preferences may limit change to cycling behaviour in older age groups
Route Preferences Most people are willing to divert commuting trips for segregated cycle infrastructure  Preference between using a regional road or national road (with cycle lane) is not clear cut, with exception of Enthusiastic Cyclists who strongly prefer using a regional road  More direct long-distance trips are slightly preferred in general (44% compared to 37%), with the exception of Enthusiastic Cyclists who have a strong preference for longer greenway routes (48% compared to (28%)  There is general agreement that pedestrians should share space with cyclists on greenways (53% agree, 27% disagree) Cyclists will take a longer route to use safer infrastructure  Enthusiastic Cyclists have preferences distinct to other cyclist segments, but are a small proportion of cyclists overall  Greenways should continue to facilitate both pedestrians and cyclists

11 The response options to the question “What factors influence your decision to make a trip by cycle?” were: i) Safety and Security, ii) Need to transport other people or items, iii) Bicycle parking at destination, iv) Landscape/ scenery, v) Adjacent traffic speed, vi) Adjacent traffic volume, vii) Gradient, viii) Number of junctions, ix) Other (option to specify), and x) None of the

Appendix E

Corridor Assessment

National Cycle Network Plan – Appendices

This Appendix outlines the Assessment Framework developed to determine the best performing Corridor, where multiple Corridor Options between two nodes had been identified.

It also includes a series of tables presenting the assessment of the corridor options considered for the NCN and a summary of the preferred corridor options.

E.1 Approach

Where multiple options for NCN Corridors had been identified, the performance of each option was determined by consideration against a range of assessment criteria as described below. The assessment of Corridor Options against these criteria was informed by a series of specific data sets.

NCN Plan ObjectivesNCN AssessmentData Set
Criteria
Increase the number of cycle trips by improving the provision of safe and attractive cycling infrastructure. Connect to strategic destinations outside of urban areas as appropriate (including centres of education, centres of employment, and leisure destinations).Commuter TripsDatabase of smaller settlements between the 1,000 and 5,000 population (Other Nodes)
School TripsData base of Primary and Secondary Schools - Developed by AECOM
Leisure TripsData base of leisure facilities – including sports clubs and off-road trails - Developed by AECOM
Promote the design of cycling infrastructure that meets safety requirements. Promote the design of cycling infrastructure that provides a safe and secure environment for all users.Potential Safety ImpactsNational Transport Models Road Network showing flows in the form of AADT, posted speed limits and average speeds.
Integrate with existing and proposed cycling infrastructure (including greenways, safe routes to schools, the EuroVelo network, Interreg projects), as appropriate Incorporate existing greenways, disused railways, canals, bypassed national roads, regional and local roads, long distance trails, as appropriate. Propose corridors to maximise the number of users. Future-proof cycle route capacity, taking account of population growth and additional demand from modal shift. Connect to strategic destinations outside of urban areas as appropriate (including centres of education, centres of employment, and leisure destinations).Integration with Existing Cycle InfrastructureDatabase of existing cycle infrastructure – including greenways, Blueway’s and Eurovelo routes – developed by AECOM
Integration with Planned Cycle InfrastructureDatabase of proposed cycle infrastructure – including greenways, Blueway’s and Eurovelo routes – developed by AECOM
Integration with Existing InfrastructureDatabase of disused railways developed by AECOM
Integration with transport modesDatabase of train stations - Developed by AECOM
Integration with Tourist AttractionsFáilte Ireland database of tourist attractions with visitor numbers <200k total visitors in 2019.
Scenery and Route AttractivenessESRI Basemap

National Cycle Network Plan – Appendices

NCN Plan ObjectivesNCN AssessmentData Set
Criteria
Enhance local environments and biodiversity where possible (e.g., pollinator plans, green corridors). Support the development of cycling and walking culture in Ireland.Impact on sensitive areasDatabase of Special Protection Areas, Special Areas of Conservations and Proposed National Heritage Areas / National Heritage Areas and architectural conservation areas – Developed by AECOM.
Connect to strategic destinations outside of urban areas (including transport hubs and tourist destinations), as appropriate.Social InclusionPobal deprivation index - Developed by AECOM
Integration with Smaller SettlementsDatabase of smaller settlements between the 1,000 and 5,000 population (Other Nodes)
GradientESRI Contour Maps

E.2 Assessment Methodology

Geospatial analysis of multiple datasets was central to the assessment of options. ArcGIS was used extensively to undertake the assessment of corridor options. A 2km buffer was applied from the centre line of indicative routes to give a 4km assessment zone along each of the NCN Corridors. Within these 4km corridors key assessment criteria as describe above were calculated to inform a multi criteria analysis of options.

The results of the geospatial analysis for each option were then manually compared against the other option(s) for the same corridor under each of the categories listed here – see Section E.3.

Demand

The NCN Plan aims to increase demand for cycling and walking by improving the provision of safe and attractive active travel infrastructure. Acting as a multifunctional network available for leisure users, tourists, and commuters.

Commuting Trips

The existing level of commuting demand was estimated for each Corridor Option based on populations in the area using the CSO settlements shapefile. The higher the population the higher the potential commuting demand for an option under consideration.

Leisure Trips

To assess how each Corridor Option promotes the use of active modes for leisure trips a database of leisure locations was compiled, containing the location of sporting clubs, off-road cycle trails and other leisure facilities. Corridor Options were then buffered12 in ArcGIS and intersected with leisure facility locations. The number of locations within the Corridor buffer was counted and compared across Corridor Options to highlight the best performing Option.

School Trips

A database of all primary and secondary school locations in the country was compiled and plotted in ArcGIS. Corridor Options were then buffered13 in ArcGIS either side of the Option and intersected with the location of schools. The number of schools within the Corridor Option buffer was counted and compared across Corridor Options to highlight the best performing Option.

12 2km buffer is applied in all areas 13 2km buffer is applied in all areas

National Cycle Network Plan – Appendices

Safety

The NCN Plan aims to deliver a cycle network which incorporates modern design principles and drives improvements in cycle safety nationally which is a central objective of the NCN Plan.

Potential Safety Impacts

To assess the potential safety impacts on Corridor Options the National Model Road Network was used to identify National Roads, the traffic flow on these roads in the form of Annual Average Daily Traffic (AADT), posted speed limits and average speed. Crossings of National Roads was also taken into account and compared across Corridor Options.

Integration

Corridor Options were assessed on how well they integrate with existing and planned transport infrastructure. The NCN will promote integration with local planning policies and integration in respect to land-use activities as well as other strategy proposals.

Integration with Existing Infrastructure

To assess how well Corridor Options integrate with existing infrastructure, a buffer was applied to the route corridors. This buffer zone was assessed against a database of existing Greenways, Blueways and Eurovelo routes, which was developed by AECOM. The number of connections and length overlapping with existing infrastructure were counted and compared against other route corridors to determine the level of integration with existing infrastructure provided by each option.

Integration with Planned Infrastructure

To assess how well Corridor Options integrate with proposed infrastructure a buffer was applied to the route corridors. This buffer zone was assessed against a database of planned Greenways, Blueway’s and Eurovelo routes, which was developed by AECOM. The number of connections and length overlapping with planned infrastructure was counted and compared against other route corridors to determine the level of integration with existing infrastructure provided by each option.

Integration with Other Existing Alignments

To assess how well Corridor Options integrate with proposed infrastructure a buffer was applied to the route corridors. This buffer zone was assessed against a database of historical rail routes, which was developed by AECOM. The number of connections and length overlapping were counted and compared against other route corridors to determine the level of integration with other existing alignments provided by each option.

Integration with Transport Modes

The proximity of cycle infrastructure to appropriate train stations can impact the level of demand and utilisation of the route being the only public transport mode that integrates with cycling. The proximity of a Corridor Option to appropriate train stations was assessed based on the number of train stations within the buffer. The number of stations was counted within a Corridor Option and ranked against other Options.

Integration with Tourist Attractions

There is a need to facilitate enhancements to access tourism facilities via active travel modes. The NCN Plan seeks to provide connections to priority tourist destinations where possible. This was assessed using a database of visitor attractions counting the number of attractions within the assessment corridor.

Scenery and Route Attractiveness

National Cycle Network Plan – Appendices

The NCN Plan seeks to provide aesthetically attractive routes for its users. Irelands landscape is rich and varied, with diverse lowland and upland, lake, river, and shore character areas. Enhanced active travel networks have the potential to support the enjoyment and understanding of Ireland’s diverse landscapes. This was assessed based on an option’s interaction with the natural environment and landscape.

Environment and Biodiversity

Corridor Options were assessed on how they potentially might impact the environment by considering how options impinge on designated and sensitive sites. To assess the impact on the natural and built environment a database of designated sites was compiled which included:

Special Protection Areas.

Special Areas of Conservation.

Proposed National Heritage Areas / National Heritage Areas.

Sensitive natural environmental sites.

Architectural conservation areas.

These sites were mapped in GIS to highlight areas of potential concern. The number of interactions per route corridor were then recorded and compared across corridor options to determine the performance of options with respect to their impact on sensitive areas.

Corridor Options were assessed under the Strategic Environmental Assessment (SEA) and Appropriate Assessment (AA) processes to determine the potential impacts of Corridor Options ensuring those with potentially significant negative impacts were not brought forward to the next step. The results of the SEA and AA can be reviewed in Appendix G, Appendix H and Appendix I. The results from the Strategic Environmental Assessment were a key consideration in the corridor selection process for the NCN Plan.

Accessibility and Social Inclusion

The NCN Plan promotes social inclusion for marginalised groups, interchange between transport modes and low gradient routes.

Social Inclusion

In order to assess the potential of Corridor Options to improve social inclusion, the Pobal HP Deprivation Index was used. To assess the impact, Corridor Options were plotted in ArcGIS and then intersected with the Pobal Deprivation Index. The number of connections with each area were counted and compared across Corridor Options.

Integration with Smaller Settlements

In developing Corridor Options emphasis was placed on making connections with existing settlements that fall below the population thresholds to be considered as Primary or Secondary Nodes. This was assessed using the CSO Settlements shapefile filtered to excluded settlements included as Primary or Secondary Nodes.

Gradient

Severe gradients have a negative impact on the likelihood of people switching to cycling. This element informed the scoring and ranking of Corridors in terms of their demand. Options were ranked based on their route through contour maps with the route with the least amount of gradient change being more favourable.

National Cycle Network Plan – Appendices

E.3 Scoring System

A 5-point Likert scale was used to analyse the different corridor options. The highest rank given showing major advantages compared to the other option(s) and the lowest rank given showing major disadvantages compared to other option(s). This is outlined below. The scores were assigned manually based on a review of the output from the GIS analysis of each option.

Major advantages over other option(s)2
Minor advantages over other option(s)1
Comparable to other option(s)0
Minor disadvantages over other-1
option(s)
Major disadvantages over other-2
option(s)

E.4 Assessment Summary

Following the analysis and options assessment outlined in the method above, the preferred corridor options are listed below. Full details of the assessment for each corridor are provided in Section E.5.

Figure from page 142

Figure from page 142

National Cycle Network Plan – Appendices

E.5 Assessment Details

Options assessments are detailed here. Specifically, the options were assessed based on estimated demand, safety, integration with existing and planned cycle infrastructure, environmental impacts, social inclusion, and connectivity to smaller settlements, transport modes and tourist attractions.

These options, which have been mapped below, explore different potential corridors for linking the nodes identified for the NCN. The tables presented below examine the differences between corridor options in relation to each of the criteria outlined in the previous chapter and utilise the scorings represented in the key below.

The Corridor Options were also assessed as part of the SEA to identify preferred corridors specifically from an environmental perspective – the results of this assessment are contained in the SEA Environmental Report.

Where the corridor options assessment detailed in this section identified a major advantage / disadvantage regarding the environmental category of sensitive areas, the findings of the SEA Environmental Report were integral to determining a distinct preferred option.

Maps:

The maps included in this section show specific sets of corridor options under assessment. Each map shows a certain section of the overall network and contains multiple corridors (which are referenced in the corresponding tables that follow) and the corridor options can be identified by:

Option A is outlined in red (–)

Option B is outlined in a dashed blue (–)

Option C (where applicable) is outlined in a dashed green (–)

Corridors with no options for assessment (and not detailed in this appendix) are marked with a thick blue line

National Cycle Network Plan – Appendices

Derry to Strabane

Figure from page 144

Figure from page 144

Sligo

Figure E.1 : Corridor Options 1-5

Table E.1: Derry to Strabane

Corridor 3 - Derry to StrabaneAB
Eastern OptionWestern Option
DemandCommuting Trips00
School Trips00
Leisure Trips00
SafetyPotential Safety Impacts00
IntegrationIntegration with existing cycle infrastructure00
Integration with planned cycling infrastructure2-2
Integration with other existing alignments2-2
Integration with transport modes00
Integration with Tourist Attractions00
Scenery and Route Attractiveness2-2
EnvironmentImpact on sensitive areas-22
Accessibility & Social inclusionSocial Inclusion00
Integration with Smaller Settlements00
Gradients00

National Cycle Network Plan – Appendices

The Derry to Strabane Corridor has two options. Option A or the Eastern Option diverges east at Upper Maymore crossing the Deele River at Ballindrait whereas Option B diverges west at Upper Maymore, following the River Foyle.

Option A is preferred due to its alignment with planned cycling infrastructure and other alignments, as well as route attractiveness.

Letterkenny to Strabane

Table E.2: Letterkenny to Strabane

Corridor 4 - Letterkenny to StrabaneAB
via Raphoevia Ballybofey
DemandCommuting Trips00
School Trips00
Leisure Trips00
SafetyPotential Safety Impacts00
IntegrationIntegration with existing cycle infrastructure00
Integration with planned cycling infrastructure00
Integration with other existing alignments00
Integration with transport modes00
Integration with Tourist Attractions00
Scenery and Route Attractiveness00
EnvironmentImpact on sensitive areas2-2
Accessibility & Social inclusionSocial Inclusion00
Integration with Smaller Settlements00
Gradients00

The Letterkenny to Strabane Corridor has two options, Option A via Raphoe and Option B via Ballybofey.

Option A is preferred due to its low interference with the River Finn SAC.

National Cycle Network Plan – Appendices

Figure from page 146

Figure from page 146

Ballina

Castlebar

Figure E.2 : Corridor Options 6-10

Longford to Sligo

Table E.3: Longford to Sligo

Corridor 8 - Longford to SligoAB
via Lough Arrow & Keyvia Lough Allen
DemandCommuting Trips-11
School Trips-11
Leisure Trips00
SafetyPotential Safety Impacts00
IntegrationIntegration with existing cycle infrastructure2-2
Integration with planned cycling infrastructure2-2
Integration with other existing alignments-11
Integration with transport modes1-1
Integration with Tourist Attractions00
Scenery and Route Attractiveness00
EnvironmentImpact on sensitive areas00
Accessibility & Social inclusionSocial Inclusion00
Integration with Smaller Settlements-11
Gradients00

The Longford to Sligo Corridor has two options. Option A via Lough Arrow and Lough Key and Option B via Lough Allen. The options split at Collooney and reconverge at Carrick-on-Shannon.

Option A is the preferred option due to its integration with the Collooney to Castlebaldwin Greenway along with the planned Lough Key to Carrick-On-Shannon Greenway.

National Cycle Network Plan – Appendices

Sligo to Ballina

Table E.4: Sligo to Ballina

Corridor 9 - Sligo to BallinaAB
via N59via Tobercurry
DemandCommuting Trips-22
School Trips1-1
Leisure Trips-11
SafetyPotential Safety Impacts-11
IntegrationIntegration with existing cycle infrastructure-22
Integration with planned cycling infrastructure00
Integration with other existing alignments-22
Integration with transport modes-11
Integration with Tourist Attractions1-1
Scenery and Route Attractiveness-11
EnvironmentImpact on sensitive areas1-1
Accessibility & Social inclusionSocial Inclusion1-1
Integration with Smaller Settlements-22
Gradients1-1

The Sligo to Ballina Corridor has two options. Option A via N59 and Option B via Tubbercurry.

Option B is the preferred option due to its integration with smaller settlements and the existing Bellaghy - Charlestown - Collooney Greenway to Tubbercurry..

Ballina to Castlebar

Table E.5: Ballina to Castlebar

Figure from page 147

Figure from page 147

The Ballina to Castlebar Corridor has three options, Option A via Foxford, Option B via Crossmolina and Option C via Foxford and the N58.

National Cycle Network Plan – Appendices

Option A is the preferred corridor option due to its integration with planned and existing cycling infrastructure.

Figure from page 148

Figure from page 148

Castlebar

Galway

Figure E.3 : Corridor Options 12-15

National Cycle Network Plan – Appendices

Galway to Castlebar

Table E.6: Galway to Castlebar

Corridor 12 - Galway to CastlebarAB
via N84via N17 (Galway / Castlebar)
DemandCommuting Trips00
School Trips-22
Leisure Trips-22
SafetyPotential Safety Impacts1-1
IntegrationIntegration with existing cycle infrastructure-11
Integration with planned cycling infrastructure00
Integration with other existing alignments-11
Integration with transport modes-11
Integration with Tourist Attractions-11
Scenery and Route Attractiveness00
EnvironmentImpact on sensitive areas00
Accessibility & Social inclusionSocial Inclusion00
Integration with Smaller Settlements00
Gradients00

The Galway to Castlebar Corridor has two options, Option A via N84 and Option B via N17.

Option B is the preferred option due to its integration with more schools and sports facilities through Tuam and Claremorris and the existing Western Rail Corridor Greenway.

National Cycle Network Plan – Appendices

Castlebar to Longford

Table E.7: Castlebar to Longford

Corridor 13 - Castlebar to LongfordAB
via N5via N60
DemandCommuting Trips-22
School Trips-11
Leisure Trips-22
SafetyPotential Safety Impacts1-1
IntegrationIntegration with existing cycle infrastructure00
Integration with planned cycling infrastructure00
Integration with other existing alignments00
Integration with transport modes-22
Integration with Tourist Attractions-22
Scenery and Route Attractiveness00
EnvironmentImpact on sensitive areas00
Accessibility & Social inclusionSocial Inclusion2-2
Integration with Smaller Settlements-22
Gradients00

Compared to other corridors, the two options for the Castlebar to Longford Corridor cover large and distinct areas. Option A takes a northern route through the settlements of Strokestown, Ballaghaderreen, Charlestown and Swinford (N5) while Option B takes a southern route through Roscommon, Castlerea, Ballyhaunis and Claremorris (N60).

Option B is the preferred corridor due to its integration with tourist attractions and transport hubs.

Roscommon to Longford

Table E.8: Roscommon to Longford

Corridor 14 - Roscommon to LongfordAB
via N60southern option
DemandCommuting Trips00
School Trips00
Leisure Trips00
SafetyPotential Safety Impacts-11
IntegrationIntegration with existing cycle infrastructure00
Integration with planned cycling infrastructure-22
Integration with other existing alignments00
Integration with transport modes00
Integration with Tourist Attractions00
Scenery and Route Attractiveness-22
EnvironmentImpact on sensitive areas1-1
Accessibility & Social inclusionSocial Inclusion1-1
Integration with Smaller Settlements00
Gradients00

The Roscommon to Longford Corridor has two options. Option A via N60 and Option B which extends south alongside Lough Ree.

Option B is the preferred option due to its scenery and the planned Lough Ree Greenway.

National Cycle Network Plan – Appendices

Roscommon to Athlone

Table E.9: Roscommon to Athlone

Corridor 15 - Roscommon to AthloneAB
west of N61east of N61
DemandCommuting Trips00
School Trips00
Leisure Trips-11
SafetyPotential Safety Impacts-11
IntegrationIntegration with existing cycle infrastructure00
Integration with planned cycling infrastructure-22
Integration with other existing alignments00
Integration with transport modes00
Integration with Tourist Attractions-11
Scenery and Route Attractiveness-22
EnvironmentImpact on sensitive areas-11
Accessibility & Social inclusionSocial Inclusion-11
Integration with Smaller Settlements00
Gradients00

The Roscommon to Athlone Corridor has two options. Option A lies west of the N61 while Option B lies east of the N61 alongside Lough Ree.

Option B is the preferred option due to its scenery and the planned Lough Ree Greenway - Athlone to Ballyleague / Lanesborough.

National Cycle Network Plan – Appendices

Figure from page 152

Figure from page 152

Longford

Athlone

Tullamore

Figure E.4 : Corridor Options 16-18

Athlone to Longford

Table E.10: Athlone to Longford

Corridor 16 - Athlone to LongfordAB
east of Lough Reewest of Lough Ree
DemandCommuting Trips00
School Trips2-2
Leisure Trips-11
SafetyPotential Safety Impacts-11
IntegrationIntegration with existing cycle infrastructure2-2
Integration with planned cycling infrastructure-22
Integration with other existing alignments00
Integration with transport modes00
Integration with Tourist Attractions00
Scenery and Route Attractiveness-22
EnvironmentImpact on sensitive areas00
Accessibility & Social inclusionSocial Inclusion00
Integration with Smaller Settlements00
Gradients00

The Athlone to Longford Corridor has two options, Option A, East of Lough Ree and Option B, West of Lough Ree.

Option B is the preferred corridor due to its scenery and integration with the Royal Canal Greenway.

National Cycle Network Plan – Appendices

Figure from page 153

Figure from page 153

Figure E.5: Corridor Options 19-25

Athlone to Tullamore

Table E.11: Athlone to Tullamore

Corridor 19 - Athlone to TullamoreAB
via Grand CanalNorthern Option
DemandCommuting Trips2-2
School Trips1-1
Leisure Trips00
SafetyPotential Safety Impacts1-1
IntegrationIntegration with existing cycle infrastructure2-2
Integration with planned cycling infrastructure2-2
Integration with other existing alignments00
Integration with transport modes00
Integration with Tourist Attractions00
Scenery and Route Attractiveness2-2
EnvironmentImpact on sensitive areas-22
Accessibility & Social inclusionSocial Inclusion00
Integration with Smaller Settlements2-2
Gradients00

Athlone to Tullamore has two options. Option A via the Royal Canal and Option B a more northern option.

Option A is the preferred corridor due to its integration with the Grand Canal greenway and further planned greenway infrastructure along its corridor.

National Cycle Network Plan – Appendices

Limerick to Portlaoise

Table E.12: Limerick to Portlaoise

Corridor 20 - Limerick to PortlaoiseAB
via Roscreavia Cloughjordan
DemandCommuting Trips-11
School Trips2-2
Leisure Trips1-1
SafetyPotential Safety Impacts00
IntegrationIntegration with existing cycle infrastructure00
Integration with planned cycling infrastructure00
Integration with other existing alignments00
Integration with transport modes00
Integration with Tourist Attractions00
Scenery and Route Attractiveness00
EnvironmentImpact on sensitive areas00
Accessibility & Social inclusionSocial Inclusion00
Integration with Smaller Settlements-11
Gradients00

The Limerick to Portlaoise Corridor has two options. Option A via Roscrea and Option B via Cloughjordan.

Option A is the preferred corridor due to serving more schools and leisure facilities through Roscrea.

National Cycle Network Plan – Appendices

Figure from page 155

Figure from page 155

Tralee

Killarney

Figure E.6: Corridor Options 26-28

Tralee to Limerick

Table E.13: Tralee to Limerick

Corridor 26 - Tralee to LimerickAB
via Adarenorth of N21
DemandCommuting Trips-11
School Trips00
Leisure Trips00
SafetyPotential Safety Impacts-11
IntegrationIntegration with existing cycle infrastructure00
Integration with planned cycling infrastructure00
Integration with other existing alignments-22
Integration with transport modes00
Integration with Tourist Attractions00
Scenery and Route Attractiveness-11
EnvironmentImpact on sensitive areas00
Accessibility & Social inclusionSocial Inclusion1-1
Integration with Smaller Settlements-11
Gradients00

The Tralee to Limerick corridor has two options. Option A via Adare and Option B north of the N21.

Option B is the preferred corridor due its integration with other alignments.

National Cycle Network Plan – Appendices

Cork to Tralee via Killarney

Table E.14: Cork to Tralee via Killarney

Corridor 28 - Cork to Tralee via KillarneyAB
north of N22via N22
DemandCommuting Trips1-1
School Trips-22
Leisure Trips1-1
SafetyPotential Safety Impacts00
IntegrationIntegration with existing cycle infrastructure00
Integration with planned cycling infrastructure00
Integration with other existing alignments-11
Integration with transport modes00
Integration with Tourist Attractions00
Scenery and Route Attractiveness00
EnvironmentImpact on sensitive areas00
Accessibility & Social inclusionSocial Inclusion00
Integration with Smaller Settlements1-1
Gradients00

The only difference between the two options for the Cork to Tralee via Killarney Corridor is the split at Cork City and the rejoining of the options near Macroom.

Option B is the preferred option due to its integration with schools.

National Cycle Network Plan – Appendices

Figure from page 157

Figure from page 157

Figure E.7: Corridor Options 29-36

Port of Cork to Carrigaline

Table E.15: Port of Cork to Carrigaline

Corridor 33 - Port of Cork to CarrigalineAB
via R613via Shanbally
DemandCommuting Trips00
School Trips-11
Leisure Trips-11
SafetyPotential Safety Impacts1-1
IntegrationIntegration with existing cycle infrastructure-22
Integration with planned cycling infrastructure-22
Integration with other existing alignments-22
Integration with Future Growth00
Integration with Smaller Settlements00
Tourism & RecreationIntegration with transport modes-11
Integration with Tourist Attractions-11
Scenery and Route Attractiveness00
EnvironmentImpact on sensitive areas00
Social InclusionSocial Inclusion00

The Port of Cork to Carrigaline Corridor has two options. Option A via R613 and Option B via Shanbally.

Option B is the preferred option due to alignment with the greenway around Fernhill, as well as further planned greenways in the area.

National Cycle Network Plan – Appendices

Figure from page 158

Figure from page 158

Limerick

Cork

Figure E.8: Corridor Options 35-40

Cork to Waterford

Table E.16: Cork to Waterford

Corridor 37 - Cork to WaterfordAB
via N25via R675
DemandCommuting Trips00
School Trips1-1
Leisure Trips1-1
SafetyPotential Safety Impacts-11
IntegrationIntegration with existing cycle infrastructure-22
Integration with planned cycling infrastructure-22
Integration with other existing alignments-22
Integration with transport modes00
Integration with Tourist Attractions00
Scenery and Route Attractiveness-11
EnvironmentImpact on sensitive areas1-1
Accessibility & Social inclusionSocial Inclusion00
Integration with Smaller Settlements00
Gradients00

The Cork to Waterford Corridor Options only differ as they meet Dungarvan where they diverge before converging again before Kilmacthomas. Option A carries north of Dungarvan via N25 while Option B follows the coastal path via R675.

Option B is the preferred option due to integration with the existing “Deise” Greenway and the planned Fáilte Ireland Greenway.

National Cycle Network Plan – Appendices

Cork to Fermoy

Table E.17: Cork to Fermoy

Corridor 38 - Cork to FermoyAB
via Carrignavarvia Watergrasshill
DemandCommuting Trips-11
School Trips-22
Leisure Trips-11
SafetyPotential Safety Impacts1-1
IntegrationIntegration with existing cycle infrastructure00
Integration with planned cycling infrastructure1-1
Integration with other existing alignments-22
Integration with transport modes00
Integration with Tourist Attractions00
Scenery and Route Attractiveness2-2
EnvironmentImpact on sensitive areas-11
Accessibility & Social inclusionSocial Inclusion1-1
Integration with Smaller Settlements-11
Gradients-22

The Cork to Fermoy corridor has two options, Option A via Carrignavar and Option B via Watergrasshill.

Option B is the preferred option due to its integration with the R639 and the number of facilities along its corridor.

Limerick to Cork

Table E.18: Limerick to Cork

Corridor 39 - Limerick to CorkAB
west of M7via R526
DemandCommuting Trips-11
School Trips00
Leisure Trips00
SafetyPotential Safety Impacts00
IntegrationIntegration with existing cycle infrastructure-11
Integration with planned cycling infrastructure2-2
Integration with other existing alignments2-2
Integration with transport modes00
Integration with Tourist Attractions1-1
Scenery and Route Attractiveness00
EnvironmentImpact on sensitive areas00
Accessibility & Social inclusionSocial Inclusion1-1
Integration with Smaller Settlements-11
Gradients00

The Limerick to Cork Corridor has two options, Option A west of the M7 and Option B via R526.

Option A is the preferred option due to The Great Southern Trail Greenway planned along its route.

National Cycle Network Plan – Appendices

Limerick to Waterford via Cahir

Table E.19: Limerick to Waterford via Cahir

Corridor 40 - Limerick to Waterford via CahirAB
via Carrick on Suirvia R670
DemandCommuting Trips1-1
School Trips2-2
Leisure Trips1-1
SafetyPotential Safety Impacts-11
IntegrationIntegration with existing cycle infrastructure-22
Integration with planned cycling infrastructure2-2
Integration with other existing alignments2-2
Integration with transport modes00
Integration with Tourist Attractions00
Scenery and Route Attractiveness1-1
EnvironmentImpact on sensitive areas-22
Accessibility & Social inclusionSocial Inclusion00
Integration with Smaller Settlements1-1
Gradients00

The Limerick to Waterford has two options, Option A via Carrick-on-Suir while Option B is via N24.

Option A is the preferred option due to its integration with a planned greenway along its corridor.

National Cycle Network Plan – Appendices

Figure from page 161

Figure from page 161

Kilkenny

Figure E.9: Corridor Options 43-54

Kilkenny to Waterford

Table E.20: Kilkenny to Waterford

Corridor 45 - Kilkenny to WaterfordAB
via N10 and R713via New Ross
DemandCommuting Trips-11
School Trips-11
Leisure Trips-11
SafetyPotential Safety Impacts-11
IntegrationIntegration with existing cycle infrastructure00
Integration with planned cycling infrastructure00
Integration with other existing alignments-22
Integration with transport modes-11
Integration with Tourist Attractions-11
Scenery and Route Attractiveness-11
EnvironmentImpact on sensitive areas00
Accessibility &Social Inclusion00
SocialIntegration with Smaller Settlements-11
inclusionGradients00

The Kilkenny to Waterford Corridor has two options. Option A via N10 and R713 and Option B via New Ross.

Option A is the preferred option due to its integration with the existing alignment on the New Ross Branch historical railway line which used to be the old Waterford line.

National Cycle Network Plan – Appendices

Enniscorthy to Waterford

Table E.21: Enniscorthy to Waterford

Corridor 47 - Enniscorthy to WaterfordAB
via N30via Ballywilliam
DemandDemand for Commuting Trips-11
School Trips00
Leisure Trips00
SafetyPotential Safety Impacts-11
IntegrationIntegration with existing cycle infrastructure00
Integration with planned cycling infrastructure00
Integration with other existing alignments-22
Integration with transport modes00
Integration with Tourist Attractions00
Scenery and Route Attractiveness-11
EnvironmentImpact on sensitive areas00
Accessibility & Social inclusionSocial Inclusion00
Integration with Smaller Settlements-11
Gradients00

The Enniscorthy to Waterford Corridor has two options, Option A via N30 and Option B via Ballywilliam.

Option B is the more preferred corridor due to its integration with more smaller settlements.

Enniscorthy to Wexford

Table E.22: Enniscorthy to Wexford

Figure from page 162

Figure from page 162

National Cycle Network Plan – Appendices

The Enniscorthy to Wexford Corridor has three options. Option A runs alongside the River Slaney and the N11, Option B follows a more westerly path via Killurin and crosses the River Slaney at Cornwall whereas Option C takes a steeper route via Castlebridge.

Option B is the preferred option due to integration with the Wexford to Waterford Corridor of the NCN and therefore also aligned with proposed infrastructure of the same project.

Enniscorthy to Wicklow via Arklow

Table E.23: Enniscorthy to Wicklow via Arklow

Corridor 51 - Enniscorthy to Wicklow via ArklowAB
via R750via coastline (Enniscorthy / Wicklow)
DemandCommuting Trips1-1
School Trips00
Leisure Trips-11
SafetyPotential Safety Impacts-11
IntegrationIntegration with existing cycle infrastructure00
Integration with planned cycling infrastructure2-2
Integration with other existing alignments00
Integration with transport modes00
Integration with Tourist Attractions00
Scenery and Route Attractiveness-11
EnvironmentImpact on sensitive areas2-2
Accessibility &Social Inclusion00
SocialIntegration with Smaller Settlements1-1
inclusionGradients00

Option A and Option B are the same except for the segment between Wicklow and Arklow.

Option A is the preferred option due to integration with more populous settlements along its route and the Fáilte Ireland proposed a greenway along its route.

National Cycle Network Plan – Appendices

Figure from page 164

Figure from page 164

Tullamore

Portlaoise

Figure E.10: Corridor Options 52-56

Wicklow to Bray via Greystones

Table E.24: Wicklow to Bray via Greystones

Figure from page 164

Figure from page 164

The Wicklow to Bray via Greystones corridor has three options, Option A via R761, Option B via the eastern coastline and Option C via M11.

Option B is the preferred option due to its coastal scenery and integration with a proposed greenway.

National Cycle Network Plan – Appendices

Bray to Dublin

Table E.25: Bray to Dublin

Corridor 53 - Bray to DublinAB
via Stillorganvia Dun Laoghaire
DemandCommuting Trips00
School Trips00
Leisure Trips-11
SafetyPotential Safety Impacts-11
IntegrationIntegration with existing cycle infrastructure-11
Integration with planned cycling infrastructure-11
Integration with other existing alignments-11
Integration with transport modes-22
Integration with Tourist Attractions00
Scenery and Route Attractiveness-22
EnvironmentImpact on sensitive areas2-2
Accessibility & Social inclusionSocial Inclusion00
Integration with Smaller Settlements00
Gradients2-2

The Bray to Dublin corridor has two options, Option A via Stillorgan and Option B via Dun Laoghaire.

Option B is the more preferred option due to already comprehensive cycling infrastructure along the Dun Laoghaire to Blackrock route, planned dedicated cycling infrastructure in Sandymount on the coast road and the DART running along the corridor leading to possible mode change.

Portlaoise to Carlow

Table E.26: Portlaoise to Carlow

Corridor 55 - Portlaoise to CarlowAB
via R445Via N80
DemandCommuting Trips00
School Trips00
Leisure Trips00
SafetyPotential Safety Impacts1-1
IntegrationIntegration with existing cycle infrastructure00
Integration with planned cycling infrastructure00
Integration with other existing alignments00
Integration with transport modes00
Integration with Tourist Attractions00
Scenery and Route Attractiveness1-1
EnvironmentImpact on sensitive areas00
Accessibility & Social inclusionSocial Inclusion00
Integration with Smaller Settlements00
Gradients00

The Portlaoise to Carlow Corridor has two options, Option A via R445 and Option B via N80.

National Cycle Network Plan – Appendices

Option A is the preferred corridor due to integrating with the R445 rather than the N80 in Option B.

Tullamore to Portlaoise

Table E.27: Tullamore to Portlaoise

Corridor 56 - Tullamore to PortlaoiseAB
via N80via Portarlington
DemandCommuting Trips2-2
School Trips-11
Leisure Trips-11
SafetyPotential Safety Impacts-11
IntegrationIntegration with existing cycle infrastructure-22
Integration with planned cycling infrastructure-22
Integration with other existing alignments2-2
Integration with transport modes-11
Integration with Tourist Attractions-11
Scenery and Route Attractiveness00
EnvironmentImpact on sensitive areas00
AccessibilitySocial Inclusion1-1
& SocialIntegration with Smaller Settlements2-2
inclusionGradients00

The Tullamore to Portlaoise Corridor has two options, Option A via N80 and Option B via Portarlington.

Option B is the preferred corridor due to aligning itself with the existing Grand Canal Greenway and the proposed Fáilte Ireland greenway along the rest of its route.

Figure from page 166

Figure from page 166

Athlone

Tullamore

Figure E.11 : Corridor Options 57

National Cycle Network Plan – Appendices

Mullingar to Tullamore

Table E.28: Mullingar to Tullamore

Corridor 57 - Mullingar to TullamoreAB
via N52via Ballycommon
DemandCommuting Trips-11
School Trips00
Leisure Trips00
SafetyPotential Safety Impacts00
IntegrationIntegration with existing cycle infrastructure-22
Integration with planned cycling infrastructure00
Integration with other existing alignments00
Integration with transport modes00
Integration with Tourist Attractions00
Scenery and Route Attractiveness-11
EnvironmentImpact on sensitive areas00
Accessibility & Social inclusionSocial Inclusion00
Integration with Smaller Settlements-11
Gradients00

The Mullingar to Tullamore Corridor has two options, Option A via N52 and Option B via Ballycommon.

Option B is the more preferred corridor due integration with the existing Grand Canal Greenway.

Figure from page 167

Figure from page 167

Portlaoise

Figure E.12 : Corridor Options 58-60

National Cycle Network Plan – Appendices

Portlaoise to Naas

Table E.29: Portlaoise to Naas

Corridor 59 - Portlaoise to NaasAB
via Kildare & Newbridgevia Rathangan & Sallins
DemandCommuting Trips-22
School Trips1-1
Leisure Trips1-1
SafetyPotential Safety Impacts-11
IntegrationIntegration with existing cycle infrastructure-22
Integration with planned cycling infrastructure1-1
Integration with other existing alignments00
Integration with transport modes1-1
Integration with Tourist Attractions1-1
Scenery and Route Attractiveness00
EnvironmeImpact on sensitive areas-11
nt
AccessibiliSocial Inclusion-11
ty & SocialIntegration with Smaller Settlements-22
inclusionGradients00

The Portlaoise to Naas corridor has two options, Option A via Kildare & Newbridge and Option B via Rathangan & Sallins.

Option A is via Kildare which is a secondary node so it must be included in the network.

Portlaoise to Newbridge

Table E.30: Portlaoise to Newbridge

Corridor 60 - Portlaoise to NewbridgeAB
via Kildarevia Rathangan
DemandCommuting Trips-22
School Trips1-1
Leisure Trips00
SafetyPotential Safety Impacts-11
IntegrationIntegration with existing cycle infrastructure00
Integration with planned cycling infrastructure-22
Integration with other existing alignments00
Integration with transport modes1-1
Integration with Tourist Attractions1-1
Scenery and Route Attractiveness-22
EnvironmentImpact on sensitive areas00
Accessibility & Social inclusionSocial Inclusion00
Integration with Smaller Settlements-22
Gradients00

The Portlaoise to Newbridge Corridor has two options, Option A via Kildare and Option B via Rathangan.

Option A is via Kildare which is a secondary node so it must be included in the network.

National Cycle Network Plan – Appendices

Figure from page 169

Figure from page 169

Mullingar

Edenderry

Figure E.13 : Corridor Options 61-64

Mullingar to Edenderry

Table E.31: Mullingar to Edenderry

Corridor 64 - Mullingar to EdenderryAB
south of M4via Royal Canal Greenway
DemandCommuting Trips-22
School Trips-22
Leisure Trips-22
SafetyPotential Safety Impacts-22
IntegrationIntegration with existing cycle infrastructure-22
Integration with planned cycling infrastructure-22
Integration with other existing alignments00
Integration with transport modes00
Integration with Tourist Attractions-11
Scenery and Route Attractiveness-22
EnvironmenImpact on sensitive areas-11
t
AccessibilitSocial Inclusion2-2
y & SocialIntegration with Smaller Settlements-22
inclusionGradients00

The Mullingar to Edenderry corridor has two options, Option A south of M4 and Option B via Royal Greenway.

Option B is the preferred option due to its facilitation in the planned greenway link between the Royal and Grand Canal Greenways.

National Cycle Network Plan – Appendices

Figure from page 170

Figure from page 170

Figure E.14 : Corridor Options 65-66

Navan to Mullingar

Table E.32: Navan to Mullingar

Corridor 66 - Navan to MullingarAB
via Delvinvia Trim
DemandCommuting Trips1-1
School Trips-11
Leisure Trips-11
SafetyPotential Safety Impacts-11
IntegrationIntegration with existing cycle infrastructure-22
Integration with planned cycling infrastructure-22
Integration with other existing alignments00
Integration with transport modes00
Integration with Tourist Attractions-22
Scenery and Route Attractiveness00
EnvironmentImpact on sensitive areas2-2
Accessibility & Social inclusionSocial Inclusion1-1
Integration with Smaller Settlements1-1
Gradients00

National Cycle Network Plan – Appendices

The Navan to Mullingar Corridor has two options, Option A via Delvin and Option B via Trim.

Option B is the preferred option due to Fáilte Ireland’s proposed greenways and integration with the Royal Canal Greenway along its route.

Figure from page 171

Figure from page 171

Figure E.15 : Corridor Options 73-74

Naas to Dublin

Table E.33: Naas to Dublin

Corridor 73 - Naas to DublinAB
via Clondalkinvia Tallaght
DemandCommuting Trips-11
School Trips-11
Leisure Trips-11
SafetyPotential Safety Impacts-11
IntegrationIntegration with existing cycle infrastructure2-2
Integration with planned cycling infrastructure00
Integration with other existing alignments2-2
Integration with transport modes1-1
Integration with Tourist Attractions-11
Scenery and Route Attractiveness2-2
EnvironmentImpact on sensitive areas00
AccessibilitySocial Inclusion1-1
& SocialIntegration with Smaller Settlements-11
inclusionGradients00

The Naas to Dublin corridor has two options, Option A via Clondalkin and Option B via Tallaght.

Option A is the preferred corridor due to its integration with the Grand Canal Greenway.

National Cycle Network Plan – Appendices

Celbridge to Dublin

Table E.34: Celbridge to Dublin

Corridor 74 - Celbridge to DublinAB
via Grand Canalvia Tallaght
DemandCommuting Trips-22
School Trips-22
Leisure Trips-11
SafetyPotential Safety Impacts2-2
IntegrationIntegration with existing cycle infrastructure2-2
Integration with planned cycling infrastructure2-2
Integration with other existing alignments00
Integration with transport modes2-2
Integration with Tourist Attractions-11
Scenery and Route Attractiveness2-2
EnvironmentImpact on sensitive areas00
AccessibilitySocial Inclusion1-1
& SocialIntegration with Smaller Settlements-22
inclusionGradients00

The Celbridge to Dublin Corridor has two options, Option A via the Grand Canal and Option B via Tallaght.

Option A is the preferred corridor due to its integration with the Grand Canal Greenway.

National Cycle Network Plan – Appendices

Figure from page 173

Figure from page 173

Navan

Figure E.16 : Corridor Options 76-82

Swords to Dublin

Table E.35: Swords to Dublin

Figure from page 173

Figure from page 173

The Swords to Dublin corridor has three options, Option A via R132, Option B via R107 and Option C via R135.

Option B is the preferred corridor due to its integration with the DART line.

National Cycle Network Plan – Appendices

Navan to Swords

Table E.36: Navan to Swords

Corridor 79 - Navan to SwordsAB
via Ratoathvia N2
DemandCommuting Trips2-2
School Trips1-1
Leisure Trips1-1
SafetyPotential Safety Impacts00
IntegrationIntegration with existing cycle infrastructure00
Integration with planned cycling infrastructure00
Integration with other existing alignments00
Integration with transport modes00
Integration with Tourist Attractions-11
Scenery and Route Attractiveness1-1
EnvironmentImpact on sensitive areas-11
Accessibility & Social inclusionSocial Inclusion00
Integration with Smaller Settlements2-2
Gradients00

The Navan to Swords Corridor has two options, Option A via Ratoath and Option B via N2.

Option A is the preferred corridor due to serving local communities with more schools and sports facilities along its route.

Balbriggan to Swords

Table E.37: Balbriggan to Swords

Corridor 80 - Balbriggan to SwordsAB
via R132via coastline
DemandCommuting Trips-22
School Trips-22
Leisure Trips-22
SafetyPotential Safety Impacts-22
IntegrationIntegration with existing cycle infrastructure00
Integration with planned cycling infrastructure-11
Integration with other existing alignments1-1
Integration with transport modes-22
Integration with Tourist Attractions-22
Scenery and Route Attractiveness-22
EnvironmentImpact on sensitive areas2-2
Accessibility & Social inclusionSocial Inclusion1-1
Integration with Smaller Settlements-22
Gradients00

The Balbriggan to Swords Corridor has two options, Option A via R132 and Option B via the coastline.

Option B is the preferred option due to its higher population catchment and coastal route.

National Cycle Network Plan – Appendices

Drogheda to Balbriggan

Table E.38: Drogheda to Balbriggan

Corridor 81 - Drogheda to BalbrigganAB
via R132via coastline
DemandCommuting Trips2-2
School Trips-11
Leisure Trips1-1
SafetyPotential Safety Impacts-11
IntegrationIntegration with existing cycle infrastructure00
Integration with planned cycling infrastructure-11
Integration with other existing alignments1-1
Integration with transport modes00
Integration with Tourist Attractions-11
Scenery and Route Attractiveness-22
EnvironmentImpact on sensitive areas2-2
Accessibility & Social inclusionSocial Inclusion00
Integration with Smaller Settlements2-2
Gradients00

The Drogheda to Balbriggan Corridor has two options, Option A via R132 and Option B via the coastline.

Option B is the preferred option due to its scenery via the eastern coastline.

Navan to Drogheda

Table E.39: Navan to Drogheda

Figure from page 175

Figure from page 175

The Navan to Drogheda Corridor has three Options. Option A along Boyne River, Option B via Duleek and Option C via L1600.

Option A is the preferred option due to its integration with the existing greenway and planned TII Boyne Greenway and Navigation Scheme.

National Cycle Network Plan – Appendices

Figure from page 176

Figure from page 176

Cavan

Longford

Figure E.17 : Corridor Options 83-90

Dundalk to Drogheda

Table E.40: Dundalk to Drogheda

Figure from page 176

Figure from page 176

Option A and C are similar corridors along the east coast of Ireland whereas Option B is an inland corridor via Ardee.

Option C is the preferred option due to it passing through numerous beaches and coastal destinations along its cycleway.

National Cycle Network Plan – Appendices

Cavan to Navan via Kells

Table E.41: Cavan to Navan via Kells

Corridor 84 - Cavan to Navan via KellsAB
via Mullaghvia N3
DemandCommuting Trips2-2
School Trips00
Leisure Trips00
SafetyPotential Safety Impacts1-1
IntegrationIntegration with existing cycle infrastructure00
Integration with planned cycling infrastructure00
Integration with other existing alignments-11
Integration with transport modes00
Integration with Tourist Attractions00
Scenery and Route Attractiveness1-1
EnvironmentImpact on sensitive areas1-1
Accessibility & Social inclusionSocial Inclusion00
Integration with Smaller Settlements2-2
Gradients00

As the two options go through a similar area and only diverge for a short distance, there is relatively little difference between Options A, via Mullagh and B, via N3.

Option A is the preferred option due to its high population catchment along its route.

Longford to Cavan

Table E.42: Longford to Cavan

Figure from page 177

Figure from page 177

The Longford to Cavan Corridor has three options. Option A via Gowna, Option B via Granard and Option C via N4.

Option C is the preferred option due to its integration with local communities.

National Cycle Network Plan – Appendices

Newry to Dundalk

Table E.43: Newry to Dundalk

Corridor 90 - Newry to DundalkAB
via N1via Carlingford
DemandCommuting Trips-22
School Trips-11
Leisure Trips-11
SafetyPotential Safety Impacts-11
IntegrationIntegration with existing cycle infrastructure-11
Integration with planned cycling infrastructure-22
Integration with other existing alignments00
Integration with transport modes1-1
Integration with Tourist Attractions-22
Scenery and Route Attractiveness-22
EnvironmentImpact on sensitive areas2-2
Accessibility & Social inclusionSocial Inclusion1-1
Integration with Smaller Settlements-22
Gradients00

The Newry to Dundalk corridor has two options, Option A via N1 and Option B, via Carlingford.

Option B is the preferred option due to its existing alignments, scenery and route attractiveness.

Appendix F

SEA Screening Report

National Cycle Network Plan

Figure from page 180

Figure from page 180

Strategic Environmental Assessment (SEA) Screening Report

November 2021

National Cycle Network (NCN) Plan Strategic Environmental Assessment (SEA)

Screening Report

Quality information

Prepared by Checked by Verified by Approved by

Nick Chisholm-Batten Associate Director

Alastair Peattie Associate Director

Ben Green Associate Director

Ben Green Associate Director

Revision History

Revision Revision date Details Authorized Name Position

12th November Draft for client V2.0 2021 comment

12th November Nick Chisholm- 2021 Batten

Associate Director

Prepared for:

Transport Infrastructure Ireland

Prepared by:

AECOM Ireland Limited 4th Floor Adelphi Plaza Georges Street Upper Dun Laoghaire Co. Dublin A96 T927 Ireland T: +353 1 238 3100 aecom.com

© 2021 AECOM Ireland Limited. All Rights Reserved.

This document has been prepared by AECOM Ireland Limited (“AECOM”) for sole use of our client (the “Client”) in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AECOM and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AECOM, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AECOM.

AECOM

National Cycle Network (NCN) Plan Strategic Environmental Assessment (SEA)

Screening Report

Table of Contents

  1. Introduction … 1 Purpose of this SEA Screening Report … 1 Strategic Environmental Assessment and screening … 1 Structure of this SEA Screening Report… 1 2. Overview of the National Cycle Network Plan … 2 The National Cycle Network Plan … 2 Scope / geographical coverage of the NCN Plan … 2 Wider policy framework associated with the NCN Plan… 4 Key environmental constraints potentially affected by the NCN Plan … 4 3. Screening determination … 5 Screening criteria… 5 Screening assessment … 6 4. Summary and conclusions … 8 Legislative, regulatory or administrative provisions … 8 Setting the framework for plans and projects … 8 Conclusions … 9

AECOM

Strategic Environmental Assessment (SEA)

Screening Report

AECOM

National Cycle Network (NCN) Plan Strategic Environmental Assessment (SEA)

Screening Report

1. Introduction

Purpose of this SEA Screening Report

1.1 This Strategic Environmental Assessment (SEA) Screening Report has been prepared in relation to the National Cycle Network Plan by AECOM.

1.2 The purpose of the Screening Report is to set out a screening opinion with regards to whether a full SEA process is required to accompany the development of the National Cycle Network Plan. The screening opinion is to be presented to the statutory consultation bodies for SEA, the Environmental Protection Agency (EPA) and the Minister for the Environment, Climate and Communications for their comment.

Strategic Environmental Assessment and screening

1.3 Directive 2001/42/EC ‘The SEA Directive’ requires certain plans and programmes to undergo a SEA process. An SEA is the formal, systematic evaluation of the likely significant environmental effects of implementing a plan or programme, or variation to a plan or programme before a decision is made to adopt it.

1.4 The requirement for SEA in Ireland was introduced by European Communities (Environmental Assessment of Certain Plans and Programmes) Regulations 2004 (S.I. 435 of 2004) and The Planning and Development Strategic Environmental Assessment (SEA) Regulations 2004 (S.I. 436 of 2004). These Regulations have since been amended by the European Communities (Environmental Assessment of Certain Plans and Programmes) (Amendment) Regulations 2011 (S.I. No. 200 of 2011) and the Planning and Development (SEA) (Amendment) Regulations 2011 (S.I. No. 201 of 2011). These transposed the SEA Directive into Irish law.

1.5 Section 9 (4) of SI No. 435/2004 requires the screening of individual plans or programmes, based on the criteria in Schedule 1 of the SEA Regulations, which will support a determination as to whether or not significant effects on the environment would be likely to arise.

Structure of this SEA Screening Report

1.6 This Screening Report provides a screening opinion as to whether the National Cycle Network Plan is likely to lead to significant environment effects, and as such requires an SEA process. In this context it presents the following:

Details and context of the National Cycle Network Plan, including its scope and likely content, its relationship with national, regional and local plans and strategies and the key environmental constraints in the vicinity of the areas affected by the National Cycle Network Plan (Chapter 2)

A discussion of the potential significant environmental effects of the National Cycle Network Plan and their significance (Chapter 3); and

A summary of the screening opinion (Chapter 4).

AECOM

National Cycle Network (NCN) Plan Strategic Environmental Assessment (SEA)

Screening Report

2. Overview of the National Cycle Network Plan

The National Cycle Network Plan

2.1 Transport Infrastructure Ireland (TII) are currently working with key stakeholders to prepare a new National Cycle Network (NCN) Plan. This will map existing cycling infrastructure and identify gaps where future investment could be focused in order to establish a comprehensive and connected cycling network around Ireland.

2.2 The NCN Plan will focus on the inter-urban network with a priority on connectivity between urban areas of 5,000+ population, as well as to strategic destinations outside of urban areas (including transport hubs, centres of education, centres of employment, leisure destinations, and tourist destinations). It will aim to maximise the number of users and encourage modal shift. Where possible, the network will also optimise the potential for daily activities via active travel (e.g. school and work commutes) and integrate with existing and proposed active travel infrastructure.

2.3 The plan continues the previous work of TII’s National Cycle Network Scoping Study (2010) which proposed a high-level route corridor connecting urban centres of 10,000+ population. It also aligns with the ongoing work of the National Transport Authority (NTA) in developing urban cycle networks in areas of 5,000+ population. As such, the NCN Plan aims to compliment the various active travel infrastructure projects currently under development, and in planning, by providing a core spine that other networks and routes can connect to and expand upon.

2.4 The vision for the NCN Plan is as follows:

Develop a safe, connected, and inviting cycle network between urban areas and key destinations to achieve accessible, sustainable, and high-quality routes that will help to reduce the carbon impact of transport and promote a healthy and inclusive society.

Scope / geographical coverage of the NCN Plan

2.5 The NCN Plan will set out a proposed national cycle network connecting settlements with 5,000 inhabitants or more along identified corridors (Figure 2.1). It will also seek to connect key strategic destinations, (e.g. top tourist attractions, transport hubs, centres of education, centres of employment and others).

2.6 The likely corridors identified through the NCN Plan will mainly cover non-urban areas. This is given urban cycle networks are being covered by work currently being undertaken by the NTA.

2.7 Whilst the NCN Plan will not include specific or detailed routes, it will identify broad corridors through which interventions should be targeted. These identified corridors will be accompanied by recommendations relating to the level of infrastructure required along specific corridors or sections of corridor (e.g. segregated cycle path).

AECOM

National Cycle Network (NCN) Plan Strategic Environmental Assessment (SEA)

Screening Report

Figure 2.1: Settlements of over 5,000 inhabitants in the Republic of Ireland

Figure 2.1: Settlements of over 5,000 inhabitants in the Republic of Ireland

AECOM

National Cycle Network (NCN) Plan Strategic Environmental Assessment (SEA)

Screening Report

Wider policy framework associated with the NCN Plan

2.8 The National Development Plan 2021-2030 highlights that the NCN Plan will provide a framework for a comprehensive and connecting cycling network and serve to inform future planning and project delivery decisions in relation to walking and cycling infrastructure. In this respect the National Development Plan highlights that it will be a valuable resource in relation to active travel connectivity around Ireland.

2.9 The NCN Plan is also being prepared in close conjunction with the NTA’s various initiatives on local cycle networks and in association with the provisions of the following:

National Planning Framework (NPF);

Common Appraisal Framework (CAF);

National Investment Framework for Transportation in Ireland (NIFTI);

Regional Spatial and Economic Strategies (RSES);

Road Safety Standards (RSS);

Safe Routes to School (SRTS); and

Public Spending Code (PSC).

2.10 The NCN Plan is not specifically required by legislative, regulatory or administrative provisions. It is however being progressed as a key component of the development of a National Cycle Network in Ireland.

Key environmental constraints potentially affected by the NCN Plan