4.6 Develop a comprehensive package of
11
| Strategic Goal A: To provide a framework that ensures a sustainable housing system in Ireland with a supply of good quality | |||||||||||
| housing to match the needs of all our people | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| 5.3 Support local authorities to provide | Increased numbers of individuals accessing Housing First Increased numbers of households prevented from entering emergency accommodation Reduction in time spent in emergency accommodation | Number of individuals supported in Housing First Number of households prevented from entering emergency accommodation Numbers of adults and children exiting homelessness | |||||||||
| emergency accommodation to ensure | |||||||||||
| that there is sufficient high quality | |||||||||||
| emergency accommodation available to | |||||||||||
| households experiencing | |||||||||||
| homelessness | |||||||||||
| 5.4 Support delivery of the Housing First | |||||||||||
| Programme to increase the numbers of | |||||||||||
| homeless individuals accessing a | |||||||||||
| Housing First tenancy | |||||||||||
| 5.5 Increase homeless prevention | |||||||||||
| measures | |||||||||||
| 5.6 Support local authorities to introduce | |||||||||||
| measures to reduce the number of | |||||||||||
| households spending extended periods | |||||||||||
| of time in emergency circumstances | |||||||||||
| 6. Support the Delivery of High Quality Homes | 6.1 Develop the necessary regulatory and | Development of sustainable | Publication of regulations to implement Articles of EPBD as appropriate | ||||||||
| control systems including commitments | housing | ||||||||||
| under EU green deal objectives | |||||||||||
| Implementation of national | |||||||||||
| 6.2 Implement the Energy Performance of | regulations and strategies to | ||||||||||
| Buildings Directive (EPBD) | comply with the EPBD |
12
| Strategic Goal A: To provide a framework that ensures a sustainable housing system in Ireland with a supply of good quality | |||||||||||
| housing to match the needs of all our people | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| 6.3 Establish a Building Standards Regulator 6.4 Ongoing review of Building Regulations 6.5 Support the development of the statutory Construction Industry Register Ireland (CIRI) 6.6 Manage Building Control Act 2007 and Construction Professionals Registers 6.7 Enact legislation to establish scheme to remediate fire safety, water ingress and structural defects in apartments and duplexes 6.8 Implement the Enhanced Defective Concrete Blocks (DCB) Grant Scheme in the counties of Donegal, Mayo, Limerick and Clare 6.9 Oversight of Pyrite Resolution Board and Pyrite Remediation Scheme 6.10 Engage with all stakeholders to oversee, drive and support a co- ordinated approach to addressing | Strengthened oversight of compliance with building regulations and standards Building Regulations Advisory Body re-established Effective Implementation of EU Construction Products Regulation Mandatory registration for builders commenced Scheme to remediate fire safety, water ingress and structural defects in apartments and duplexes established Effective oversight of the Pyrite Resolution Board and the Pyrite Remediation Scheme Oversight and reporting on the implementation of vacancy related objectives and actions in the Vacant Homes Action | Legislation to establish a | |||||||||
| Building Standards | |||||||||||
| Regulator developed | |||||||||||
| Building Regulations | |||||||||||
| Advisory Body | |||||||||||
| established by 2025 | |||||||||||
| Number of building | |||||||||||
| professionals on the | |||||||||||
| Register | |||||||||||
| Primary legislation to | |||||||||||
| remediate defects in | |||||||||||
| apartments and duplexes | |||||||||||
| enacted | |||||||||||
| A revised Part B of the | |||||||||||
| Building Regulations and | |||||||||||
| associated Technical | |||||||||||
| Guidance Document | |||||||||||
| published | |||||||||||
| Number of homes | |||||||||||
| remediated for Defective | |||||||||||
| Concrete Blocks (DCB) | |||||||||||
| under the Enhanced |
13
| Strategic Goal A: To provide a framework that ensures a sustainable housing system in Ireland with a supply of good quality | |||||||||||
| housing to match the needs of all our people | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| vacancy and ensuring houses already built are being fully used 6.11 Work closely with the Department of Enterprise Trade and Employment (DETE), and the Department of Further and Higher Education, Research, Innovation and Science (DFHERIS) to support innovation and Modern Methods of Construction | Plan, and the capturing of and reporting on vacancy data Establishment of the National Demonstration Park for Modern Methods of Construction by DFHERIS, the Construct Innovate technology research centre and a Public Procurement Roadmap for Modern Methods of Construction (MMC) Increased Awareness and use of Modern Methods of Construction in Housing delivery | Grant Scheme for the | |||||||||
| Remediation of Dwellings | |||||||||||
| Damaged by the Use of | |||||||||||
| Defective Concrete | |||||||||||
| Blocks in their | |||||||||||
| Construction | |||||||||||
| Number of homes | |||||||||||
| remediated for pyrite | |||||||||||
| Actions and targets in the | |||||||||||
| Vacant Homes Action | |||||||||||
| Plan are delivered | |||||||||||
| Number of homes | |||||||||||
| constructed using Modern | |||||||||||
| Methods of Construction | |||||||||||
| and increased productivity | |||||||||||
| across all housing | |||||||||||
| delivery | |||||||||||
| 7. Support local | 7.1 Implement a planned maintenance approach to housing stock within local authorities | Completion of regeneration and projects | Number of houses brought to required standard each year | ||||||||
| authorities with a | |||||||||||
| range of schemes | |||||||||||
| and initiatives aimed | |||||||||||
| at improving the |
14
| Strategic Goal A: To provide a framework that ensures a sustainable housing system in Ireland with a supply of good quality | |||||||||||
| housing to match the needs of all our people | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| quality, safety, efficiency and general maintenance of quality housing stock | 7.2 Ensure that the current Department | Introduction of improved stock management system for social housing Development of a roadmap for retrofitted local authority social housing stock to achieve BER of B2/cost optimal performance by 2030 | Number of home grants provided Number of homes completed under regeneration projects Number of local authority homes completed under the National Retrofit Programme | ||||||||
| stock improvement funding models | |||||||||||
| support the planned maintenance | |||||||||||
| approach | |||||||||||
| 7.3 Continue to implement minimum | |||||||||||
| Building Energy Rating (BER) | |||||||||||
| standards for retrofitted homes within | |||||||||||
| the local authority social housing stock | |||||||||||
| as part of the National Retrofit | |||||||||||
| Programme | |||||||||||
| 7.4 Implementation of regeneration projects | |||||||||||
| across the country to help address the | |||||||||||
| causes of disadvantage | |||||||||||
| 8. Deliver Capital Programme for Traveller Accommodation | 8.1 Support local authorities to deliver | Increased delivery of Traveller specific housing Implementation of recommendations of the Expert Group Report on Traveller Accommodation | Number of Traveller specific homes delivered | ||||||||
| increased levels of Traveller specific | |||||||||||
| accommodation | |||||||||||
| 8.2 Continue the programme of work to | |||||||||||
| implement the recommendations of the | |||||||||||
| Traveller Accommodation Expert | |||||||||||
| Review report |
15
| Strategic Goal A: To provide a framework that ensures a sustainable housing system in Ireland with a supply of good quality | |||||||||||
| housing to match the needs of all our people | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| 9. Deliver Capital Private House Grants Schemes | 9.1 Support local authorities to deliver | Increased delivery of Housing | Number of grants issued | ||||||||
| increased levels of Housing Adaptation | Adaptation Grants for Older | ||||||||||
| Grants for Older People and People | People and People with a | ||||||||||
| with Disability Grants Schemes | Disability Grants Schemes | ||||||||||
| 10. Provide for development of effective AHB policy and statutory regulation | 10.1 To fully transition from voluntary to statutory regulation for the AHB sector 10.2 To develop a long-term strategy for the AHB sector | The Approved Housing Bodies | AHBRA Annual Report published with sectorial analysis | ||||||||
| Regulatory Authority (AHBRA) | |||||||||||
| is fully operational and | |||||||||||
| regulating all AHBs | |||||||||||
| A streamlined AHB sector | |||||||||||
| which can support housing | |||||||||||
| delivery, provide tenant support | |||||||||||
| and management services | |||||||||||
| 11. Continue the delivery | 11.1 Ensure that lending policies and operational guidance support the efficient delivery of local authority mortgages | Increased homeownership for creditworthy borrowers unable to get finance from commercial banks | Increasing the number of | ||||||||
| of the Local Authority | households gaining | ||||||||||
| Home Loan and | homeownership through | ||||||||||
| maintain oversight of | the Local Authority Home | ||||||||||
| local authority | Loan | ||||||||||
| lending policy | |||||||||||
| Maintaining low levels of | |||||||||||
| arrears |
16
| Strategic Goal A: To provide a framework that ensures a sustainable housing system in Ireland with a supply of good quality | |||||||||||
| housing to match the needs of all our people | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| 12. Support Affordable Home Ownership and Cost Rental Delivery | 12.1 Work with the First Home Scheme | National Affordable Purchase Shared Equity Scheme (private developments) in place and progress the local authority led affordable purchase scheme (public lands) Regional price ceilings recognize current market realities and changes to material / labour costs Delivery of affordable homes by local authorities, Approved Housing Bodies and the Land Development Agency (LDA) in line with needs identified in local authority Housing Delivery Action Plans Policy framework and legislative basis for the Affordable Purchase and Cost Rental sectors regularly | Number of homes available for affordable purchase Number of homes made available for Cost Rental Level of drawdown of Cost Rental Equity Loan funding by Approved Housing Bodies State funding of the First Home Scheme Ireland DAC special purpose vehicle Number of State lands transferred to the LDA for ownership Activity of the First Home Scheme (shared equity) including level of drawdowns | ||||||||
| Ireland Dedicated Activity Company | |||||||||||
| (DAC) to progress implementation of | |||||||||||
| the national First Home Scheme for | |||||||||||
| housing on private lands | |||||||||||
| 12.2 Conduct a review of the regional price | |||||||||||
| ceilings for the First Home Scheme on | |||||||||||
| a 6 monthly basis | |||||||||||
| 12.3 Through Affordable Housing Fund | |||||||||||
| investment, enable local authorities to | |||||||||||
| develop a strong housing pipeline for | |||||||||||
| sale to eligible buyers at an affordable | |||||||||||
| price on a shared equity basis | |||||||||||
| 12.4 Oversee the development and | |||||||||||
| expansion of the Cost Rental housing | |||||||||||
| sector by a range of providers, | |||||||||||
| including revising policies and | |||||||||||
| legislation where required | |||||||||||
| 12.5 Implement and review sustainable | |||||||||||
| funding methods for developing Cost | |||||||||||
| Rental housing |
17
| Strategic Goal A: To provide a framework that ensures a sustainable housing system in Ireland with a supply of good quality | |||||||||||
| housing to match the needs of all our people | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| 12.6 Manage/Administer the Local Infrastructure Housing Activation Fund Programme 12.7 Co-ordination of a strategic approach to the delivery of affordable purchase and cost rental homes as aligned with the NPF and compact urban growth priorities 12.8 Promote best practice in the delivery of Affordable and Cost Rental homes alongside key delivery partners 12.9 Developing a better sectoral knowledge of delivery and market engagement with key partners | reviewed and amended as appropriate Sustainable funding arrangements to support viable delivery of new homes into the Cost Rental sector by a range of providers New Cost Rental Equity Loan Funding model for accelerated delivery of Cost Rental homes by AHBs in place Sustainable delivery of quality housing within mixed tenure schemes at scale in our cities and towns Sustainable development of housing provided by the LDA, including climate resistant, low- carbon and affordable housing | Level of drawdown in the | |||||||||
| Local Infrastructure | |||||||||||
| Housing Activation Fund | |||||||||||
| (LIHAF) | |||||||||||
| Level of progress across | |||||||||||
| the approved projects, | |||||||||||
| approved under LIHAF | |||||||||||
| Number of housing units | |||||||||||
| delivered associated with | |||||||||||
| LIHAF projects | |||||||||||
| Publication of sectoral | |||||||||||
| guidance as applicable | |||||||||||
| Number of dedicated | |||||||||||
| upskilling events for local | |||||||||||
| government, AHBs and | |||||||||||
| others via the | |||||||||||
| Department, Housing | |||||||||||
| Delivery Co-ordination | |||||||||||
| Office and Housing | |||||||||||
| Agency |
18
| Strategic Goal A: To provide a framework that ensures a sustainable housing system in Ireland with a supply of good quality | |||||||||||
| housing to match the needs of all our people | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| LDA support for local | |||||||||||
| authorities to develop key large- | |||||||||||
| scale, strategic sites | |||||||||||
| Development of published case | |||||||||||
| exemplars to assist in the on- | |||||||||||
| going delivery of viable projects | |||||||||||
| within the sector | |||||||||||
| Dedicated sectoral workshops | |||||||||||
| and engagements on an annual | |||||||||||
| basis |
Strategic Goal B: To provide a framework for the sustainable
management of water resources from source to sea and for the
provision of effective and efficient water services
| Strategic Goal B: To provide a framework for the sustainable management of water resources from source to sea and for the | |||||||||||
| provision of effective and efficient water services | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| 1. Protect, enhance and restore water quality and water resources, implementing the UN’s Sustainable Development Goal (SDG) 6 “Ensure availability and sustainable management of water and sanitation for all” | 1.1 Ensuring full implementation of all water related EU Directives and Regulations 1.2 Resolve and close water sector EU infringement files on water infrastructure, compliance and transposition 1.3 Implementation of the River Basin Management Plan (RBMP) programme of measures and delivering on UN Sustainable Development Goal (SDG) 6 1.4 Deliver the EU LIFE-IP “Waters of Life” project to protect and restore selected high ecological status waterbodies 1.5 Continue the Local Authority Waters Programme (LAWPRO) and expand the Community Water Development Fund | Improved compliance in drinking water, urban waste water and full compliance with the Water Framework Directive River Basin Management Plan (RBMP) launched with a comprehensive set of measures to protect, enhance and restore the status of surface waters and ground waters Implementation of Programme of Measures in River Basin Management Plans Water quality is protected from further deterioration and restored to at least good status as appropriate Timely and successful delivery of the Waters of Life Project including engagement stakeholders and measures to | Commission Infringement | ||||||||
| File Status Environmental | |||||||||||
| Protection Agency (EPA) | |||||||||||
| Drinking Water and | |||||||||||
| Waste Water Report | |||||||||||
| EPA Water Quality | |||||||||||
| Reports - reporting of | |||||||||||
| performance indicators on | |||||||||||
| water quality; bathing | |||||||||||
| water report; water quality | |||||||||||
| in Ireland report | |||||||||||
| SDG progress reports | |||||||||||
| New RBMP published in | |||||||||||
| 2023 | |||||||||||
| ASSAP Operational | |||||||||||
| Reports - operational | |||||||||||
| indicators and outcomes | |||||||||||
| linked to successful water | |||||||||||
| quality measures | |||||||||||
| LAWPRO Operational | |||||||||||
| Reports -operational |
21
| Strategic Goal B: To provide a framework for the sustainable management of water resources from source to sea and for the | |||||||||||
| provision of effective and efficient water services | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| 1.6 Implement measures in the 5th Nitrates | protect and restore high status rivers developed, trialled and validated Reduced impact from excess loss of nutrients to water Progression of North South Ministerial Council (NSMC) environmental work programme and co-funding PEACEPLUS projects. | indicators and outcomes linked to successful water quality measures Ongoing engagement with NSMC Environment Sector and PEACEPLUS programme | |||||||||
| Action Programme including the interim | |||||||||||
| review | |||||||||||
| 1.7 Supporting negotiations of green deal | |||||||||||
| legislative proposals (Urban Waste | |||||||||||
| Water Treatment Directive recast and | |||||||||||
| the Environmental Quality Standards | |||||||||||
| Directive review) | |||||||||||
| 1.8 Support North South co-operation in | |||||||||||
| water quality and resources | |||||||||||
| 2. Structure water and | 2.1 Ensure that Uisce Éireann progresses works to reduce the number of schemes on the EPA’s Remedial Action List 2.2 Implement the National Lead (Pb) Strategy, as appropriate 2.3 Ensure that Uisce Éireann develops Drinking Water Safety Plans to protect abstraction sources and reduce public health risks | Drinking water quality is | Results in EPA Drinking | ||||||||
| waste water services | protected, and average lead | Water Quality Reports | |||||||||
| around Ireland’s | exposure risk is reduced from | reporting of performance | |||||||||
| needs, the centrality | public-side; risk profile is known | indicators on drinking | |||||||||
| of customers, the | and the infringement case | water quality | |||||||||
| prioritisation of public | related to drinking water is | ||||||||||
| Number of actions in the | |||||||||||
| health and | resolved | ||||||||||
| National Lead Strategy | |||||||||||
| environmental | |||||||||||
| protection, | Actions in National Lead (Pb) | fully implemented or | |||||||||
| Strategy are implemented with | ongoing | ||||||||||
| contributing towards | |||||||||||
| enhanced awareness of | |||||||||||
| the implementation of | Increased uptake of the | ||||||||||
| stakeholders’ responsibilities | |||||||||||
| UN Sustainable | Domestic Lead |
22
| Strategic Goal B: To provide a framework for the sustainable management of water resources from source to sea and for the | |||||||||||
| provision of effective and efficient water services | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| Development Goal (SDG) 6 “Ensure availability and sustainable management of water and sanitation for all” | 2.4 Commission a range of research projects to explore innovative ways of improving our water infrastructure and reducing consumption 2.5 Review the electricity requirements of water and wastewater treatment plants and carry out a series of pilot projects to incorporate onsite renewable energy generation 2.6 Review and work to improve the inspection regime for the 500,000 domestic waste water systems and incentivise upgrading works | Increase the uptake of the | Remediation Grant Scheme Outcome of the pilot project on climate and biodiversity in Group Water Schemes (GWS) | ||||||||
| Domestic Lead Remediation | |||||||||||
| Grant Scheme | |||||||||||
| Provide support and input to | |||||||||||
| Uisce Éireann, An Fóram Uisce | |||||||||||
| and the Environmental | |||||||||||
| Protection Agency (EPA) | |||||||||||
| research programme | |||||||||||
| Research knowledge on | |||||||||||
| reducing the carbon footprint at | |||||||||||
| pilot plants that will inform wider | |||||||||||
| scale adoption at national | |||||||||||
| scale, including in Group Water | |||||||||||
| Schemes (GWS) | |||||||||||
| 3. Implement water sector reform contributing towards the implementation of UN Sustainable Development Goal (SDG) 6 “Ensure availability and | 3.1 Support the development of Uisce | A stable operational framework | Achieving water sector transformation through the Framework for future delivery of water services with local authorities no longer having any involvement in the direct | ||||||||
| Éireann as enduring world-class | for the future delivery of water | ||||||||||
| publicly-owned, stand-alone, regulated | services that meets the needs | ||||||||||
| single utility for the nationwide delivery | and expectations of citizens | ||||||||||
| of public water services | and is in keeping with the | ||||||||||
| principles of social, economic | |||||||||||
| 3.2 Ensure funding of Uisce Éireann under | |||||||||||
| agreed funding framework to make the | and environmental | ||||||||||
| sustainability | |||||||||||
| necessary investment in drinking water |
23
| Strategic Goal B: To provide a framework for the sustainable management of water resources from source to sea and for the | |||||||||||
| provision of effective and efficient water services | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| sustainable management of water and sanitation for all” | and waste water infrastructure to ensure the continued underpinning of the investment planned under Project Ireland 2040 | Uisce Éireann’s Water Services Strategic Plan and Strategic Funding Plan in support of the National Development Plan Objectives are adequately funded; and reflect the regulatory decisions of the Commission for Regulation of Utilities (CRU) | provision of water | ||||||||
| services by end 2026 | |||||||||||
| Review of the 2018-2025 | |||||||||||
| Water Services Policy | |||||||||||
| Statement | |||||||||||
| Compliance with EU | |||||||||||
| Urban Waste Water | |||||||||||
| standards | |||||||||||
| Number of Waste Water | |||||||||||
| Treatment Plants and | |||||||||||
| Drinking Water Plants | |||||||||||
| (new and upgraded) | |||||||||||
| Kilometres of Water and | |||||||||||
| Waste Water Network | |||||||||||
| (new and rehabilitated) | |||||||||||
| 4. Reform of the Rural | 4.1 Support the Rural Water Working Group in implementing the recommendations identified for the Rural Water Sector, considering governance, supervision and operation | Future needs of the Rural Water Sector identified Consumers in rural areas have access to equitable services | Number of private wells | ||||||||
| Water Sector | (new and upgraded) | ||||||||||
| contributing towards | grant-aided | ||||||||||
| the implementation of | |||||||||||
| Number of septic tanks | |||||||||||
| UN Sustainable | |||||||||||
| (upgraded) grant-aided | |||||||||||
| Development Goal |
24
| Strategic Goal B: To provide a framework for the sustainable management of water resources from source to sea and for the | |||||||||||
| provision of effective and efficient water services | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| (SDG) 6 “Ensure | 4.2 Preparation of a new Multi-Annual Rural Water Programme on a national basis with administrative procedures and guidance for the period up to 2025 | Improved drinking water quality in group water schemes (where agreed) | Reports produced in a timely manner to address specific needs | ||||||||
| availability and | |||||||||||
| sustainable | |||||||||||
| management of water | |||||||||||
| and sanitation for all” | |||||||||||
| 5. Support the | 5.1 Preparation of a new Multi-Annual Developer Provided Water Services Infrastructure Resolution Programme on a national basis with administrative procedures and guidance for the period 2024-2026 | The progressive taking in charge of housing estates with Developer Provided Water Services Infrastructure | Number of estates with | ||||||||
| progressive resolution, | Developer Provided | ||||||||||
| of legacy stand-alone | Infrastructure resolved, | ||||||||||
| Developer Provided | thus enabling these | ||||||||||
| Water Services | estates to be taken in | ||||||||||
| Infrastructure in | charge by the local | ||||||||||
| housing estates | authority | ||||||||||
| 6. Ensure that Ireland | 6.1 Implement the third cycle of the Marine Strategy Framework Directive (MSFD) to 2030 6.2 Actively participate in the OSPAR Commission in the development and delivery of a strategy from 2021-2030 and a quality status assessment in 2023 | Marine waters maintain or achieve Good Environmental Status (GES) across all descriptors National marine spatial plan includes up to date MSFD environmental targets Ireland’s associated measures to protect and conserve the marine | Degree of achievement of GES in 2024 and state of the environment assessed in the OSPAR Quality Status Report in 2023 New MPA legislation enacted by 2023 | ||||||||
| has a clean, healthy, | |||||||||||
| diverse and | |||||||||||
| sustainably used | |||||||||||
| maritime area while | |||||||||||
| implementing relevant | |||||||||||
| parts of UN | |||||||||||
| Sustainable | |||||||||||
| Development Goal | |||||||||||
| (SDG) 14 “Conserve |
25
| Strategic Goal B: To provide a framework for the sustainable management of water resources from source to sea and for the | |||||||||||
| provision of effective and efficient water services | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| and sustainably use the oceans, seas and marine resources for sustainable development” | 6.3 Develop comprehensive legislation for the designation and management of Marine Protected Areas (MPAs) 6.4 Develop and implement a coordinated national approach to United Nations marine environment objectives and targets on marine protection | environment and ensure its sustainable use An expanded, coherent and representative network of MPAs developed in close consultation with all stakeholders | Degree of achievement of | ||||||||
| targets and related | |||||||||||
| indicators of UN SDG | |||||||||||
| number (14) | |||||||||||
| Degree of implementation | |||||||||||
| of the UN post-2020 | |||||||||||
| Global Biodiversity | |||||||||||
| Framework | |||||||||||
| Adoption, ratification and | |||||||||||
| establishment of new | |||||||||||
| Conference of Parties | |||||||||||
| (COP) for Biodiversity | |||||||||||
| Beyond National | |||||||||||
| Jurisdictions | |||||||||||
| Development of a an | |||||||||||
| environmental regulatory | |||||||||||
| regime for the | |||||||||||
| international seabed | |||||||||||
| authority | |||||||||||
| 7. Ensure transboundary co-operation on | 7.1 Develop appropriate coordination co- | Collaborative engagement with | Degree of achievement of | ||||||||
| operation mechanisms within the | UK administrations to ensure | GES in 2024 and state of | |||||||||
| existing framework of agreements and | that shared marine waters | the environment as |
26
| Strategic Goal B: To provide a framework for the sustainable management of water resources from source to sea and for the | |||||||||||
| provision of effective and efficient water services | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| marine environment issues | continue to forge alliances with other | achieve Good Environmental Status (GES) and the equivalent under UK legislation and the OSPAR Convention | assessed in the OSPAR Quality Status Report in 2023 | ||||||||
| Member States | |||||||||||
| 7.2 Ensure that the revisions to the Marine | |||||||||||
| Strategy Framework Directive due in | |||||||||||
| 2023-2025 address transboundary co- | |||||||||||
| operation including with third countries |
27

Figure from page 32
Strategic Goal C: Recognising the large numbers of public bodies that local authorities now provide services on behalf of, work with and through policy
and programme leaders across national and local Government to enable
independent, democratic, responsive, innovative and effective local government. Ensure effective electoral management and high quality fire
28
services and emergency management
| Strategic Goal C: Recognising the large numbers of public bodies that local authorities now provide services on behalf of, work | |||||||||||
| with and through policy and programme leaders across national and local Government to enable independent, democratic, | |||||||||||
| responsive, innovative and effective local government. Ensure effective electoral management and high quality fire services and | |||||||||||
| emergency management | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| 1. Develop policy and systems to ensure effective electoral management and reform | 1.1 Commence remaining parts of the Electoral Reform Act 2022 1.2 Legislate for new Dáil and European Parliament constituencies 1.3 Provide the necessary support for the smooth running of elections and referendums 1.4 Complete the modernisation process for voter registration 1.5 Consider an appropriate response to the Supreme Court finding in respect of the election of the University Members of Seanad Éireann | Legislative provisions | Regulation of online political advertising arrangements during election periods in place by end 2023 New Dáil and European Parliament constituencies established by end 2023 Numbers of electoral events held in accordance with legislation Fully modernised electoral registration process in place and supported by new national system by end 2025 Policy options agreed by Government in 2023 on the election of the | ||||||||
| commenced for: | |||||||||||
| o the regulation of online | |||||||||||
| political advertising during | |||||||||||
| election periods; | |||||||||||
| o protecting the integrity of | |||||||||||
| elections against the | |||||||||||
| dissemination of | |||||||||||
| disinformation in the online | |||||||||||
| sphere | |||||||||||
| New legislation to provide for | |||||||||||
| revised Dáil and European | |||||||||||
| Parliament Constituencies | |||||||||||
| Necessary supports in place to | |||||||||||
| ensure electoral events | |||||||||||
| completed | |||||||||||
| Simplified processes and | |||||||||||
| procedures for electoral | |||||||||||
| registration in place |
29
| Strategic Goal C: Recognising the large numbers of public bodies that local authorities now provide services on behalf of, work | |||||||||||
| with and through policy and programme leaders across national and local Government to enable independent, democratic, | |||||||||||
| responsive, innovative and effective local government. Ensure effective electoral management and high quality fire services and | |||||||||||
| emergency management | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| Policy options on the election of | University Members of Seanad Éireann | ||||||||||
| the University Members of | |||||||||||
| Seanad Éireann. prepared for | |||||||||||
| Government | |||||||||||
| 2. To support and advance Government policy to enhance and develop local government | 2.1 Consider the monitoring report of the Congress of Local and Regional Authorities of the Council of Europe (CLRAE) Committee on the Honouring of Obligations and Commitments by Member States of the European Charter of Local Self-Government in respect of local and regional democracy in Ireland and examine options for responding to findings 2.2 Introduce legislation to establish the office of directly elected mayor and to facilitate mayoral elections in Limerick 2.3 Consider the report of the Citizens’ Assembly on a Directly Elected Mayor for Dublin and seek Government | Review completed of the CLRAE monitoring report and submitted to Government Legislation enacted providing for mayoral elections in Limerick and the first directly elected mayor with executive functions in place in Limerick to 2029, thereafter with a 5 year term Response to report on Dublin Directly Elected Mayor developed | Policy paper prepared on | ||||||||
| potential measures to | |||||||||||
| boost local and regional | |||||||||||
| government as necessary | |||||||||||
| based on CLRAE report | |||||||||||
| findings | |||||||||||
| A mayoral election held in | |||||||||||
| Limerick in accordance | |||||||||||
| with legislation enacted | |||||||||||
| Memorandum to | |||||||||||
| Government in respect of | |||||||||||
| Dublin Directly Elected | |||||||||||
| Mayor | |||||||||||
| Policy paper prepared on | |||||||||||
| potential measures to | |||||||||||
| boost local government |
30
| Strategic Goal C: Recognising the large numbers of public bodies that local authorities now provide services on behalf of, work | |||||||||||
| with and through policy and programme leaders across national and local Government to enable independent, democratic, | |||||||||||
| responsive, innovative and effective local government. Ensure effective electoral management and high quality fire services and | |||||||||||
| emergency management | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| agreement for a proposed policy response 2.4 Undertake a review of governance and oversight structures in local government 2.5 Inter-departmental engagement to strengthen awareness of LG structures, resourcing and funding; the role of local government in the development and implementation of national policy; and innovation in service delivery 2.6 Undertake a review of Strategic Policy Committees (SPCs) 2.7 Promote Municipal District-led leadership and engagement on a Town Centre First approach to the regeneration of towns and villages to improve co-operation and municipal governance for urban areas that extend beyond county boundaries by carrying | A review of governance and oversight structures in local government undertaken Inter-departmental Group on Local Government meeting to strengthen engagement Review of Strategic Policy Committees (SPCs) completed in consultation with the sector Policy in place to ensure consistent development of urban areas lying within the administrative area of more than one local authority Initiatives to encourage more women and greater diversity in local government pursued in advance of the 2024 local elections | leadership and | |||||||||
| accountability and a | |||||||||||
| revised Code of | |||||||||||
| Governance completed | |||||||||||
| and implemented from | |||||||||||
| 2023 | |||||||||||
| 2 meetings of cross- | |||||||||||
| departmental Group on | |||||||||||
| Local Government | |||||||||||
| annually from 2024 | |||||||||||
| Updated SPC frameworks | |||||||||||
| in place in all local | |||||||||||
| authorities from Local | |||||||||||
| Elections 2024. | |||||||||||
| Model for the operation of | |||||||||||
| urban area committees to | |||||||||||
| allow for cross-boundary | |||||||||||
| co-operation in place | |||||||||||
| Higher proportion of | |||||||||||
| women candidates |
31
| Strategic Goal C: Recognising the large numbers of public bodies that local authorities now provide services on behalf of, work | |||||||||||
| with and through policy and programme leaders across national and local Government to enable independent, democratic, | |||||||||||
| responsive, innovative and effective local government. Ensure effective electoral management and high quality fire services and | |||||||||||
| emergency management | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| out a review of the operation of urban | A robust, transparent and balanced financial system operating at local level for the benefit of citizens and councils Appropriate strategic human resource and strategic workforce planning strategies in place to deliver local and national government priorities | participating in Local | |||||||||
| area committees | Elections 2024 than in | ||||||||||
| 2019 | |||||||||||
| 2.8 Initiatives to encourage more women | |||||||||||
| and greater diversity in local | Legislation to implement | ||||||||||
| government pursued in advance of the | modernisation of the | ||||||||||
| 2024 local elections | commercial rates system | ||||||||||
| brought forward and | |||||||||||
| 2.9 Ensure local government has an | |||||||||||
| systems to support these | |||||||||||
| appropriate funding model by | |||||||||||
| changes developed and | |||||||||||
| considering further streamlining of the | |||||||||||
| rolled out in local | |||||||||||
| commercial rates system and | |||||||||||
| authorities | |||||||||||
| supporting changes to Local Property | |||||||||||
| Tax (LPT), specifically a move to 100% | Review of baseline, non- | ||||||||||
| local retention of LPT and a review of | programme funding of | ||||||||||
| the LPT baseline, as well as ensuring | local authorities | ||||||||||
| transparency for homeowners and | completed and | ||||||||||
| ratepayers on local authority | recommendations made | ||||||||||
| expenditure | on key indicators that may | ||||||||||
| be used to allocate | |||||||||||
| 2.10 Work with the Local Government sector | |||||||||||
| available funding in a fair, | |||||||||||
| to ensure they have an appropriate | |||||||||||
| equitable and transparent | |||||||||||
| resourcing model in place; including | |||||||||||
| manner | |||||||||||
| through strategic workforce planning, a |
32
| Strategic Goal C: Recognising the large numbers of public bodies that local authorities now provide services on behalf of, work | |||||||||||
| with and through policy and programme leaders across national and local Government to enable independent, democratic, | |||||||||||
| responsive, innovative and effective local government. Ensure effective electoral management and high quality fire services and | |||||||||||
| emergency management | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| sustainable approach to sanctioning | Strategic HR strategies and strategic workforce planning in place | ||||||||||
| and funding of posts across | |||||||||||
| government, appropriate recruitment | |||||||||||
| and retention-supporting strategies and | |||||||||||
| skills building approaches | |||||||||||
| 3. Develop policy and systems to ensure effective and high quality fire services and emergency management | 3.1 Ensure appropriate structures are in place to develop and implement policy in respect of fire and emergency management in the State 3.2 Ensure that the policies in place in respect of the retained fire service lead to a high quality, responsive, sustainable service for citizens 3.3 Working with the Local Government (LG) sector, ensure that the system for emergency call-taking for fire services is robust, resilient and best practice 3.4 Review the Framework for Major Emergency Management (MEM) to ensure that mechanisms and strategies | Board of the National | Regular Board and sub- group meetings held with timely provision of papers Provision of capital funding to support fire station building/refurb and upgrading of equipment Contribute to the work of the Task and Finish Group on ambulance services in the Dublin region | ||||||||
| Directorate of Fire & | |||||||||||
| Emergency Management | |||||||||||
| (NDFEM) supported and policy | |||||||||||
| initiatives progressed through | |||||||||||
| that structure that ensure a | |||||||||||
| professional, appropriately | |||||||||||
| trained fire service, with strong | |||||||||||
| governance structures, | |||||||||||
| implementing a risk-based | |||||||||||
| approach to fire safety and | |||||||||||
| emergency management | |||||||||||
| Support the LG sector in the | |||||||||||
| implementation of the | |||||||||||
| recommendations of the | |||||||||||
| Review of the Retained Fire |
33
| Strategic Goal C: Recognising the large numbers of public bodies that local authorities now provide services on behalf of, work | |||||||||||
| with and through policy and programme leaders across national and local Government to enable independent, democratic, | |||||||||||
| responsive, innovative and effective local government. Ensure effective electoral management and high quality fire services and | |||||||||||
| emergency management | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| in place are robust, appropriate and effective 3.5 Review Fire Services Acts and make recommendations for legislative change that will ensure that the future fire and emergency mechanisms in the State are supported by relevant legislative powers and requirements, as appropriate | Service, published in December 2022 Resilient call-taking system in place with strong business continuity plans Review of MEM Framework completed in consultation with all relevant stakeholders with approach for the future agreed Fire Services Acts reviewed and legislative change proposed, as relevant | Recommendations of | |||||||||
| Retained Fire Service | |||||||||||
| Review implemented | |||||||||||
| Review of current system | |||||||||||
| completed and plans for | |||||||||||
| the future developed and | |||||||||||
| agreed by the NDFEM | |||||||||||
| Management Board and | |||||||||||
| the local government | |||||||||||
| sector | |||||||||||
| MEM Framework agreed | |||||||||||
| by Government | |||||||||||
| Review of Fire Services | |||||||||||
| Acts completed and policy | |||||||||||
| recommendations made | |||||||||||
| to Government for | |||||||||||
| change, as necessary |
34
| Strategic Goal C: Recognising the large numbers of public bodies that local authorities now provide services on behalf of, work | |||||||||||
| with and through policy and programme leaders across national and local Government to enable independent, democratic, | |||||||||||
| responsive, innovative and effective local government. Ensure effective electoral management and high quality fire services and | |||||||||||
| emergency management | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| 4. Strengthen oversight of the Department’s State Bodies | 4.1 Ensure consistency of approaches and processes in place in the Department to oversee bodies under our aegis | Consistent processes in place, | Cross-divisional group meeting at least 3 times a year PCR programme progressed Digitised process operational and report on State bodies compliance delivered to management board | ||||||||
| greater ongoing engagement | |||||||||||
| with all sections involved | |||||||||||
| through a cross-divisional group | |||||||||||
| structure and Periodic Critical | |||||||||||
| Reviews (PCR) underway | |||||||||||
| Review compliance with the | |||||||||||
| Code of Practice for the | |||||||||||
| Governance of State Bodies | |||||||||||
| and introduce a new digitised | |||||||||||
| method for monitoring of, and | |||||||||||
| reporting on compliance |
35

Figure from page 40
Strategic Goal D: To ensure that planning and building in our regions,
communities and maritime area contributes to the delivery of
36
sustainable and balanced development
| Strategic Goal D: To ensure that planning and building in our regions, communities and maritime area contributes to the delivery | |||||||||||
| of sustainable and balanced development | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| 1. Delivery and revision of the National Planning Framework (NPF) to achieve a more sustainable pattern and form of spatial development that is aligned with public investment to support more balanced regional development | 1.1 The development, monitoring and review of national planning policy, legislation and guidance, including review of the NPF by 2024 1.2 Working with stakeholders to operationalise the NPF 1.3 Implement and monitor the strategic alignment of spatial planning and investment 1.4 Engage with and provide, as appropriate, ongoing technical support to local authorities to assist in the development and management of projects approved under the Urban Regeneration and Development Fund (URDF) 1.5 Provide advice, technical support, expertise and guidance on a broad range of planning- | Greater focus on strategic | Delivery of NPF targets and objectives The publication and implementation of new and updated legislation and guidance that are reflected in regional and local planning policy on a rolling annual basis Consistency across national policies in terms of alignment with the NPF, including NDP review to be monitored annually as part of the Project Ireland 2040 process Consistent regional and local spatial planning policies with public investment aligned with targeted population and housing growth, to be assessed through the local development plan process and resultant growth outcomes Progress towards NPF targets, including more than 50% of growth | ||||||||
| planning and sustainable | |||||||||||
| development throughout | |||||||||||
| Ireland to accommodate | |||||||||||
| projected future population | |||||||||||
| and economic growth with | |||||||||||
| investment better aligned with | |||||||||||
| spatial planning policy | |||||||||||
| Operational planning system | |||||||||||
| which meets the ongoing | |||||||||||
| requirements at national, | |||||||||||
| regional and local levels | |||||||||||
| Enable the development of | |||||||||||
| improved planning practice | |||||||||||
| across all relevant | |||||||||||
| stakeholders including | |||||||||||
| promotion of best practice and | |||||||||||
| the highest professional | |||||||||||
| standards in the operation of | |||||||||||
| the Irish planning system | |||||||||||
| Contribute to the regeneration | |||||||||||
| and rejuvenation of cities and | |||||||||||
| large towns enabling more |
37
| Strategic Goal D: To ensure that planning and building in our regions, communities and maritime area contributes to the delivery | |||||||||||
| of sustainable and balanced development | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| related matters to all stakeholders 1.6 Maintain a review of the planning system, focusing particularly on forecasting, access to planning services and planning for sustainable development 1.7 The development of proposals for urban land activation, including land value capture 1.8 Leading, in conjunction with colleagues in the Department of Rural and Community Development, on the implementation of the Town Centre First policy 1.9 Establish City Delivery Boards to co-ordinate and drive development in each of the five cities, to activate strategic areas | residential and mixed-use development to be delivered | to take place outside Dublin and | |||||||||
| the Eastern Region and an | |||||||||||
| average of 40% of housing | |||||||||||
| nationally to be on greenfield or | |||||||||||
| infill sites | |||||||||||
| Progress towards delivery of a | |||||||||||
| programme of high quality | |||||||||||
| transformational URDF projects in | |||||||||||
| cities, larger towns and urban | |||||||||||
| areas that are qualitatively | |||||||||||
| assessed to have a positive impact | |||||||||||
| and be consistent with national | |||||||||||
| planning objectives | |||||||||||
| Achievement of targets set for | |||||||||||
| each local authority on the number | |||||||||||
| of vacant homes that can be | |||||||||||
| brought back into use | |||||||||||
| Increasing physical, social and | |||||||||||
| economic regeneration activity, in | |||||||||||
| Ireland’s towns | |||||||||||
| Development of national rural | |||||||||||
| housing policy through updated |
38
| Strategic Goal D: To ensure that planning and building in our regions, communities and maritime area contributes to the delivery | |||||||||||
| of sustainable and balanced development | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| and achieve effective density and consolidation | ministerial guidance that can be | ||||||||||
| implemented consistently at a local | |||||||||||
| level to support rural housing | |||||||||||
| needs in accordance with EU | |||||||||||
| objectives | |||||||||||
| Development of national policy for | |||||||||||
| settlements through updated | |||||||||||
| ministerial guidance that can be | |||||||||||
| implemented consistently at a local | |||||||||||
| level to support compact growth in | |||||||||||
| accordance with national and EU | |||||||||||
| objectives | |||||||||||
| Successful rollout of online | |||||||||||
| planning portals to the 31 local | |||||||||||
| authorities and the deployment of | |||||||||||
| a new online portal by An Bord | |||||||||||
| Pleanála (ABP) | |||||||||||
| Publication of final maps for land in | |||||||||||
| scope for Residential Zoned Land | |||||||||||
| Tax in December 2023 |
39
| Strategic Goal D: To ensure that planning and building in our regions, communities and maritime area contributes to the delivery | |||||||||||
| of sustainable and balanced development | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| Legislation to introduce Land | |||||||||||
| Value Sharing and Urban | |||||||||||
| Development Zones to be enacted | |||||||||||
| 2. Develop and implement a Marine Planning System and Framework. Support the long-term and sustainable development of the maritime area ensuring protection of marine biodiversity, supporting coastal communities and encouraging investment | 2.1 Development and | Marine Planning Policy Statement (MPPS) adopted by Q4 2023. The MPPS will set out a clear vision for the future development of our marine planning system Part 2 of the MAP Act will be commenced in Q2 2023. Processes in place to assess requests for designation and DMAP proposals Marine Planning Guidelines for Offshore Wind Energy will support An Bord Pleanála and others in enabling development of Offshore Renewable Energy in Ireland | Draft MPPS to be published in Q2 | ||||||||
| implementation of the Marine | 2023, along with invitation to seek | ||||||||||
| Planning Policy Statement | public representations on same | ||||||||||
| (MPPS) | |||||||||||
| Subject to environmental | |||||||||||
| 2.2 Commence Part 2 of the | assessments and public | ||||||||||
| Maritime Area Planning Act | representations, finalised draft | ||||||||||
| 2021(MAP Act). Facilitate and | MPPS to go before Houses of the | ||||||||||
| support the designation of public | Oireachtas in Q3 2023 | ||||||||||
| bodies as competent authorities | |||||||||||
| Commencement order signed by | |||||||||||
| for the purpose of preparing | |||||||||||
| the Minister. Requests for | |||||||||||
| Designated Maritime Area Plans | |||||||||||
| designations processed in | |||||||||||
| (DMAPs). Progress work on the | |||||||||||
| accordance with Part 2 of MAP | |||||||||||
| development of Ministerial | |||||||||||
| Act. DMAP proposals assessed | |||||||||||
| Guidelines for DMAPs | |||||||||||
| Marine Planning Guidelines for | |||||||||||
| 2.3 Develop Ministerial Offshore | |||||||||||
| Offshore Wind Energy published | |||||||||||
| Wind Energy Marine Planning | |||||||||||
| Guidelines for Planning | Consultation with ABP on planning | ||||||||||
| Authorities | regulations |
40
| Strategic Goal D: To ensure that planning and building in our regions, communities and maritime area contributes to the delivery | |||||||||||
| of sustainable and balanced development | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| 2.4 Develop Planning Regulations | Planning regulations for maritime development published Circular / Letter issued to ABP Plan to implement recommendations of SRMMI is in place and agreed with Department, ABP, CPA and MARA Increased understanding of the emergent planning activities and responsibilities in the marine area A modern, robust new maritime planning system is established MAP Act is implemented to underpin Ireland’s marine planning system, supported by provisions in other legislation and regulations as necessary | Draft letter prepared in Q1 2023 Final SRMMI documentation complete and Business Case approved by ICT Governance and RFT issued Marine planning training programmes developed and delivered to staff and elected members of coastal planning authorities Tender is awarded and phased development is started New consenting system in place following transition from Foreshore system; relevant provisions of the MAP Act commenced as required; Planning and Development Act enables cohesive implementation of marine management measures | |||||||||
| to support Part 8 of the MAP Act | |||||||||||
| 2.5 Prepare and issue a Circular / | |||||||||||
| Letter to provide An Bord | |||||||||||
| Pleanála with guidance on | |||||||||||
| issuing an opinion on design | |||||||||||
| flexibility | |||||||||||
| 2.6 Develop plan to implement | |||||||||||
| recommendations of Supporting | |||||||||||
| Reform of Marine Management | |||||||||||
| in Ireland (SRMMI) project, | |||||||||||
| including funding structure. | |||||||||||
| 2.7 Development of a system based | |||||||||||
| on marineplan.ie (marine portal) | |||||||||||
| to support consenting authorities | |||||||||||
| 2.8 Primary legislative amendments | |||||||||||
| to MAP Act and supporting | |||||||||||
| changes to other legislation and | |||||||||||
| regulation necessary to ensure | |||||||||||
| cohesive implementation | |||||||||||
| 2.9 Utilise the Local Authority | |||||||||||
| Planning Sector Learning and |
41
| Strategic Goal D: To ensure that planning and building in our regions, communities and maritime area contributes to the delivery | |||||||||||
| of sustainable and balanced development | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| Development Strategy to | |||||||||||
| develop an effective education | |||||||||||
| and training programme for the | |||||||||||
| Marine Planning system | |||||||||||
| 3. Enable the Land Development Agency (LDA), An Bord Pleanála (ABP) and the Office of the Planning Regulator (OPR) to deliver on their mandates | 3.1 Ensure the LDA is adequately resourced to carry out its functions financing through its capitalisation and other relevant funding streams, e.g. borrowings 3.2 Oversee the LDA in meeting all its objectives as provided for under the Programme for Government 2020 - Our Shared Future and Housing for All 3.3 Ensure that ABP and the OPR have the powers, capacity, guidance and resources to carry out their statutory functions efficiently and effectively | The delivery of sustainable | Ongoing assembly of a public land bank to ensure a supply of development land to support delivery of housing Ongoing delivery of affordable housing, through cost rental and affordable purchase, by the LDA through direct delivery, partnerships with local authorities and Project Tosaigh | ||||||||
| communities including climate | |||||||||||
| resistant, low carbon housing | |||||||||||
| by the LDA | |||||||||||
| State lands being offered for | |||||||||||
| sale will be offered first to the | |||||||||||
| LDA | |||||||||||
| LDA to provide homes for | |||||||||||
| affordable purchase, cost | |||||||||||
| rental and social housing | |||||||||||
| LDA work with local | |||||||||||
| authorities to develop strategic | |||||||||||
| sites | |||||||||||
| The 3 planning agencies | |||||||||||
| (OPR, ABP and LDA) will | |||||||||||
| support Ireland’s plan led | |||||||||||
| planning process founded |
42
| Strategic Goal D: To ensure that planning and building in our regions, communities and maritime area contributes to the delivery | |||||||||||
| of sustainable and balanced development | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| upon transparency, objectivity, | |||||||||||
| evidence gathering and proper | |||||||||||
| public engagement in policy | |||||||||||
| development and decision | |||||||||||
| making | |||||||||||
| Proper oversight by the OPR | |||||||||||
| over the systems and | |||||||||||
| procedures used by planning | |||||||||||
| authorities and ensuring public | |||||||||||
| confidence in the delivery of | |||||||||||
| planning outcomes | |||||||||||
| 4. Operation of the | 4.1 Process applications for consent under the Foreshore Act 4.2 Estate management of the foreshore property portfolio 4.3 Manage foreshore litigation involving the Minister as plaintiff or defendant 4.4 Establish the Maritime Area Regulatory Authority (MARA) | Delivery of managed and compliant foreshore application system A modern, fit for purpose consenting regime for maritime development | Number of foreshore consent applications brought to a conclusion Number of foreshore litigation cases Maritime Area Consents awarded by MARA | ||||||||
| foreshore consenting | |||||||||||
| regime in respect of | |||||||||||
| developments and | |||||||||||
| activities on the | |||||||||||
| foreshore in advance | |||||||||||
| of the full transition to | |||||||||||
| the new maritime area | |||||||||||
| regulatory regime, to | |||||||||||
| be operated by | |||||||||||
| Maritime Area | |||||||||||
| Regulatory Authority |
| Strategic Goal D: To ensure that planning and building in our regions, communities and maritime area contributes to the delivery | |||||||||||
| of sustainable and balanced development | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| (MARA) and | |||||||||||
| underpinned by the | |||||||||||
| implementation of the | |||||||||||
| Maritime Area | |||||||||||
| Planning Act 2021 | |||||||||||
| 5. Lead the development, implementation and guidance for EU Directives, UN obligations and planning legislation relevant to the planning system | 5.1 Ensure legislation and guidance | The planning system is compliant with the State’s EU and international obligations and public participation rights are protected in domestic and transboundary EIA procedures | Number of EIA portal notifications uploaded Transboundary EIA consultations managed Legislation and guidance documents progressed Number of domestic and CJEU environmental planning litigation cases managed | ||||||||
| is updated, manage the | |||||||||||
| Environmental Impact | |||||||||||
| Assessment (EIA) Portal and | |||||||||||
| transboundary EIA consultations | |||||||||||
| 5.2 Input into the establishment of a | |||||||||||
| new Environmental and | |||||||||||
| Planning Law Court | |||||||||||
| 5.3 Having an appropriate | |||||||||||
| legislative and policy framework | |||||||||||
| for planning in Ireland which is | |||||||||||
| effective, efficient, streamlined | |||||||||||
| and transparent | |||||||||||
| 5.4 Coordinate and manage | |||||||||||
| environmental planning litigation | |||||||||||
| on behalf of the Department in | |||||||||||
| domestic courts and the Court of |
| Strategic Goal D: To ensure that planning and building in our regions, communities and maritime area contributes to the delivery | |||||||||||
| of sustainable and balanced development | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| Justice of the European Union | |||||||||||
| (CJEU) | |||||||||||
| 6. Update the Planning and Development Act (2000) to ensure that new legislation places plan-making at the centre of the planning system; increase clarity, streamline the legislation to improve its functionality for both practitioners and the general public, whilst protecting public participation | 6.1 Finalisation of the review and | To ensure that planning and building in our regions, communities and maritime area contributes to deliver sustainable and balanced development | Publication of the Planning and Development Bill 2022 Enactment of the Planning and Development Act 2023 | ||||||||
| consolidation of planning | |||||||||||
| legislation that is being | |||||||||||
| conducted in conjunction with | |||||||||||
| the Office of the Attorney | |||||||||||
| General | |||||||||||
| 6.2 Finalisation of draft Planning | |||||||||||
| and Development Bill 2022 | |||||||||||
| 6.3 Coordination/Liaison with Office | |||||||||||
| of the Attorney General, the | |||||||||||
| Office of the Parliamentary | |||||||||||
| Counsel and the Oireachtas on | |||||||||||
| the Bill | |||||||||||
| 6.4 Enactment of the Planning and | |||||||||||
| Development Act 2023 | |||||||||||
| 6.5 Management of programme to | |||||||||||
| update and revise Planning | |||||||||||
| Regulations |
45
| Strategic Goal D: To ensure that planning and building in our regions, communities and maritime area contributes to the delivery | |||||||||||
| of sustainable and balanced development | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| 6.6 Management of all related | |||||||||||
| stakeholder engagement for the | |||||||||||
| review and legislation |

Figure from page 51
Strategic Goal E: In the context of climate change and the impact of weather on Ireland, serve the whole of society through the production
and communication of reliable weather and climate information to protect life and property and to further enhance Met Éireann’s role as
the authoritative voice on meteorology and climatology in Ireland
47
| Strategic Goal E: In the context of climate change and the impact of weather on Ireland, serve the whole of society through the | |||||||||||
| production and communication of reliable weather and climate information to protect life and property and to further enhance Met | |||||||||||
| Éireann’s role as the authoritative voice on meteorology and climatology in Ireland | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| 1. Expand and develop the delivery of authoritative impact- based weather and climate services | 1.1 Develop Met Éireann’s impact- | High quality impact-based weather and warning services Standardized national climate projections for Ireland and associated climate services meeting the Irish adaptation sector’s climate information requirements A wide reach and understanding of Met Éireann’s weather, flooding and climate services across Irish society National Framework for Climate Services (NFCS) established | High quality NWP system forecast capability Expanded impact-based forecast services Enhanced digital delivery of developed pollen/hay fever information services Completion of high resolution regional climate simulations Standardised climate projections provided Publish final TRANSLATE report and commence TRANSLATE 2 Number of climate science training events provided Met Éireann’s website and app is expanded and upgraded | ||||||||
| based weather and warning | |||||||||||
| services and Numerical Weather | |||||||||||
| Prediction (NWP) systems | |||||||||||
| which underpin them | |||||||||||
| 1.2 Run climate models for Ireland | |||||||||||
| and support Irish society in | |||||||||||
| preparing for future weather and | |||||||||||
| climate through translating | |||||||||||
| climate information into specific | |||||||||||
| sectorial services | |||||||||||
| 1.3 Exploit a wide range of | |||||||||||
| engagement and | |||||||||||
| communications pathways, to | |||||||||||
| bring weather and climate | |||||||||||
| impact-based services | |||||||||||
| information to all of Irish society | |||||||||||
| and develop societal | |||||||||||
| understanding of weather, | |||||||||||
| hydrological and climate risks | |||||||||||
| through education |
48
| Strategic Goal E: In the context of climate change and the impact of weather on Ireland, serve the whole of society through the | |||||||||||
| production and communication of reliable weather and climate information to protect life and property and to further enhance Met | |||||||||||
| Éireann’s role as the authoritative voice on meteorology and climatology in Ireland | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| 1.4 Establish the National Framework for Climate Services (NFCS) to support climate resilience planning and decision-makingLead and coordinate Ireland’s engagement with DestinE (DestinE National Coordination Group) | Number of weather services and | ||||||||||
| warnings delivered via multimedia | |||||||||||
| platforms | |||||||||||
| Increased engagement with | |||||||||||
| information provided via Met | |||||||||||
| Éireann’s media platforms | |||||||||||
| Outreach activities expanded on- | |||||||||||
| line | |||||||||||
| Delivery of new graphics | |||||||||||
| production system to support | |||||||||||
| weather and climate information | |||||||||||
| services | |||||||||||
| 2. Establish a new national flood forecasting system | 2.1 Establish a Flood Forecast | Catchment fluvial (river) models for all of the Irish Hydrometric Areas and the introduction of a National Coastal Flood Model (NCFM) Implementation Plan for Stage 2 | The development of 36 Catchment Hydrological models The introduction of a NCFM into Met Éireann’s operational suite of forecast models | ||||||||
| Centre (FFC) in conjunction with | |||||||||||
| the Office of Public Works | |||||||||||
| (OPW) as Stage 1 of a National | |||||||||||
| Flood Forecast Warning Service | |||||||||||
| (NFFWS) | |||||||||||
| 2.2 Move the FFC to an operational | |||||||||||
| footing |
49
| Strategic Goal E: In the context of climate change and the impact of weather on Ireland, serve the whole of society through the | |||||||||||
| production and communication of reliable weather and climate information to protect life and property and to further enhance Met | |||||||||||
| Éireann’s role as the authoritative voice on meteorology and climatology in Ireland | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| 2.3 Produce plan for Stage 2 of the | Successful completion of an Irish version of the Flood Early Warning System Production of an implementation plan for Stage 2 of the NFFWS | ||||||||||
| NFFWS in conjunction with | |||||||||||
| OPW | |||||||||||
| 2.4 Development of the Irish Flood | |||||||||||
| Integrated Communication | |||||||||||
| System and develop a network | |||||||||||
| within the local authorities | |||||||||||
| 3. Maintain and develop expertise and skills and meteorological infrastructure required to deliver on Met Éireann’s strategic goals | 3.1 Ensure Met Éireann’s | Reliable weather and climate data for Ireland Expansion of ICT, infrastructure, aeronautical services and remote sensing capabilities Fully compliant aeronautical weather services certified under EU Regulations by the Competent Authority and designated by the Department of Transport as MET Air Navigation Service Provider | Development of a program of modernisation of the synoptic surface observing network instrumentation and infrastructure Availability of synoptic weather observations at temporal resolution of 10 minutes Installation and expansion of key infrastructure Expansion of climate monitoring to include relevant Essential Climate Variables | ||||||||
| meteorological infrastructure | |||||||||||
| and national climate monitoring | |||||||||||
| network meet the evolving | |||||||||||
| requirements of weather and | |||||||||||
| climate services | |||||||||||
| 3.2 Further integrate third party | |||||||||||
| observations to enable more | |||||||||||
| efficient and effective weather | |||||||||||
| and climate service delivery and | |||||||||||
| continuously improve the quality | |||||||||||
| of observations and forecast | |||||||||||
| services in consultation with | |||||||||||
| aviation users |
50
| Strategic Goal E: In the context of climate change and the impact of weather on Ireland, serve the whole of society through the | |||||||||||
| production and communication of reliable weather and climate information to protect life and property and to further enhance Met | |||||||||||
| Éireann’s role as the authoritative voice on meteorology and climatology in Ireland | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| 3.3 Commence project to modernise | Modernisation of radar network through the installation of a national network of 5 weather radars. Improved rainfall volume and intensity measurements Enhanced predictive capability, knowledge transfer and expertise through co- operation with the international community and increased exchange of high quality satellite, observational and other data Development and roll out of data management portal to expand open data provision | Enhanced flood forecasting capabilities Expansion of Weather Observations Website and the implementation of World Meteorological Organisation Integrated Global Observing System Complete ICT migration and managed service project and modernisation of Meteorological Messaging System (MMS) Installation of 5 new weather radars Move to dual-polisation radar technology Quantitative Precipitation Estimation products to enhance flood forecasting capabilities | |||||||||
| and enhance the rainfall radar | |||||||||||
| network | |||||||||||
| 3.4 Retain designation as Ireland’s | |||||||||||
| meteorological service provider | |||||||||||
| for International Civil Aviation | |||||||||||
| Organisation (ICAO) Annex 3 | |||||||||||
| services. Maintain Aviation | |||||||||||
| Services Division ISO 9001 | |||||||||||
| accreditation | |||||||||||
| 3.5 Enhance support for high impact | |||||||||||
| weather events through | |||||||||||
| strengthened remote sensing | |||||||||||
| capability | |||||||||||
| 3.6 Continue to participate in | |||||||||||
| international meteorological | |||||||||||
| Organisations | |||||||||||
| 3.7 Continuously improve the quality | |||||||||||
| of observations and forecast | |||||||||||
| services in consultation with | |||||||||||
| aviation users |
51
| Strategic Goal E: In the context of climate change and the impact of weather on Ireland, serve the whole of society through the | |||||||||||
| production and communication of reliable weather and climate information to protect life and property and to further enhance Met | |||||||||||
| Éireann’s role as the authoritative voice on meteorology and climatology in Ireland | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| Upgrade of satellite reception | |||||||||||
| systems | |||||||||||
| Modernisation of observation data | |||||||||||
| storage and quality control | |||||||||||
| systems | |||||||||||
| Development of ground-based | |||||||||||
| remote sensing networks | |||||||||||
| Operational implementation of | |||||||||||
| High Performance Computing | |||||||||||
| capacity through the United | |||||||||||
| Weather Service collaboration | |||||||||||
| Aviation Modernisation Automation | |||||||||||
| Project (AMAP), METCOM MMS | |||||||||||
| and Meteorological Self Briefing | |||||||||||
| upgrade project milestones | |||||||||||
| achieved | |||||||||||
| Monthly aviation verification scores | |||||||||||
| meet or exceed ICAO targets |
52
| Strategic Goal E: In the context of climate change and the impact of weather on Ireland, serve the whole of society through the | |||||||||||
| production and communication of reliable weather and climate information to protect life and property and to further enhance Met | |||||||||||
| Éireann’s role as the authoritative voice on meteorology and climatology in Ireland | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| AMAP weather observing systems | |||||||||||
| cleared for operational use by the | |||||||||||
| Regulator | |||||||||||
| Certified accreditation to required | |||||||||||
| industry standards. Increased | |||||||||||
| forecasting capability through | |||||||||||
| collaborative activities | |||||||||||
| Implementation of new a storage | |||||||||||
| infrastructure solution to cater for | |||||||||||
| unstructured Weather data and the | |||||||||||
| creation of a Portal to service | |||||||||||
| external requests for optimal | |||||||||||
| access to the data | |||||||||||
| New data management portal in | |||||||||||
| place | |||||||||||
| Facilities in place to receive, | |||||||||||
| collect and process MTG satellite | |||||||||||
| data |
53
| Strategic Goal E: In the context of climate change and the impact of weather on Ireland, serve the whole of society through the | |||||||||||
| production and communication of reliable weather and climate information to protect life and property and to further enhance Met | |||||||||||
| Éireann’s role as the authoritative voice on meteorology and climatology in Ireland | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| 4. Further development of Met Éireann Research Programme | 4.1 Continue Met Éireann’s Research Programmes through the development of a research funding plan and new schemes | Enhanced national scientific | Increased participation in national and international research programmes Professorship role in place within Irish academia Impactful research programme aligned with Met Éireann’s strategic goals | ||||||||
| and technical capacity in the | |||||||||||
| area of computational science | |||||||||||
| and AI/ML/DL through | |||||||||||
| implementation of Met | |||||||||||
| Éireann’s Research and | |||||||||||
| Scholarship Professorship | |||||||||||
| Programmes | |||||||||||
| Enhanced national scientific | |||||||||||
| and technical capacity in the | |||||||||||
| areas of meteorology, climate | |||||||||||
| science and | |||||||||||
| hydrometeorology through | |||||||||||
| effective implementation of the | |||||||||||
| Met Éireann research | |||||||||||
| fellowship and call | |||||||||||
| programmes and developed | |||||||||||
| research collaboration and | |||||||||||
| funding opportunities |

Figure from page 59
Strategic Goal F: To conserve, protect, manage and present our built, natural
and archaeological heritage, and our biodiversity, for its intrinsic value and
cultural identity, including to the environment as well as a support to local communities, regional economic development and sustainable employment
55
| Strategic Goal F: To conserve, protect, manage and present our built, natural and archaeological heritage, and our biodiversity, for | |||||||||||
| its intrinsic value and cultural identity, including to the environment as well as a support to local communities, regional economic | |||||||||||
| development and sustainable employment1 | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| 1. To promote North- South co-operation, particularly in the context of Waterways Ireland | 1.1 Oversight of Waterways Ireland | Effective co-operation of Waterways Ireland and the Department for Infrastructure (NI) and effective liaison between key stakeholders | Number of North South Ministerial | ||||||||
| through monitoring committee | Council meetings held | ||||||||||
| meetings | |||||||||||
| Quarterly Monitoring Committee | |||||||||||
| 1.2 Facilitate, support and assist in | Meetings held with Waterways | ||||||||||
| advancing the strategies and | Ireland and the Department for | ||||||||||
| goals of Waterways Ireland | Infrastructure NI | ||||||||||
| 2. To conserve, protect | 2.1 Build on existing skills to ensure | Supports for the employment | Number of conservation measures undertaken in National Parks, Nature Reserves and Ireland’s Natura Network The satisfactory conservation status of habitats and species across the country Number of appropriate community projects funded and completed | ||||||||
| and manage our | high standards of planning, | of skilled and experienced | |||||||||
| heritage resources, | management and protection | conservation professionals, | |||||||||
| maximising the | competencies are achieved | craftspeople and | |||||||||
| benefits for biodiversity | tradespersons across the | ||||||||||
| 2.2 Protect, restore conserve and | |||||||||||
| and as a support to | country | ||||||||||
| present heritage sites through | |||||||||||
| local communities, | |||||||||||
| initiatives such as the | Increased engagement across | ||||||||||
| regional economic | |||||||||||
| Community Monuments Fund | society in biodiversity matters | ||||||||||
| development and | |||||||||||
| leading to appropriate | |||||||||||
| sustainable | 2.3 Manage and present our Parks | ||||||||||
| protection of our natural | |||||||||||
| employment while | and Reserves network as areas | ||||||||||
| habitats and species | |||||||||||
| implementing relevant | of biodiversity / environmental |
1 The National Parks and Wildlife Service, an executive agency within the Department, with responsibility for the protection of nature, has recently published its Strategic Plan 2023-2025, setting out its mission, values and key strategic goals. It is available at https://www.gov.ie/en/publication/fbb81-national-parksand-wildlife-service-strategic-action-plan-and-review/
56
| Strategic Goal F: To conserve, protect, manage and present our built, natural and archaeological heritage, and our biodiversity, for | |||||||||||
| its intrinsic value and cultural identity, including to the environment as well as a support to local communities, regional economic | |||||||||||
| development and sustainable employment1 | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| aspects of UN Sustainable Development Goal 15 “Protect, restore and promote sustainable use of terrestrial ecosystems, sustainably manage forests, combat desertification, and halt and reverse land degradation and halt biodiversity loss” | significance and as high value | Prepare data information indicators for relevant reporting streams | Number of structures protected and projects assisted Percentage of actions in the National Biodiversity Action Plan (NBAP) that are fully implemented or fully ongoing; 4th Plan drafted and published Number of local authority biodiversity projects supported by the LBAF | ||||||||
| recreational amenities Manage | |||||||||||
| and present our Parks and | |||||||||||
| Reserves network as areas of | |||||||||||
| biodiversity / environmental | |||||||||||
| significance and as high value | |||||||||||
| recreational amenities | |||||||||||
| 2.4 Implement the Climate Change | |||||||||||
| Adaptation Sectoral Plan and | |||||||||||
| support retrofitting of traditional | |||||||||||
| buildings | |||||||||||
| 2.5 Improved support for research | |||||||||||
| 2.6 Progress the ongoing delivery of | |||||||||||
| actions within the 3rd National | |||||||||||
| Biodiversity Action Plan (NBAP) | |||||||||||
| 2017-2021 and draft the 4th | |||||||||||
| NBAP for publication in 2023 | |||||||||||
| 2.7 Support local authorities in | |||||||||||
| implementing actions for | |||||||||||
| biodiversity through the Local | |||||||||||
| Biodiversity Action Fund (LBAF) |
57
| Strategic Goal F: To conserve, protect, manage and present our built, natural and archaeological heritage, and our biodiversity, for | |||||||||||
| its intrinsic value and cultural identity, including to the environment as well as a support to local communities, regional economic | |||||||||||
| development and sustainable employment1 | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| 3. To ensure greater awareness, appreciation and understanding of Ireland’s rich heritage for its intrinsic value and as a cultural, educational and recreational amenity and also as a valuable resource for business and Ireland’s green image | 3.1 Promote greater awareness of Ireland’s rich built and natural heritage 3.2 Promote cultural, educational and recreational amenities for individuals and communities 3.3 Support and implementation of recommendations of Citizens’ Assembly as appropriate 3.4 Deliver the objectives of Heritage Ireland 2030 | Increased community awareness of the immense inherent value of Ireland’s heritage and biodiversity as an important contributor to national health, wellbeing, economic growth and stakeholder buy-in to its protection Increased activity during National Heritage Week and the Heritage in Schools Scheme | School visits and number of | ||||||||
| students engaged through the | |||||||||||
| national Heritage in Schools | |||||||||||
| Programme | |||||||||||
| Number of events promoted and | |||||||||||
| managed at National Heritage | |||||||||||
| Week | |||||||||||
| Number of local authorities | |||||||||||
| employing a Heritage | |||||||||||
| Officer/Architectural Conservation | |||||||||||
| Officer/ Biodiversity Officer | |||||||||||
| Feedback on visitor experience at | |||||||||||
| heritage sites | |||||||||||
| Number of public engagements | |||||||||||
| and awareness measures | |||||||||||
| supported | |||||||||||
| Number of workshops held to | |||||||||||
| support local authorities | |||||||||||
| Development of guidance for | |||||||||||
| public authorities |
58
| Strategic Goal F: To conserve, protect, manage and present our built, natural and archaeological heritage, and our biodiversity, for | |||||||||||
| its intrinsic value and cultural identity, including to the environment as well as a support to local communities, regional economic | |||||||||||
| development and sustainable employment1 | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| High level of engagement with | |||||||||||
| stakeholders | |||||||||||
| Number of hectares of raised bog | |||||||||||
| restored | |||||||||||
| Number of amenities developed | |||||||||||
| Percentage of conservation target | |||||||||||
| achieved | |||||||||||
| Level of carbon emissions | |||||||||||
| halted/reduced | |||||||||||
| 4. To ensure effective development and implementation of appropriate policies, legislation, actions to comply with EU, national and international heritage obligations | 4.1 Effective discharge of regulatory and statutory functions including enactment of Bills to ensure modern and robust legislative framework for the better protection of Ireland’s heritage 4.2 Implement the new National Heritage Plan - Heritage Ireland 2030 - which will provide a | Adherence to our national, EU | Number of infringement cases brought by EU Commission and what stage in the infringement process; resources allocated to deal with specific cases Number of successful prosecutions by NPWS under Wildlife Acts and Birds and Habitat Regulations | ||||||||
| and international | |||||||||||
| commitments, thereby | |||||||||||
| protecting our reputation and | |||||||||||
| avoiding financial damage | |||||||||||
| Development of appropriate | |||||||||||
| EU and national legislation | |||||||||||
| Implementation of Heritage | |||||||||||
| Ireland 2030 |
59
| Strategic Goal F: To conserve, protect, manage and present our built, natural and archaeological heritage, and our biodiversity, for | |||||||||||
| its intrinsic value and cultural identity, including to the environment as well as a support to local communities, regional economic | |||||||||||
| development and sustainable employment1 | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| framework for heritage for the next decade 4.3 Continued implementation of the NPWS Strategic Action Plan including a review of NPWS staffing levels, compared to similar organisations, by the international expert group 4.4 Meet all international heritage obligations at EU, UNESCO and Council of Europe (CoE) 4.5 Progress further UNESCO World Heritage designations for Irish Tentative List Sites 4.6 Oversee the implementation of the 1954 Hague Convention for the Protection of Cultural Property during Armed Conflict | Implementation of actions due for completion in 2023 and 2024 Publication of staffing review by international expert group Publication of a World Heritage Strategy for Ireland and World Heritage Guidelines issued Representation is provided at States Parties meetings for relevant UNESCO cultural conventions Representation is provided at relevant EU, UNESCO and CoE meetings on cultural heritage | Number of court cases, including | |||||||||
| EU, against the | |||||||||||
| NPWS/Department | |||||||||||
| Number of statutory instruments | |||||||||||
| produced | |||||||||||
| Number of Ministerial directions | |||||||||||
| and Restoration Orders issued, as | |||||||||||
| required | |||||||||||
| Progress of World Heritage | |||||||||||
| Tentative List and Implementation | |||||||||||
| of World Heritage Sites | |||||||||||
| Management Plans | |||||||||||
| World Tentative List nomination | |||||||||||
| dossiers developed and submitted | |||||||||||
| to the World Heritage Centre | |||||||||||
| Progress of Bills through | |||||||||||
| Oireachtas | |||||||||||
| Number of actions fully | |||||||||||
| implemented. |
| Strategic Goal F: To conserve, protect, manage and present our built, natural and archaeological heritage, and our biodiversity, for | |||||||||||
| its intrinsic value and cultural identity, including to the environment as well as a support to local communities, regional economic | |||||||||||
| development and sustainable employment1 | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| Progress in implementation of | |||||||||||
| Heritage Ireland 2030 | |||||||||||
| Timely transposition of EU | |||||||||||
| Directives | |||||||||||
| Number of meetings of the | |||||||||||
| National Advisory Committee on | |||||||||||
| Protection of Cultural Property in | |||||||||||
| the Event of Armed Conflict (NAC) | |||||||||||
| Number of UNESCO and CoE | |||||||||||
| cultural convention meetings | |||||||||||
| attended |
61

Figure from page 66
Strategic Goal G: To provide a framework that assists the Department, local authorities and agencies to enhance digital services and accelerate, alongside
our partners, the implementation of the United Nations Sustainable Development Goals (SDGs) through the use of data and digital technologies
62
| Strategic Goal G: To provide a framework that assists the Department, local authorities and agencies to enhance digital services | |||||||||||
| and accelerate, alongside our partners, the implementation of the United Nations Sustainable Development Goals (SDGs) through | |||||||||||
| the use of data and digital technologies | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| 1. Support the Implementation of the Connecting Government 2030: A Digital and ICT Strategy for Ireland’s Public Service | 1.1 Engage with stakeholders | Promoting, guiding and driving organisational change around service orientation and customer needs through service innovation and service design around customer needs Effective and cohesive measures to address data and digital service fragmentation across systems and processes by developing a standard ecosystem of integrated digital building blocks Identification and cross- departmental agreement on the key actions needed to deliver consistent, better integrated end-to-end digital services across the | Targets for organisational change and service improvement through technology Digital Maturity Level Targets for digital services delivery Targets for housing and heritage related data Data Maturity Level Targets for cybersecurity compliance Improved delivery of digital and ICT projects Project Management Maturity Level Roles and responsibilities identified | ||||||||
| across relevant Government | |||||||||||
| departments, local authorities | |||||||||||
| and agencies as well as relevant | |||||||||||
| industry and representative | |||||||||||
| bodies in the development of a | |||||||||||
| Digital Strategy for 2030 for the | |||||||||||
| Department which is aligned | |||||||||||
| with the Connecting | |||||||||||
| Government 2030 strategy | |||||||||||
| 1.2 Implement key measures | |||||||||||
| detailed in the Connecting | |||||||||||
| Government 2030 strategy to | |||||||||||
| enable 90% of applicable | |||||||||||
| services provided by the | |||||||||||
| Department to be consumed | |||||||||||
| online by 2030 | |||||||||||
| 1.3 Enhance the evidence base | |||||||||||
| through increased access to | |||||||||||
| data and especially housing | |||||||||||
| data by implementing the | |||||||||||
| measures detailed in the first |
| Strategic Goal G: To provide a framework that assists the Department, local authorities and agencies to enhance digital services | |||||||||||
| and accelerate, alongside our partners, the implementation of the United Nations Sustainable Development Goals (SDGs) through | |||||||||||
| the use of data and digital technologies | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| sprint of the Data Strategy; | Department, local authorities and agencies Timely housing data available in a single source to monitor progress on Housing for All A ‘single source of truth’ reference point for all metadata - data about data An improved project delivery capability Increased availability of heritage data and digital services Increased Cloud footprint | ||||||||||
| develop the second sprint of the | |||||||||||
| data strategy towards 2030 with | |||||||||||
| a focus on data standardization | |||||||||||
| 1.4 Explore and pilot technologies | |||||||||||
| that will enhance data collection | |||||||||||
| and analysis to help accelerate | |||||||||||
| the implementation of the UN | |||||||||||
| SDGs | |||||||||||
| 1.5 Raise the project management | |||||||||||
| adoption maturity level to assist | |||||||||||
| in the delivery of digital & ICT | |||||||||||
| solutions across the Department | |||||||||||
| 1.6 Develop and implement the | |||||||||||
| Heritage Digital Transformation | |||||||||||
| Programme to support the | |||||||||||
| Heritage Ireland 2030 strategy | |||||||||||
| 2. Support local | 2.1 Support and advice local | A shared approach to digital services delivery across local authorities | A shared Digital and ICT Strategy towards 2030 for the Local Government Sector | ||||||||
| authorities with a | authorities to develop and | ||||||||||
| range of initiatives | implement a cross sectoral | ||||||||||
| aimed at delivering | Digital & ICT Strategy towards |
64
| Strategic Goal G: To provide a framework that assists the Department, local authorities and agencies to enhance digital services | |||||||||||
| and accelerate, alongside our partners, the implementation of the United Nations Sustainable Development Goals (SDGs) through | |||||||||||
| the use of data and digital technologies | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| efficiencies through digital and ICT technologies and to provide better digital services to citizens | 2030 to deliver enhanced digital | Local Government Management Agency (LGMA) having an enhanced co- ordination and support role for digital and ICT services in the Local Government sector A roadmap for the development of an integrated national social housing digital platform shared across local authorities A roadmap for the development of an integrated national planning applications solution shared across local authorities Modernisation of data collection processes A framework for increasingly deploying cybersecurity | Targets for organisational change and service improvement through technology Digital Maturity Level Targets for digital services delivery Targets for the number of applications for social housing through digital channels Targets for the number of end-to- end planning applications processed through digital channels Targets for cybersecurity compliance | ||||||||
| services to citizens and improve | |||||||||||
| operations | |||||||||||
| 2.2 Support local authorities to | |||||||||||
| design, develop and implement | |||||||||||
| a roadmap for a National Social | |||||||||||
| Housing digital solution to | |||||||||||
| streamline the housing | |||||||||||
| application, assessment and | |||||||||||
| allocation processes, the | |||||||||||
| tenancy management and | |||||||||||
| housing maintenance processes | |||||||||||
| 2.3 Support local authorities and | |||||||||||
| coordinate across relevant | |||||||||||
| agencies the design, | |||||||||||
| development and | |||||||||||
| implementation of a National | |||||||||||
| Planning Applications digital | |||||||||||
| solution and enhance the | |||||||||||
| building control management | |||||||||||
| system to streamline the | |||||||||||
| planning application process, |
| Strategic Goal G: To provide a framework that assists the Department, local authorities and agencies to enhance digital services | |||||||||||
| and accelerate, alongside our partners, the implementation of the United Nations Sustainable Development Goals (SDGs) through | |||||||||||
| the use of data and digital technologies | |||||||||||
| Key Objectives | Actions | Outcomes | Indicators | ||||||||
| standardize and streamline data | defence measures across all local authorities | ||||||||||
| collection and provide a | |||||||||||
| consistent and more efficient | |||||||||||
| digital service for citizens | |||||||||||
| 2.4 Support local authorities to grow | |||||||||||
| and enhance their cybersecurity | |||||||||||
| capabilities |
Supporting the Delivery of Our Goals
The Department will, through the implementation of a range of initiatives, support its
people to deliver the Strategic Goals. The Department will continue to focus on
adapting and improving its structures and processes so that its organisational
structure, culture, governance, processes and technology, together with a learning
culture, support the delivery of the Strategy.
Through the delivery of the Workforce Plan to support this Statement of Strategy, the
Department will have an agile, able and highly motivated workforce to meet
requirements. An evaluation of the Department’s current People Strategy will take
place and the successful actions will be built upon in a successor strategy to further
embed staff-led wellbeing and engagement initiatives, and identify current and future
Learning and Development needs. The Department will continue to enhance and
develop the leadership skills and capability of its staff, throughout the organisation, to
allow them to perform as individuals and in teams.
The Department will continue to provide robust financial and budgetary services and
to enhance and promote good corporate governance, with a dedicated Internal Audit
Unit to provide scrutiny across the Department. Compliance with corporate
legislation will continue in areas such as Health and Safety, Accessibility, Data
Protection, information access regimes, Official Languages and Human Rights and
Equality obligations. Working with the Office of Public Works, we will continue to
ensure that the Department’s facilities are fit for purpose and provide a safe working
environment.
The Department is committed to transparency and public engagement. Through its
Communications team, it will seek to ensure that the public are fully aware of the
services, grants and supports available to them and it will provide information and
assistance to the public and media on request and in a timely manner.
Through ongoing collaboration with the Office of the Government Chief Information
Officer, the Department will continue to invest in its ICT resources to enable efficient
and effective processes to be developed and implemented throughout the period of
this Statement of Strategy. The appointment of a Chief Information Officer to the
Department has enhanced this work and drives a culture of innovation, working
towards Digital Transformation 2030 across the Department. The Department’s first
ever Data Strategy has been published on the Department website at Data Strategy
Foundations Sprint 2021 - 2024. The mission of our data strategy is to revolutionise
how we, our partners and citizens access the trusted data we need, when we need
it, and to use data to make better smarter decisions today, to build a more
sustainable future tomorrow. In line with the Official Languages (Amendment) Act
2021, our Data Strategy has been published simultaneously in both English and Irish
on gov.ie.
The Department has a central role in ensuring sustainable water management and
Ireland’s forthcoming third River Basin Management Plan sets out how we will
protect, improve and sustainably manage our water environment to 2027, in
implementation of the EU Water Framework Directive (WFD) and UN SDG 6 Clean
Water and Sanitation.
The National Parks and Wildlife Service, an executive agency within the Department,
with responsibility for the protection of nature, has recently published its Strategic
Plan 2023-2025, setting out its mission, values and key strategic goals. It is available
here https://www.gov.ie/en/publication/fbb81-national-parks-and-wildlife-service-
strategic-action-plan-and-review/.
We will collaborate with other departments and agencies to advance our strategic
objectives. As an accountable department for PEACEPLUS we will seek to further
develop our relationship with colleagues in Northern Ireland, through shared
knowledge and cooperation that is of benefit to communities on both sides of the
border.
Oireachtas Engagement
The Department regularly engages with Oireachtas Committees, Cabinet
Committees, inter-departmental groups and other state bodies in order to improve
service delivery to the public. This engagement will continue and improvements will
be made to processes throughout the term of this Statement of Strategy.
Challenges, Risks and Opportunities
The key challenges, risks and opportunities in our operating environment in the
period 2023-2025 will be:
The War in Ukraine, Rising Interest Rates & Cost of Construction - The past
year has seen some extraordinary challenges arising from the war in Ukraine, the
energy crisis, and rising interest rates. Construction cost inflation has been an
element of overall inflation arising from the invasion of Ukraine. Wholesale prices for
construction materials rose by almost 17.5% in 2022 when compared with 2021.
Construction cost inflation has also been driven by factors such as pandemic related
stoppages, depleted inventories, rising wages and Brexit-related transport issues.
Energy prices have soared. Interest rates are rising. These cost pressures make
homes costlier and slower to build. Those who finance and build face greater risks
than they did one year ago. Particular headwinds are being faced in the delivery of
apartments to buy or rent and challenges have been experienced in the delivery of
affordable homes.
Brexit – The implications of the UK exit from the EU will continue to be monitored
carefully to manage the impact on the Department’s business, particularly in regard
to the potential disruption to trade in construction products and transboundary
engagement across many of our areas of responsibility.
Working relationships with other Departments and Public Sector Bodies – The
Department will continue to develop the constructive working relationships built up
with key departments and other bodies, including through networks, to achieve the
objectives in this Strategy.
Public Service Reform / Civil Service Renewal – The Department will continue to
contribute to the delivery of public service reform objectives, including with respect
to the evolution of the workplace and ways of working, post-pandemic.
Digital Services and Innovation – The Department will continue to seek new ways
to deliver our mandate using digital platforms identified through the Government’s
programme of digital transformation and will encourage digitisation of services in the
local government sector and in our body of agencies.
Project Díon - A new technological solution is being developed for the management
and reporting of housing programmes operated by the Department.
Once implemented, the new Díon system should enhance, improve and standardise
processes, modernise and maximise the benefits of available technologies, improve
data management and reporting and ensure better information flows between the
Department, local authorities and other key stakeholders involved in housing delivery
including real-time data access. By bringing about changed ways of working
underpinned by technology solution, the system will support the implementation of
the digital agenda as provided for in Housing for All – specifically section 5.4.3 and
action 24.2: “promote the digitalisation of housing and planning services, to improve
the efficiency of delivery and customer services.”
Nature Conservation and Protection – The Department will continue to conserve
and protect nature in line with national and EU legislative requirements and will seek
to mitigate to the greatest extent possible the impact of any proceedings against
Ireland regarding the implementation of nature legislation.
Climate Action
Climate change is one of the most profound challenges we face globally. Tackling
this challenge requires substantial reductions in carbon emissions across all sectors
of the economy, and initiatives to protect and promote biodiversity, improved water
quality and water security and national heritage. Ireland is committed to becoming
one of the leaders in responding to climate disruption.
The all of Government Climate Action Plan identifies the nature and scale of the
challenge facing Ireland and charts a course towards ambitious targets for sectors
including the Built Environment, the Circular Economy, Transport, Agriculture, Land
Use, Land Use Change, Forestry and the Marine Environment. Delivering this
integrated set of actions and policies requires a high level of collaboration across
Government to achieve 51% reduction in Ireland’s overall Green House Gas (GHG)
emissions from 2021 to 2030 as set out in the Programme for Government - Our
Shared Future. These legally binding objectives are set out in the Climate Action and
Low Carbon Development (Amendment) Act 2021.
To assist public sector bodies in meeting their targets, the Climate Action Plan 2021
(CAP 21) and subsequent CAP 23 committed that all public sector bodies (with some
exceptions) will complete Climate Action Roadmaps. The Climate Action Roadmap
communicates how each public body aims to meet the requirements of the Climate
Action Mandate 2022 and reach its 2030 carbon and energy efficiency targets. This
roadmap will assist the Department in achieving its overall 2030 targets to improve
energy efficiency by 50% over the 2009 baseline and to reduce CO2 emissions by
51% over their 2016-2018 average baseline. The Climate Action Roadmap is
currently being developed and will be updated annually.
The Department has a key role in supporting the creation of the regulatory
framework and support for Climate Action. We have already completed a number of
actions including the introduction of Nearly Zero Energy Buildings performance
standards for new dwellings, new planning permission exemptions for rooftop solar
panels on homes and other buildings, a Water Quality and Infrastructure Sectoral
Adaptation Plan,a Built and Archaeological Heritage Sectoral Adaptation Plan and
the Department funds an ongoing programme of Social Housing Retrofit. We have
implemented the Maritime Area Planning Act 2021 to provide the biggest reform of
marine governance in the history of the State – including the establishment of the
Marine Area Regulatory Authority (MARA). At area level planning the Department
provides guidance for compact urban development facilitating public transport,
district heating and higher housing densities through the implementation of the
National Planning Framework. At a national level the Department is enabling the
provision of offshore and onshore renewable energy.
Climate change is exacerbating both water scarcity and water-related hazards (such
as floods and droughts), as rising temperatures disrupt precipitation patterns and the
entire water cycle. However, water can fight climate change. Sustainable water
management is central to building the resilience of societies and ecosystems and to
reducing carbon emissions. The Department has a central role in ensuring
sustainable water management and Ireland’s River Basin Management Plan 2022-
2027 sets out how we will protect, improve and sustainably manage our water
environment to 2027, in implementation of the EU Water Framework Directive (WFD)
and UN Strategic Development Goal (SDG) 6 Clean Water and Sanitation.
Met Éireann has a central role in meeting the challenges of detecting, monitoring,
understanding, modelling, predicting, communicating, mitigating and adapting to
human-induced climate change. Its depth of knowledge and experience with regard
to protecting public safety and societal wellbeing as well as providing access to its
world-wide, knowledge-leading networks and international meteorological
organisations will have a key role in informing the measures required.
The Department recognises the leadership role that local authorities play in
implementing mitigation and adaptation measures at a local and regional level and
will continue to support local authorities in this important role in co-operation with the
Department of Environment, Climate and Communications and the Climate Action
Regional Offices.
We will continue to conserve and protect nature in line with national and EU
legislative requirements and will seek to mitigate to the greatest extent possible the
impact of any proceedings against Ireland regarding the implementation of nature
legislation.
Addressing climate breakdown and biodiversity loss are priorities for the Department
and underpin key policy areas across the Department including:
Project Ireland 2040 - National Planning Framework
Planning legislation and guidelines
Built Environment
Social Housing Retrofit
Local Government
Met Éireann
Water Services and Water Quality management
Heritage
Peatland rehabilitation
Biodiversity
The Department will deliver key legislative and implementation measures to tackle
climate change under the Programme for Government, the Climate Action Plan and
EU Directives.
Public Sector Human Rights and Equality Duty
Under the Irish Human Rights and Equality Commission Act 2014 the Department is
required to set out in its strategic plan an assessment of the human rights and
equality issues it believes to be relevant to its functions and purpose, and the actions
it is taking or proposes to take to address those issues.
The Department has undertaken an assessment of the human rights and equality
issues it believes are material to the execution of its functions. The following are the
most pertinent aspects of its business to which human rights and equality
considerations apply and the actions the Department will take to address these.
| Areas to which Human Rights | Plans and policies to address these issues including: | ||
| and Equality considerations | |||
| apply | |||
| Accessibility, Universal Design and Reasonable Accommodation of disabled people for employees and visitors to the Department | The Internal Accessibility Working Group to implement the management board approved action plan to address accessibility barriers | ||
| Promotion and support of human rights and equality principles as they apply to the Department’s staff | Ongoing training in the area and review of relevant policies to ensure equality of opportunity for all | ||
| Work to ensure that elections/referendums are accessible to all | The establishment of a Working Group on Disability Voting to improve accessibility to polling stations and examine measures to further improve voting accessibility | ||
| Ensure that appropriate policies are developed and a strategic framework put in place to meet the accommodation needs of older people | Continue to oversee and support the implementation of the actions relating to housing for older people within Housing for All | ||
| Put in place a strategy/framework for disabled people, to enable them to have | Work with stakeholders to implement the National Housing Strategy for Disabled People 2022-2027 |
| Areas to which Human Rights | Plans and policies to address these issues including: | ||
| and Equality considerations | |||
| apply | |||
| equal opportunities to apply for housing support services | |||
| Ensure that the housing needs of the Traveller Community are met by local authorities | A Programme Board has been set up to consider and implement the recommendations of the Traveller Accommodation Expert Review report and ensures that regular updates on progress are published on the Department’s website at https://www.gov.ie/en/publication/37910- traveller-accommodation-expert-review- programme-board-update/ |
The Department periodically reports on actions taken to address the issues identified
in this assessment in its Annual Report.
Appendix 1 – Structure of the Department
The Department’s Management Board comprises the Secretary General and the
Assistant Secretaries and equivalents. It operates in support of the Ministers and the
Secretary General in their statutorily prescribed roles by:
assisting and advising (together with other arrangements for this purpose) in
policy development and coordination;
monitoring the implementation of policies and programmes by the Department
and our delivery partners, particularly in relation to issues requiring cross-
divisional, inter-departmental and multi-stakeholder co-operation; and
overseeing the adherence to corporate governance requirements and promoting
the development and improved performance of the Department’s organisation
through a range of functions.
Further details on the Department’s Management Board and structure can be viewed
Appendix 2 Programme for Government – Our Shared Future
The Programme for Government – Our Shared Future provides the foundation for
this Statement of Strategy. Follow this link to the Department of the Taoiseach’s
website to download the Programme for Government.
Appendix 3 – Agencies and Bodies under the Aegis of the Department
The Department is committed to working within a network of associated agencies,
local authorities, other Government departments and public bodies to deliver on the
objectives of Government. We work particularly closely with the 31 local authorities
and with the bodies listed here (and their subsidiaries) under the aegis of the
Department.
| Agencies and Bodies under the Aegis of the Department | |||
| An Bord Pleanála | www.pleanala.ie/ | ||
| An Fóram Uisce (the Water Forum) | www.thewaterforum.ie | ||
| Approved Housing Bodies Regulatory Authority | www.ahbregulator.ie | ||
| Docklands Oversight and Consultative Forum | www.dublindocklands.ie | ||
| Designated Area Appeals Advisory Board | www.npws.ie | ||
| Electoral Commission | www.electoralcommission.ie | ||
| Ervia | www.ervia.ie | ||
| Gas Networks Ireland | www.gasnetworks.ie/home | ||
| Heritage Council | www.heritagecouncil.ie | ||
| Housing Finance Agency | www.hfa.ie | ||
| Housing and Sustainable Communities Agency | www.housingagency.ie | ||
| Land Development Agency | www.lda.ie | ||
| Local Government Management Agency | www.lgma.ie | ||
| National Oversight and Audit Commission | www.noac.ie | ||
| National Traveller Accommodation Consultative Committee | www.housing.gov.ie | ||
| Office of the Planning Regulator | www.opr.ie | ||
| Pyrite Resolution Board | www.pyriteboard.ie | ||
| Residential Tenancies Board | www.rtb.ie |
| Agencies and Bodies under the Aegis of the Department | |||
| Tailte Éireann2 | www.tailte.ie | ||
| - Ordnance Survey Ireland | www.osi.ie | ||
| - Property Registration Authority | www.prai.ie | ||
| - Valuation Office | www.valoff.ie | ||
| Uisce Éireann3 | www.water.ie | ||
| Valuation Tribunal | www.valuationtribunal.ie | ||
| Waterways Ireland | www.waterwaysireland.org |
*Water Advisory Board was dissolved on 28th April 2023
2 Tailte Éireann was established on 1 March 2023 from a merger of Ordnance Survey Ireland, Property Registration Authority and the Valuation Office
3 Irish Water’s name changed to Uisce Éireann on 31 December 2022, by way of section 5 of the Water Services (Amendment) Act 2022
Glossary
ABP An Bord Pleanála

Figure from page 83
AHBRA Approved Housing Bodies Regulatory Authority

Figure from page 83
ASSAP Agriculture Sustainability Support and Advisory Programme

Figure from page 83
CALF Capital Advance Leasing Facility

Figure from page 83
CIRI Construction Industry Register Ireland

Figure from page 83
CJEU Court of Justice of the European Union

Figure from page 83
CSO Central Statistics Office

Figure from page 83
DCB Defective Concrete Blocks

Figure from page 83
EIA Environmental Impact Assessment

Figure from page 83
EPBD Energy Performance of Buildings Directive

Figure from page 83
FFC Flood Forecast Centre

Figure from page 83
HAP Housing Assistance Payment

Figure from page 83
ISO International Organization for Standardization

Figure from page 84
LBAF Local Biodiversity Action Fund

Figure from page 84
LGMA Local Government Management Agency

Figure from page 84
LIHAF Local Infrastructure Housing Activation Fund

Figure from page 84
MARA Marine Area Regulatory Authority
| METCOM | Meteorological Contour Matching (meteorological data can be | ||
|---|---|---|---|
| contoured and matched in real-time by using meteorological | |||
| sensors on board a missile or aircraft) |
MMS Meteorological Messaging System

Figure from page 84
MSFD Marine Strategy Framework Directive

Figure from page 84
NBAP National Biodiversity Action Plan

Figure from page 84
NDP National Development Plan

Figure from page 84
NPF National Planning Framework

Figure from page 84
NSMC North South Ministerial Council

Figure from page 84
OPR Office of the Planning Regulator

Figure from page 84
ORE Offshore Renewable Energy
| OSPAR | Oslo & Paris (original Conventions) | ||
|---|---|---|---|
| Protection of the Marine Environment In The North Atlantic |
RAS Rental Accommodation Scheme

Figure from page 85
RTB Residential Tenancies Board

Figure from page 85
UN SDGs United Nations Sustainable Development Goals

Figure from page 85
URDF Urban Regeneration and Development Fund

Figure from page 85
gov.ie/housing
The Department of Housing, Local Government and Heritage
Pages 15–86 · View in original PDF