Public Sector Climate Action Mandate

The Public Sector Climate Action Mandate applies to all bodies covered by decarbonisation targets, except for Local Authorities, Commercial Semi-State Bodies, and the School Sector. The mandate highlights the main climate action objectives for public bodies and will be reviewed annually. All public sector bodies are encouraged to avail of the SEAI’s Partnership Programme, irrespective of whether the mandate applies or not. Support is available for implementing the mandate and for climate action more generally.

Our Targets

1.1. Reduce energy related GHG emissions by 51% in 203061;

1.2. Improve energy efficiency in the public sector by 50% by 2030;

1.3. Update Climate Action Roadmaps annually within 6 months of the publication of the Climate Action Plan. Develop Climate Action Roadmaps if none are in place.

Our People

2.1. Establish and resource Green Teams, reporting to senior management, to become integrated drivers of sustainability in every public sector body;

2.2. Nominate a member of the Management Board as the Climate and Sustainability Champion with responsibility for implementing and reporting on the mandate;

2.3. Incorporate appropriate climate action and sustainability training (technical and behavioural, including green procurement training) into learning and development strategies for staff;

2.4. Organise staff workshops (at least annually) to engage on climate issues, including a focus on decreasing the organisation’s carbon footprint;

2.5. Ensure all senior management (P.O. level or equivalent and above) and members of State Boards62, complete a climate action leadership training course.

61Target related to energy-related emissions

62Members of state boards of state bodies that are subject to the Public Sector Climate Action Mandate.

Our Way of Working

3.1. Report on the following in the Annual Report of the public sector body;

– GHG emissions

– Implementation of the mandate

– Sustainability activities

– Compliance with Circular 1/2020: Procedures for offsetting the emissions associated with official air travel

3.2. Using SEAI’s Public Sector M&R System, public bodies are to report annually on implementation of the individual mandate requirements using a “comply and explain” approach;

3.3. Achieve formal environmental certification for large public sector bodies, such as ISO 50001 (Energy Management Standard) or ISO 14001 (Environmental Management System), with a view to going beyond ISO 14001 to adopting Eco Management and Audit Scheme (EMAS). Specifically;

3.3.1. All public sector bodies with an energy spend greater than €2 million per annum to achieve ISO 50001 certification by end-2024;

3.3.2. All remaining public bodies to implement energy management programmes as per SEAI’s energy management guidance (S.I. 426 of 2014) and report to SEAI annually on its M&R system.

3.4. Green Public Procurement

3.4.1. Implement Green Public Procurement in accordance with the Green Public Procurement Implementation Mandate set out in Buying Greener: Green Public Procurement Strategy and Action Plan 2024–2027, using the EPA Green Public Procurement Guidance and criteria/Office of Government Procurement’s online Green Public Procurement Criteria Search tool as resources;

3.4.2. Adhere to the new circular, which will replace Circular 20/2019, to be published by the Department of Public Expenditure, NDP Delivery and Reform regarding new Green Public Procurement obligations included in the GPP Strategy and Action Plan 2024–2027.

3.5. Construction

3.5.1. Specify low carbon construction methods and low carbon cement material as far as practicable as per guidance issued by Department of Enterprise, Trade and Employment for directly procured or supported construction projects from 2024:

3.5.2. Adhere to the best practice guidelines for the preparation of Resource and Waste Management Plans for construction and demolition projects for directly procured or supported construction projects from 202463;

3.5.3. A minimum proportion of construction materials procured by public bodies under new contract arrangements to comprise recycled materials, that is informed by a Circularity Roadmap for the Construction Sector and the 2nd Whole of Government Circular Economy Strategy to be published in 202564.

Organic Food

3.6.1. A minimum of 10% by value (€) of food sought under new contract arrangements (including via contractors such as canteen service providers), is to be certified organic in each of the following categories of Cereals, fresh Beef, Lamb, Pork, Poultry, Fish, Vegetables and Dairy products, where possible.

Food Waste

3.7.1. Measure and monitor the food waste generated on premises from 2024, using a standardised approach to food waste measurement set out in the EPA public sector guidance;

3.7.2. All new contract arrangements related to canteen or food services, including events and conferences, to include measures that are targeted at addressing food waste (with a specific focus on food waste prevention and food waste segregation) taking into account Ireland’s commitment to reduce food waste by 50% by 2030.

ICT Equipment

3.8.1. A minimum of 80% of ICT end user products (desktop computers, portable computers and mobile phones) procured by public sector bodies under new contract arrangements are certified to EPEAT Gold Standard (or equivalent), TCO Certified (or equivalent) or will have been remanufactured.

Paper

3.9.1. Review any paper-based processes and evaluate the possibilities for digitisation so it becomes the default approach. Eliminate paper-based processes as far as is practicable. Where office paper for printing and photocopying must be procured, 100% of the paper must be recycled paper;

3.9.2. Measure and monitor paper consumption.

63EPA Best Practice Guidelines for the preparation of resource & waste management plans for construction and demolition projects: https://www.epa.ie/publications/circular-economy/resources/ CDWasteGuidelines.pdf

64This target will be updated following further data analysis, and publication of the 2nd Whole of Government Circular Economy Strategy which will include sectoral targets in relation to the construction sector.

3.10. Water

3.10.1. Provide suitable drinking water refill points for all staff and in any premises accessed by the public;

3.10.2. Measure and monitor total water usage for the organisation as a whole.

3.11. Single Use

3.11.1. Cease using disposable cups, plates and cutlery in any public sector canteen or closed facility, excluding clinical (i.e. non-canteen healthcare) environments, and in publicly funded advertising or broadcasting;

3.11.2. Eliminate all single use items within the organisation and from events organised, funded, or sponsored.

3.12. Other Materials

3.12.1. Support Ireland’s Producer Responsibility Initiatives in the collection and recycling of products including the Deposit Return Scheme65;

3.12.2. Contract waste collection services that are segregated into a minimum of 3 streams – residual/general waste, recycling waste and organic/biowaste and monitor weights collected.

Our Buildings and Vehicles

4.1. Promote the use of bicycles (including push bikes, electric bikes, and cargo bikes) and shared mobility options as an alternative to car use among employees and visitors by creating and maintaining facilities (both inside and outside of buildings) that support such options, including secure and accessible bicycle parking, shared mobility parking, and charging stations, as appropriate, with a view to achieving the National Transport Authority’s Smarter Travel Mar;

4.2. Phase out the use of parking in buildings that have access to a range of public transport services and active/shared mobility options for the majority of staff/ visitors, while providing that sufficient accessible parking is maintained for those with physical mobility issues;

4.3. Display an up-to-date Display Energy Certificate in every public building that is open to the public to clearly show energy use.

65Extended Producer Responsibility (EPR): https://www.gov.ie/en/publication/63441-extended-producerresponsibility/

4.4. The public sector will not install heating systems that use fossil fuels after 2023, in (1) new buildings, and (2) “major renovation” retrofit projects as defined in the Energy Performance of Buildings Directive (EPBD) unless at least one of the following exceptions applies;

– The fossil-fuel use is only through using electricity from the grid

– There is no technically viable non-fossil alternative (generally only related to applications for a purpose other than space heating)

– The installation of a renewable space heating system would increase final CO2 emissions

– The fossil-fuel use is provided for backup, peaking, or operational purposes (and makes up less than 10% of annual heating energy)

– Where the direct replacement of existing fossil fuel heating is required for an emergency maintenance purpose

4.5. All tenders for the public procurement of energy-related products, heating equipment, or indoor and outdoor lighting to include a requirement for tenderers to specify recommendations and options for the product, when the product or components of the product comes to the end of life, that consider environmental sustainability, including options for reuse, repair, and recycling. Comply with SI 626 of 2016 to procure Triple E registered products or equivalent;

4.6. All tenders for the public procurement of indoor cleaning services to include a requirement for tenderers to specify the training that will be put in place to ensure that all staff involved in delivery of the contract have the knowledge and skills to apply cleaning methods, which will reduce the environmental impact of the services;

4.7. Buildings

4.7.1. Building stock plans – all public bodies that have not yet completed a stage 1 Building Stock Plan should do so and submit to SEAI. Public bodies that have completed a BSP should update it regularly, minimum every two years. Public bodies are encouraged to include their BSPs in their Climate Action Roadmaps;

4.7.2. National Estate Portfolio Leads are accountable for energy targets within their sectors and for developing pathways to achieve these targets. For example, in relation to the Civil Service, the OPW will plan the deep retrofit of Government Departments’ building stock. The specific sectors are outlined in the stage 1 Building Stock Guidance. These National Estate Portfolio leads (NEPLs) will undertake Stage 2 Building Stock plans for their respective sectors. They shall develop plans and roadmaps of how they and their respective sectors will address national and upcoming EU EPBD and EED directive targets, considering both the short term actions (towards 2030 targets) and long term vision (to 2050 net zero). SEAI will work with the NEPLs and National Working Group on Decarbonising Public Buildings to develop guidance for Stage 2 BSP. With a view to sectors completing initial plans and roadmaps by the end of 2025, SEAI’s Monitoring and Reporting system will be enhanced to track national and relevant EU directive targets at NEPL level;

4.7.3. Small public sector bodies should include a basic building stock analysis or statement as part of their Climate Action Roadmap, in line with the guidance published by SEAI.

Vehicles

Procure (purchase or lease) only zero-emissions vehicles from the end of 2022, enabling Ireland to go beyond the requirements of the EU Directive, amending Directive 2009/33/ EC on the promotion of clean and energy-efficient road transport vehicles (EU Directive 2019/1161, the Clean Vehicle Directive) and act as an international leader in this area. An exception applies where the vehicle is exempt under European Communities (Clean and Energy-Efficient Road Transport Vehicles) (Amendment) Regulations (S.I. 381 of 2021)66. Public sector procurement contracts for delivery and haulage should specify zero-emissions vehicles where possible.

4.8.1. As an enabler for the switch to zero-emissions vehicles and meeting Climate Action Plan targets, in 2024 public sector bodies with a vehicle fleet should develop a plan for installation of charging infrastructure in relevant locations. The plan should align installation of infrastructure with timelines for decarbonisation of the body’s fleet. The plan should be included in the body’s Climate Action Roadmap.

66Major manufacturers have indicated their commitment to increasing the availability of e-trucks to the market by mid-decade. However, it is acknowledged that it may not be possible to procure the desired number or variety of zero emission heavy-duty vehicles until the second carbon budgetary period (2026– 2030). Depending on market developments, public sector bodies should, at the least, ensure to procure (purchase or lease) ‘Clean Vehicles,’ in accordance with the EU Clean Vehicles Directive, to meet their heavy-duty vehicle targets.

Figure from page 188

Figure from page 188

Pages 182–188 · View in original PDF