Transport Infrastructure Ireland
FOI Requests — 701 records (page 8 of 15)
- Received 27 November 2017Decided 21 December 2017GrantedTransport Infrastructure Ireland
Request for Scrim test results for a section of the N13 from 2014 to 2016.
- Received 23 November 2017Decided 20 December 2017GrantedTransport Infrastructure Ireland
Request for Scrim test results on the N30 between New Ross and Clonroche adjacent to Corcoran's Cross for the years 2014 to 2017.
- Received 15 August 2017Decided 9 December 2017RefusedTransport Infrastructure Ireland
Request for Luas video footage (CCTV) from the Luas cab drivers perspective for a number of dates at Mayor Street Upper.
- Received 6 September 2017Decided 7 December 2017GrantedTransport Infrastructure Ireland
Request for information regarding resurfacing works on a section of the M18 motorway carried out circa August 2015.
- Received 5 December 2017Decided 6 December 2017GrantedTransport Infrastructure Ireland
Request for details of the ranking system used for the selection of four projects selected for road improvements that were announced on 10 May 2017. A list of all the eligible schemes, how they scored or rated and copies of any representations received regarding the selection of the roads and any correspondence with the office of the Minister of Transport, Tourism and Sport regarding the above.
- Received 5 December 2017Decided 6 December 2017Part-GrantedTransport Infrastructure Ireland
Request for details of legal expenditure incurred by TII (and formerly NRA) with regard to the court case over the operation of three motorway service stations and copies of any internal reports, internal audits prepared relating to the above from 1 January 2016 to the current date.
- Received 5 December 2017Decided 6 December 2017RefusedTransport Infrastructure Ireland
Request for all records regarding the failure to introduce a system for speed fines in the Dublin Port Tunnel.
- Received 31 October 2017Decided 28 November 2017GrantedTransport Infrastructure Ireland
Request for copies of any reports, memoranda, briefings, submissions, investigations or other such similar explanatory documents relating to the cessation of Luas services because of roof damage at the Red Cow depot.
- Received 31 October 2017Decided 28 November 2017GrantedTransport Infrastructure Ireland
Request for copies of any records relating to the absence of the villages of Clarinbridge and Kilcolgan from signposting on the new M17/M18 motorway in Galway.
- Received 29 May 2017Decided 24 November 2017Part-GrantedTransport Infrastructure Ireland
Request for details of all reported accidents, engineering reports, maintenance reports, signage and all correspondence in relation to the M11 at Colgreany from 1 January 2016 to 1 May 2017.
- Received 18 October 2017Decided 16 November 2017GrantedTransport Infrastructure Ireland
Request for records regarding M8 motorway roadwork activity on 9 March 2015, the nature of the work, who directed it and the identity of the parties who were carrying out this work. Records in relation to the frequency which road gullies are cleaned and the cleaning programme/regime for maintenance or roadside drainage and what directions, if any, were given to the Maintenance Contractors by TII's consulting engineers in relation to any remedial/maintenance work to be carried out.
- Received 17 October 2017Decided 15 November 2017GrantedTransport Infrastructure Ireland
Request for the number of vehicles from 2014 to date in 2017 that have been seized on behalf of TII where the drivers have failed to pay tolls on the M50, the amount that has been recouped for TII where the sale of vehicles has occurred in order to pay the costs and the amount of revenue from tolls fees on the M50 that were written off by TII from 2014 to date in 2017.
- Received 13 November 2017Decided 12 November 2017GrantedTransport Infrastructure Ireland
Request for Scrim test results for the N76 from 2011 to 2016.
- Received 1 November 2017Decided 4 November 2017GrantedTransport Infrastructure Ireland
Request for records regarding flooding on the N40 Sarsfield Road Fly-over in Cork.
- Received 26 September 2017Decided 24 October 2017GrantedTransport Infrastructure Ireland
Request for the Environmental Impact Statement for the N7 Nenagh to Limerick dual carriageway scheme, to include Volume 1, Volume 2, Volume 3, Volume 4a and Volume 4b.
- Received 9 December 2017Decided 20 October 2017GrantedTransport Infrastructure Ireland
Request for details of Scrim test results on a section of the N24 for the years 2011 and 2012, and details of all surface treatment carried out on this section of the N24 between April 2011 and September 2016.
- Received 18 September 2017Decided 18 October 2017PersonalTransport Infrastructure Ireland
Request for any agreement, protocol, MoU or similar in relation to access by An Garda Síochána to CCTV systems or data (including ANPR data) from systems operated, controlled or accessible by TII, all correspondence from 2015 to date between TII and An Garda Síochána in relation to accessing those CCTV systems or the information generated by them.
- Received 6 December 2017Decided 7 October 2017GrantedTransport Infrastructure Ireland
Request for copies of traffic studies undertaken in 2012 regarding the toll strategy for the M1.
- Received 4 July 2017Decided 5 October 2017GrantedTransport Infrastructure Ireland
Request for all invoices received from Dublin Business Improvement District T/A Dublin Town from 2008 to 2017 for sponsorship events and all copies of requests for sponsorship by Dublin Business Improvement District T/A Dublin Town to TII from 2008 to 2016.
- Received 16 February 2017Decided 3 October 2017GrantedTransport Infrastructure Ireland
Request for results of the call for tender entitled Treatment and Control of Invasive Alien Plant Species such as Knotweed, published 7 March 2016. Details of contracts awarded by mini-tender from the framework, including the names of the businesses awarded contracts and the County Councils involved.
- Received 8 January 2017Decided 25 September 2017GrantedTransport Infrastructure Ireland
Request for a list of all street / roadside artworks / installations / sculptures, etc. funded by the state from 1997 to the present day, including name of the artist, name of the piece, cost of the commission, source of the commission fee, original proposed location for the art and its current location.
- Received 15 August 2017Decided 19 September 2017GrantedTransport Infrastructure Ireland
Request for all documentation, including payments and audit reports, with respect to the contract between TII (formerly NRA) and Contractors Administration Services in relation to the construction of the Nenagh-Limerick Scheme.
- Received 25 October 2016Decided 1 September 2017GrantedTransport Infrastructure Ireland
Request for copy of Enviromental Operation Plans for N17 / N18 Gort to Tuam PPP Scheme.
- Received 17 July 2017Decided 17 August 2017GrantedTransport Infrastructure Ireland
Request for all information, files, documents, reports and submissions relating to the speed limit extension in Ballyheane Village, Co. Mayo.
- Received 18 July 2017Decided 16 August 2017RefusedTransport Infrastructure Ireland
Request for copies of all documentation submitted by the National Monuments Service to the then Thurles Town Council, in relation to Thurles Town Council's reconfiguration of Barry's Bridge which links Liberty Square to Cathedral Street.
- Received 19 July 2017Decided 16 August 2017GrantedTransport Infrastructure Ireland
Copies of any records relating to the development of a solar farm in Loughrea, Co Galway.
- Received 17 July 2017Decided 15 August 2017RefusedTransport Infrastructure Ireland
Request for all relevant documentation relating to the extent of the lands purchased in the vicinity of Ashtown level crossing, Ashtown Road, Mill Lane, Martin Savage Park and/or Pelletstown by the Rail Procurement Agency/TII in the last five years.
- Received 4 April 2017Decided 5 August 2017GrantedTransport Infrastructure Ireland
Request for the number and nature of vehicle accidents on the M50 motorway between January 2012 and March 2017, by location, date, nature and severity.
- Received 2 August 2017Decided 3 August 2017GrantedTransport Infrastructure Ireland
Request for copies of any feasibility reports, briefings, recommendations, memoranda, etc. relating to the possibility of providing a passenger rail station at Carnlough Road/Quarry Road, Dublin 7.
- Received 21 June 2017Decided 19 July 2017GrantedTransport Infrastructure Ireland
Request for a breakdown of all monies received by the Exchequer from the M50 toll for 2014, 2015 and 2016. A breakdown of revenue for penalty payment tolls for the aforementioned years and also the revenue for annual eFlow toll tag.
- Received 19 June 2017Decided 17 July 2017RefusedTransport Infrastructure Ireland
Request for copies of any reports, submissions, memoranda, briefing documents prepared regarding delays to introduce a system for speed fines in the Dublin Tunnel.
- Received 10 September 2018Decided 11 July 2017GrantedTransport Infrastructure Ireland
Request for copies of notes, letters and emails relating to claims by motorists for repayment of VAT on their M50 tolls and other tolls as applicable, arising from the decision of the European Court that VAT was not chargeable on the M50 motorway tolls, and other tolls applicable.
- Received 1 September 2017Decided 2 July 2017GrantedTransport Infrastructure Ireland
Request for all payments made to Limerick Tunnel PPP Company during 2016 under the traffic guarantee contract mechanism.
- Received 13 April 2017Decided 20 June 2017Part-GrantedTransport Infrastructure Ireland
Any record, in the possession of TII or in the possession of its servants or agents touching upon or concerning the award of the contract for the N2 Blakestown Cross to Funshog road scheme.
- Received 22 May 2017Decided 20 June 2017GrantedTransport Infrastructure Ireland
Request for all records in relation to road accidents which have occurred between junctions 9 and 13 on the M8 since the scheme opened.
- Received 17 May 2017Decided 15 June 2017GrantedTransport Infrastructure Ireland
Request for the number of tolls issued for the Dublin Tunnel, M50 eFlow, M1 Dundalk Western Bypass and M4 Kilcock/Kinnegad, the number and value of the tolls that were paid and not been paid to date and the number of cases taken through Pierse Fitzgibbon Solicitors as a result of non-payment of tolls.
- Received 15 May 2017Decided 13 June 2017GrantedTransport Infrastructure Ireland
Request for (1) amount of unpaid tolls for 2015 to date, (2) number of journeys made through the barrier free toll in 2015 to date, (3) the number of journeys which have not been paid for, (4) the number of unpaid tolls with cars registered in N.I. and other countries, (5) confirmation of criminal proceedings been brought against any of the drivers who have outstanding fees, and (6) confirmation of the agency sought to recoup money owed.
- Received 15 May 2017Decided 13 June 2017GrantedTransport Infrastructure Ireland
Request for (1) all written communications between TII, Road Safety Authority, Galway County Council, Galway City Council, An Garda Síochána, the Department of Transport and any other agencies or individuals regarding the three-year road safety strategy, (2) all communications generated by TII regarding any role or involvement of the Galway City and/or County Joint Policing Committee concerning the road safety strategy, (3) all reports created by TII, which relate to its deliberations regarding the above road safety strategy, and (4) A copy of the Galway City & County Road Safety Strategy.
- Received 10 September 2017Decided 11 June 2017RefusedTransport Infrastructure Ireland
Request for copies of documents including submissions, emails, letters, notes of conversations on proposals to charge lorries for use of the Dublin Tunnel.
- Received 24 April 2017Decided 24 May 2017RefusedTransport Infrastructure Ireland
Request for copies of any records between 1 January 2016 to current date, which discusses the possibility that use of private cars in Dublin Tunnel is becoming excessive during peak rush hours.
- Received 19 April 2017Decided 18 May 2017GrantedTransport Infrastructure Ireland
Request for all correspondence between the Dáil TDs and TII (or NRA) in relation to the following issues, (1) funding for the construction of roads or road-related transport infrastructure (e.g. bridges, footpaths) in County Tipperary, and (2) requests for improvement or upgrades to roads in County Tipperary. Also minutes of meetings relevant to these issues and any internal correspondence within TII that relates to these matters between 2011 and present day.
- Received 7 October 2017Decided 9 May 2017GrantedTransport Infrastructure Ireland
Request for all records held by TII of communications between Cork County Council, the National Roads Authority, utility providers, the Environmental Protection Agency, etc. relating to the preparation of route options for the proposed M28 Motorway. Also any records relating to the selection of the route option at Shanbally and Barnahely and all other general information which is in any way relevant to the preparation of this section of the route.
- Received 8 August 2017Decided 9 May 2017GrantedTransport Infrastructure Ireland
Copy of all TII replies to TDs in respect of PQs from January 2016 to August 2017.
- Received 4 April 2017Decided 5 May 2017GrantedTransport Infrastructure Ireland
Request for all records held by TII relating to the Kilkenny Central Access scheme project in Kilkenny City.
- Received 12 May 2016Decided 1 May 2017GrantedTransport Infrastructure Ireland
Request for the amount paid by Irish road users for toll roads in Ireland in 2015 and the excess amount paid by Irish road users for toll roads in Ireland in 2015 due to circumstances such as machines not providing change.
- Received 27 March 2017Decided 26 April 2017GrantedTransport Infrastructure Ireland
Request for (1) the number of reported accidents involving cyclists falling on Luas tracks at Luas Cross City works, plus the date and outcome of each occurrence between 1 June 2013 & 24 March 2017, and (2) all complaints correspondence & emails between cyclists and TII regarding Luas Cross City works between 1 June 2013 & 24 March 2017.
- Received 28 March 2017Decided 26 April 2017GrantedTransport Infrastructure Ireland
Request for (1) the amount that TII received in toll fees from the M50 and Dublin Tunnel toll facility in the years 2014-2016, and (2) the amount received and percentage TII re-invested in repairs to roads within their remit, new road signs, road markings etc.
- Received 20 January 2017Decided 24 April 2017RefusedTransport Infrastructure Ireland
Request for copy of the Dundalk Western Bypass PPP contract between Transport Infrastructure Ireland and Celtic Roads Group that was entered into in 2004.
- Received 11 June 2017Decided 12 April 2017GrantedTransport Infrastructure Ireland
Request for figures detailing the number of occasions on which the Dublin and Jack Lynch Tunnels have been closed to traffic for each year between 1 January 2014 and 1 November 2017, including data of breakdown of dates, reasons for and lengths of closures and what parts of the tunnels were closed.
- Received 9 April 2017Decided 10 April 2017GrantedTransport Infrastructure Ireland
Request for copies of any reports, internal memos, briefing notes relating to safety and the volume of crashes on the M50 motorway from 1 January 2016 to 6 September 2017.